Loading...
Gulf Bearing-LR 950904TECHNOLOGIES INC Maxim Tech. · Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 CLIENT NO.: 3200037 REPORT NO.: 28627 Gulf Bearing DATE OF SERVICE: 8/07/95 Coppell, Texas AUTHORIZATION: ongoing REPORT DATE: 9/04/95 Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 3 - 5" AIR: 3 - 6% METHOD OF TEST: ASTM C-39 ASTM C-143 PROJECT DATA CLASS OF CONCRETE: Mix Number 40 DATE OF PLACEMENT: 8/07/95 TIME SAMPLED: 04:45AM BY: Frank Tisdale, TEMPERATURE ('F)-AIR: 78 CONCRETE: 91 TRUCK NO: 280 TICKET NO: 7012638 AIR CONTENT(%): 2.0 LOCATION OF PLACEMENT: Tilt wall panel (/53, bottom half. CET REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. (inches) TESTED (days) (in.) (sq.ln.) (lbs. force) (psi) 1 1 5.00 8/14/95 7 6.00 28.27 95880 3390 1 2 5. O0 9/04/95 28 6. O0 28.27 126450 4470 1 3 5. O0 9/04/95 28 6. O0 28.27 124230 4390 1 4 HOLD HOLD REMARKS ADDITIONAL COMMENTS: 10 gallons of water added prior to sample. Sample taken at pump discharge, contractor notified of concrete temperature and air content. Technician: Frank Tisdale, CET Started: 03:30AM Stopped: 09:30AM Report Of Tests Continued On Page 2 1001 LW Our letters and reports are for the exclusive use of the client to whom they are addressed a. nd shall not .be _repr.o~uced ex. cept in. full without the approval o.f th.e .testi,n.g I.aboratgry.. The use of, al3ply only to the sample [este(~ ano/or inspec~ecl, anti are no: inolcauve o, t,u qM~tll%lM~O wi a~,,,,7 ,u~,,,,~ ~ ~' ' Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OFSERVICE: 8/07/95 REPORT NO. PAGE 2 SET NO. 2 28627 CONTRACTOR: Rogers O'Br£en CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 3 - 5" AIR: 3-6% METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i hued) PROJECT DATA CLASS OF CONCRETE: Mix Number 40 DATE OF PLACEMENT: 8/07/95 TIME SAMPLED: 05:40AM BY: Frank Tisdale, CF.T TEMPERATURE ('F) - AIR: 77 CONCRETE: 89 TRUCK NO: 574 TICKET NO: 7012648 AIR CONTENT(%): 2.0 LOCATION OF PLACEMENT: Tilt wall panel 4~50, bottom half REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. (inches) TESTED (days) (in.) (sq.in.) (lbs. force) (psi) 2 1 4.50 8/14/95 7 6.00 28.27 109090 3860 2 2 4.50 9/04/95 28 6.00 28.27 140290 4960 2 3 4.50 9/04/95 28 6.00 28.27 139300 4930 2 4 HOLD HOLD REMARKS ADDmONAL COMMENTS: 20 gallons of water added prior to sample, sample taken at pump discharge. Contractor notified of air content. Technician: Frank Tisdale, CET Started: 03:30AM Stopped: 09:30AM Report Of Tests Continued On Page 3 1001 LW Our etters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the approval, o.f th.e,testl,n.g la, boratpry,. The use of. ~uf, na.m,.e_ m_~us.[?_c.e, iv~.,o_u_r _.writt__e_n_._a~o~p,r..o¥~al;_,.Ot~.,r I..e. tt.e~r_sllaanrd,.rr~dPuO~[ apply only to the sample testea ana/or inspectea, aha are not inolc~tlVe [~T T~II~ qM~lll[Itl{~ U! ~,IJI,7~,/CHLI)' ~u~u~m~ u~ o~,,~ a p · Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OFSERVlCE: 8/07/95 REPORT NO. PAGE 3 SET NO. 3 28627 CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 3- 5" AIR: 3-6~ METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CLASS OF CONCRETE: Mix Number 40 DATE OF PLACEMENT: 8/07/95 TIME SAMPLED: 06: 58AM BY: Frank Tisdale, TEMPERATURE ('F)-AIR: 77 CONCRETE: 88 TRUCK NO: 569 TICKET NO: 7012660 AIR CONTENT(%): 2.3 LOCATION OF PLACEMENT: Tilt wall panel ~45 and ~46. ~46 and bottom 1/2 of ~45. Top 1/5 of CET CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH -6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in.) (sq.in.) (lbs. force) COMPRESSIVE STRENGTH (psi) REMARKS 3 1 5.25 8/14/95 7 6.00 28.27 92860 3280 3 2 5.25 9/04/95 28 6.00 28.27 119180 4210 3 3 5.25 9/04/95 28 6.00 28.27 117630 4160 3 4 HOLD HOLD ADDITIONAL COMMENTS: 5 gallons of water added prior to sampling. Sample taken at pump discharge. Contractor notified of air content. Technician: Frank Tisdale, CET Started: 03:30AM Stopped: 09:30AM Report Distribution: MAXIM TECH.~OU~W~TERN LABS (1) {;uif Bearing, [nc. (1) Gromatzky. Dupree & Associates (1) Brockette, Davis, Drake (2) Rogers O'Brien F. King Cook, P.E. (1) city of coppett Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except In full wRho, ut the approval o.f th.e ,testi,n.g I,aborat.ory: The use _of ,o_u~n_a_.m,.~_ m_.us.[?_c.e.i_v~o_u~_ _wr. ~..e..n~.a..p~p[.ov~alg.,~u~r I.,e. tt~e~r~ilaarnd,.[oe~uOc~[ apply only to the sample ~es~ea aha/or inspec~ea, ana are not inQiCal[iVe Ol trl~ qu~llUU¢O u~ aWHa~=[,~}' i~H~,~ w. ~,,,, ~ [~ v - TE4:HNOLOGIES IN4: Maxim Tech.. Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) g20-1891 CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 28771 DATE OF SERVICE: 8/09/95 AUTHORIZATION: ongoing REPORT DATE: 9/06/95 Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" Max. AIR: N/A METHOO OF TEST: ASTM C-39 ASTM C- 143 PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENT: 8/09/95 TIME SA~PtMD: 05: 26AM BY: Larry Bracken TEMPERATURE ('F)-AIR: 78 CONCR~-~: 84 TRUCK NO: 282 ~]CK~r NO: 7012751 AIR CONTENT(%): N/A LOCA~ON OF PtACEMENT: Slab-on-grade @ Grid B/ll.5 CYLINDER MEASURED MARKED SLUMP DATE AGE DIAMETER SET NO. {inches) TESTED (days) (in.) 1 1 5.25 8/16/95 7 6.00 1 2 5.25 9/06/95 28 6.00 1 3 5.25 9/06/95 28 6.00 1 4 HOLD HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AREA LOAD STRENGTH (sq,in,) {lbs. force) (psi) 28.27 110590 3910 28,27 135420 4790 28.27 140180 4960 REMARKS ADDmONAL COMMENTS: Added 10 gallons water prior to test sample. truck discharge. Test sample taken at Technician: Larry Bracken Started: 04:30AM Stopped: 08:00AM Report Of Tests Continued On Page 2 1001 LW Our letters and re orts are for the exclusive use of the client .to whom they are ad. dressed a..n.d shall not .be _reproduced except in P rato The use o~ ourname m st receive our wrr~en approval uur letters and reports full without the approval of the test ng labo ry. · apply only to the sample tested and/or Inspecte~l, and are not indicative o~ the quantities of appareritly identical or similar products. Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 8/09/95 REPORT NO. PAGE 2 SET NO. 2 28771 CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" Max. AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENT: 8/09/95 TIME SAMPLED: 06: 21AM BY: Larry Bracken TEMPERATURE ('F)-AIR: 78 CONCRETE: 83 TRUCK NO: 280 TICKET NO: 7012361 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Slab-on-grade @ Grid #C.7/11 CYLINDER MARKED SET NO. MEASURED SLUMP (Inches) 2 1 6.00 2 2 6.00 2 3 6.00 2 4 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DATE AGE DIAMETER AREA LOAD STRENGTH TESTED (days) (in.) (sq.in.) (lbs. force) (psi) 8/16/95 7 6.00 28.27 106770 3780 9/06/95 28 6.00 28.27 135190 4780 9/06/95 28 6.00 28.27 132930 4700 HOLD HOLD REMARKS ADDmONAL COMMENTS: Test sample taken at truck discharge. Technician: Larry Bracken Started: 04:30AM Stopped: 08:00AM Report Distribution: MAXIM TECH.eS~ (1) Gutf Bearing, Inc. (1) I;romatzky, Dup~ee & Associates (1) Brockette, Davis, Drake ,oD.r. o,,ri. (1) City of CoppeLL (1) City of Coppe[[ 1001 LW Our letters and reports are for the exclusive use ofthe client .to whom they are addressed and shall not be reproduced except In apply only to ~ne sample teszea ana/or tnspec~ea, LABS TECHNOLOGIES INC Maxim Tech. · Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF IN-PLACE DENSITY CLIENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 CUENT NO.: 3200037 REPORT NO.: 29952 PROJECT: Gulf Bearing DATE OF SERVICE: 8/30/95 Coppell, Texas AUTHORIZATION: ongoing REPORT DATE: 9/01/95 SERVICES: Perform in-place density and moisture content tests to determine the degree of field compaction. CONTRACTOR: Rogers O'Brien TEST OF: Wall backfill Wall backfill PROJECT DATA MATERIALS 24164-Brown silty clay 25363-Reddish bwn clayey sand* MOISTURE~ENSITY RELATIONS OPTIMUM MAXIMUM MOISTURE % DENSITY pd 18.0 106.5 12.5 114.5 METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 SPECIFICATION DENSITY: 95% MIN. DENSITY MOISTURE: - 1/+4% opt moist TEST NO LOCATION 1. East wall exterior 160' north, first lift. 2. East wall exterior 60' north, first lift. 3. East wall interior, 50' north, first lift. REPORT OF TESTS from from from FIELD OPTIMUM FIELD MAXIMUM MOISTURE MOISTURE DENSITY DENSITY (%) (%) (Pc~ (Pc~ 17.0 18.0 100.9 106.5 17.6 18.0 100.7 106.5 10.8 * 12.5 99.6 114.5 An asterisk (*) appears nex~ to test results which do NOT meet the prooect specilications as noted above. ADDmONAL COMMENTS: * with dark brown clay (25363) DENSITY 95 95 87 Technician: Arthur Etherly III, CET Started: 07:00AM Stopped: 09:00AM (1) GuLf Bearing, Inc. (1) Gro~atzky, Dupree & Associates (1) Srockette, Davis, Drake (2) Rogers O'Brien (1) City of Copper[ (1) City of Coppe[I. 1007 LW Our letters and reports are for the exclus ye use of the cent to whom they are addressed and shall not be reproduced except in full without the approval of the testing laboratory The use of ourname must rece ve our written approval. Our letters and reports apply only to the sample tested and/or inspecteH, and are not indicative of the cluantities of apparently identical or similar products.