First United-LR 980807 G ° GEOTECHNICAL ENGINEERING
E · ENVIRONMENTAL CONSULTING GEE Consultants,
Inc.
E · CONSTRUCTION ,MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · t214) 352-5433 · Fax (214.) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: August 7. 1998 Test Date: August 6, 1998
Client: First United Methodist Church General Report No.: 1
Project First United Methodist Church Project No.: 298-0275
of Coppell
Identification Reinforcing Steel Inspection
Method of Test Visual Inspection
Page 1 of 1
ResuLts
On August 6. 1998. reinforcing steel was inspected at the following location:
Approaches:
i. Vanbebber Dr. in front of Westwood Ct.
2. Bethel School Rd.
There were no discrepancies.
Tech: BG
cc: Ms. L>nn Johnson - First Umted Methodist Church
Mr. Charles Harper - Harper Perkins Archaects
Mr. Larry Davis - City of Copp¢ll
Mr. Bill Anderson- Dowdey. Anderson & Associates Inc.i 0~/~.~%~
p.,-.