KFC & Pizza Hut-CS 890727ASSOCIATES
July 27, 19_89,, ....
s~11' ' ' ~' ':;-:' Z].:_ '.:_ ~_ .........
~r. Ru Doyle, P.E. ,. i,i''l AUG - 2 1989
City o~/Coppel 1
P.O. ~ox 478
Cop~ll, Texas 75019
/
~(~-. Kentucky Fried Chicken
/ Denton Tap Road
Dear Mr. Doyle,
After my meeting with Benjamin Delacruz of your office in regards to the
engineering review of the proposed restaurant on Denton Tap Road.
Regarding the utility plan (sheet 5)
1. The question was on the maintanance of the sewer lateral. The 15' utility
easement was a private utility between Mr. Ardinger and Kentucky Fried
Chicken and will be maintaned by Kentucky Fried Chicken.
2. The size of line was questioned. A 6" P.V.C. line was found to be existing
and we installed a 4" lateral, per the building code, to the existing
clean-out. In the letter from Ginn, Inc., dated April 13, 1989, no mention
of the change in size was requested.
3. The existing 8" water line was found to be on the property line and not
under the pavement as shown on the Denton Tap Road paving plans. So not to
necessitate the need for a single trench.
4. A dimension of 3' from the back of the curb to the center line of proposed
fire hydrant was added.
Regarding the paving and grading sheets (sheet 6 and 7)
1. All sand cushion notes have been changed to read 6" lime stabilized soil
(6%} per letter from Ginn, Inc., dated April 13, 1989.
2. The reference to the sugestion of using 8" pavement in fire lane, we at
this time opt to use 6" pavement per the Ginn, Inc. letter.
3. On the grading plan, we added a 12" concrete flume at the low point in the
problem area to alleviate the ponding problem.
4. Note on property to the south, the grading of the property will be at the
time of the future shopping center is being built. We did however, addhere
to the proposed grading plan for the shopping center.
Owen Ayres & Associates Inc.
Engineers I Planners I Surveyors
POi BOX 612409 Dallas. Texas 75261
2110 Walnut Hill Lane, Suite 134, Las Colinas
Irving, Texas 75038 (2!4) 570~5577
Mr. Russell Doyle ~-' ~--
July 27, 1989
Page 2
Regarding any other changes requested, hopefully all other changes have been
made to the drawings. Also at this point we are under construction and need to
expidite this approval process. The original review of our engineering plans
was April 13, 1989, which the letter indicates.
If there is any thing we can do to expidite this approval please feel free to
call me @ 570-5577.
Sincerely,
~j3wqn AyrQ~ & Associates, Inc.
Robert A. Howman
Sr. Survey Coodinator