Loading...
KFC & Pizza Hut-CS 890922 AYRES ASSOCIATES '- September 22, 1989 Attn: Ru~ell Doyle 255 Par~way Blvd Co~j~ll, Texas 75019 Re~ As-Built Conditions Dear Russell: The attached drawings have been modified to conform to construction records. The field changes are reflected on these drawings. All pavement was installed according to the City approved plans within a tolerance of _+0.20 feet. In addition these plans were developed according to the approved preliminary grading and drainage plan for the proposed Sandy Lake Shopping Center. Mr. Ardinger at the time of construction of construction of said shopping center will be adding a storm sewer system to alleviate all drainage problems. Our design was to adhere to the proposed shopping center plans to as not to create future problems. All of this was a result of the D.R.C. meetings with the City Staff and Ginn, Inc. If you should have any questions please contact me at (214) 570-5577. Sincerely, Owen Ayres and Associates, Inc. Robert A. Howman, Senior Technician Owen Ayres & Associates Inc. Engineers / Planners I Surveyors P.O. Box 612409 Dallas, Texas 75261 2110 Walnut Hill Lane, Suite 134, Las Colinas Irving, Texas 75038 (214) 570-5577