Loading...
First United-LR 990129G o GEOTECHNICAL ENGINEERING E GEE Consultants, Inc. E ° CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive ° Dallas, Texas 75229 · (214) 352-5433 ° Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Januat3~, 29, 1999 Date Concrete Placed: JallUal~.' 15, 1999 Standard 6"x12" Client: First United Methodist Church of Coppell Area 28.27 Square Inches Project: First United Methodist Church-Sanctum3..' Concrete Report No. 6 Coppell, Texas Ct~ntra,'tor' Strand Tech. Inc. Project No.: 298-0394 Concrete Supplier and Plant: Mid-Cities Locauon of Placement: Slab - South end MATERIALS s ....... ~sD B~tc,, ,¥~. INSPECTION DATA Descr:puon , Los;('uYd~ .'¥hx Number: 933t Time Sample Batched: 10:27 am Cement: Time Samplea: ! 1:20 am Fly A. sh: Sample Locauon: SEcornerofbu,lding~Sample mgrade beam- ' Grid 13. D.6 to E.; & E.~-I2 to 13~ Coarse Aggregate: Truck/Ticket No: 50,8/46935 Intermediate Aggregate: Temperature: Fine Aggregate: Ambmnt Range: 57°F Admixtures: Concrete Range: 56'F Slump Range ~ inches): ? :~.:," I Weather Conditions: Clear 2 Time Started: 09:00 am Added Water: l0 Gallons Time Completed: 03:45 pm Sample A,r Content t~ ~: 4.5% Total Cub,c Yards Placed: 30 Requ,red Strength ~Lbs.isq.ln.~: 3.000 FUMC 29 7 01/22/99 49,100 1.740 FUMC 30 14 01,'29/99 63,920 2,260 7~.:i "* FUMC 31 28 02,." 12~99 FUMC 32 H HOLD Yes~ Me,.hods Utilized Frae:ute Regular Cvlinders Made By: JS ASTM C-31.C-39.C-~43 .Ll~less Noted Otherv.-ise, - ' Remarks and.'or Dismbution: * - Slump reported to Superintendent cc: Ms. Lynn Johnson - First United Methodist Church Mr. Charles Harper - Harper Perkins Architects Mr. LarD' Davis - City of Coppell Mr. Bill Anderson - Dowdey, Anderson & Associates. Inc. ?,1~ ;e',tcrs and reports arc tot' ;l'e c~,clus~ve usc of the client ~o whom t~y arc aadrcsscd and shall no~ be reproduce~, .~-ilhou£ ting t-ull approval of GEE Consultants. Inc. The use of our ~amc must :eccwe