Loading...
ST9704TR-CS 980817August 17, 1998 David Mirtaheri Integrated Roadway Service 10701 Shady Trail Dallas, TX 75220 Traffic Signal Installation Project 2nd High School Access / ST 97-04 TR Bid #Q 0898-01 Dear Sir: The City of Coppell will be accepting bids on the referenced project prior to August 31, 1998, 2:00 p.m. at which time they will be publicly opened and read. The Scope of Work is generally as follows: This project shall consist of the installation of a traffic signal at the 2nd High School Access on Denton Tap Road, south of and adjacent to Sonic Drive-In. Work shall include all components necessary for the "turn key" construction of the 2rid High School Access as shown in the plans for ST 97-04 TR, including but not limited to: mast arms, signals/signal heads, poles, controllers and cabinet, conduit, opticore, loop detectors, pavement markings, pullboxes, etc. For additional information, please feel free to contact Jim Ragsdill, Purchasing Agent at (214) 304-3698 or the Engineering Department at (214) 304-3679. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering and Public Works cc: Jim Ragsdill, Purchasing Agent ~le/kgriffin/ST 97-04TR specltr Letters mailed to following contractors: High Tech Signals P.O. Box 24071 Ft. Worth, TX 76124 (817) 429-8638 David Mirtaheri Integrated Roadway Service 10701 Shady Trail Dallas, TX 75220 (214) 352-1937 Sharock Electric P.O. Box 8360 Ft.Worth, TX 76124 (817) 429-8502 Emesto Lopez Lopez Electric 3110 Ruder Dallas, TX 75212 (214) 638-8386 Jeff Bryan Durable Specialties P.O. Box 381788 1211 S. Alexander Duncanville, TX 75138