First United-LR 980903 GEOTECHNICAL ENGINEERING
. GEE Consultants,
Inc.
CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 ° Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: September 3. 1998 Date Concrete Placed: August 6, 1998 Standard 6"x12"
Client: First United Methodist Church Area 28.27 Square Inches
Project: First United Methodist Church of Coppell Concrete Report No.: 1
C,..'.ntrac:or: ProJect No.: 298-0275
Concrete Suppher and Plant: Redv Mix Concrete #10
Locatiou of Placement: Approach
MATERIALS s ...... ssD ~ ..... ,,',, INSPECTION DATA
Dcs;r,?t.m' iLbs.t'aYd~
Mix Number: 908 Time Sample Batched: 10:25 am
Cement: Time Sampled: I ! :20 am
Ely Ash: Sample Locanon: NW comer of approach f[Ol]~ Be~el School Rd
Track:Ticket No: 126:105147
Coarse Aggregate: Temperature:
Inter:nediate Aggregate: Ambient Range: 85:F
Fh~e Aggregate: Concrete Range: 93:F
Adnuxtures: Slump Range (roches,: 5%'
Wea~er Condinons: Overcast
: Time Sm~ed: 05:30 am
2 Time Completed: 12:00 pm
Added Water: t0 Gallon~ Sample Air Content (%'~: !~
Total Cubic Yards Placed: 40
Required Strength ~Lbs.:sq.in.~: 3.500
FUM I 7 08/13..'98 89.040 3.150
FUM 2 28 09.;03..'98 129.760 4.590
5 1/2"
FUM 3 28 09;03..'98 123.220 4.360
FUM 4 H HOLD
i'e~t 5.teti~o~s L/:inze0 .'-rac:ure Regular Cylinders Made BY': BG
· x. STM C-2: .C-59.C- I.:'3 . :.',ties. No:et. -'.): ~erv.-ise, - -
Remarks and:or D~strtbution:
cc: Ms. Lynn Johnson - First United Methodist Church
Mr. Charles Harper - Harper Perkins Archaects
Mr. LarD' Davis - City or' Coppell
Mr. Bill Anderson - Dowdey, Anderson & Associates, Inc.