First United-LR 990726 · GEOTECHNICAL ENGINEERING
E o ENVIRONMENTALCONSULTING GEE Consultants, Inc.
!
i E i · CONSTRUCTION ,MATERIALS TESTING
0046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (~214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: July 26, 1999 Date Concrete Placed: June 28. 1999 Standard 6"x12"
Chent: First United Methodist Church of Coppell Area 28.27 Square Inches
Project: First United Methodist Church-Sanctua~, Concrete Report No. 27
Coppell. Texas ~' -I tq
Concrete Supplier and Plaut: Mid-Cities Ready Mix
Locanon of Placement: Slab
MATERIALS s ....... 5SD Ba,c,~ Wts. OBSERVATION DAT~
De~cnpmm .Lbs-CuYdl ~
Mix Number: N;A ~, ~, Time Sample Batched: /L1:54 am
CoarseCement:Aegre~,ate: Eq~q ~ ' Time Sampled: 12:45 pm
Fly Ash: Sample Location: 4' N. & 4' W. of SE corner
Truck/Ticket No: -104.,58806
- - - Temperature:
Intermediate Aggregate: ~~,~ ~tI Ambient Range'~ 89°F
Fine Aggregate: Cancrete Range:
Admixtures: Slump Range ~inchesi: 6"
· Weather Conditions: Partly Cloudy
Time Started: 11:00 am
2 Time Completed: O1:30 pm
AOded Water: 0 Gallons Sample Air Content ( %): N,,'A
Total Cubic Yards Placed: 10
Required Strength ~ Lbs.: sq. in. }: .3.000
:.;p~ci-n¢. Mt:ar, urea .~,ge 7 Total I.~md ~.~C°mor¢~"~~ Re.mares
I
FUMC i 13 8 07.:06i99 54,420 /f[,930
28 07.-"26/99 76,280 ~' X, 2,700
FUMC 114 6" '
FUMC 115 28 07."26/99 71,140 2,520
FUMC 116 56 08/23.'99
.\STM C-3' .C-39.C-:43 ~[.'n.ess Notec Other'o.'~se~ Cylinders Made 1~'. DF
Remarks and!or Distnbunon:
cc: Ms. Lynn Johnson - First United Methodist Church
Mr. Charles Harper - Harper Perkins Architects
Mr. Larry Davis - City of Coppell
Mr. Bill Anderson - Dowdey. Anderson & Associates. Inc.
Mr. Mel Fencl - Offutt Construction