Loading...
KFC & Pizza Hut-CS 890727ASSOCIATES July 27, 19_89,, .... s~11' ' ' ~' ':;-:' Z].:_ '.:_ ~_ ......... ~r. Ru Doyle, P.E. ,. i,i''l AUG - 2 1989 City o~/Coppel 1 P.O. ~ox 478 Cop~ll, Texas 75019 / ~(~-. Kentucky Fried Chicken / Denton Tap Road Dear Mr. Doyle, After my meeting with Benjamin Delacruz of your office in regards to the engineering review of the proposed restaurant on Denton Tap Road. Regarding the utility plan (sheet 5) 1. The question was on the maintanance of the sewer lateral. The 15' utility easement was a private utility between Mr. Ardinger and Kentucky Fried Chicken and will be maintaned by Kentucky Fried Chicken. 2. The size of line was questioned. A 6" P.V.C. line was found to be existing and we installed a 4" lateral, per the building code, to the existing clean-out. In the letter from Ginn, Inc., dated April 13, 1989, no mention of the change in size was requested. 3. The existing 8" water line was found to be on the property line and not under the pavement as shown on the Denton Tap Road paving plans. So not to necessitate the need for a single trench. 4. A dimension of 3' from the back of the curb to the center line of proposed fire hydrant was added. Regarding the paving and grading sheets (sheet 6 and 7) 1. All sand cushion notes have been changed to read 6" lime stabilized soil (6%} per letter from Ginn, Inc., dated April 13, 1989. 2. The reference to the sugestion of using 8" pavement in fire lane, we at this time opt to use 6" pavement per the Ginn, Inc. letter. 3. On the grading plan, we added a 12" concrete flume at the low point in the problem area to alleviate the ponding problem. 4. Note on property to the south, the grading of the property will be at the time of the future shopping center is being built. We did however, addhere to the proposed grading plan for the shopping center. Owen Ayres & Associates Inc. Engineers I Planners I Surveyors POi BOX 612409 Dallas. Texas 75261 2110 Walnut Hill Lane, Suite 134, Las Colinas Irving, Texas 75038 (2!4) 570~5577 Mr. Russell Doyle ~-' ~-- July 27, 1989 Page 2 Regarding any other changes requested, hopefully all other changes have been made to the drawings. Also at this point we are under construction and need to expidite this approval process. The original review of our engineering plans was April 13, 1989, which the letter indicates. If there is any thing we can do to expidite this approval please feel free to call me @ 570-5577. Sincerely, ~j3wqn AyrQ~ & Associates, Inc. Robert A. Howman Sr. Survey Coodinator