First United-CS000106January 6, 2000
H. James McCullough
MC2
6824 Inwood Dr.
Fort Worth, TX 76180
RE: First United Methodist Church
Final Walk-thru
Dear James:
Please be advised that a walk-through has been scheduled for Monday, January 10, 2000 at 2:00
p.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972-304-3684 at your earliest convenience.
Sincerely,
Larry Davis
Construction Inspector
cc: Mike Martin, Assistant City Engineer
Debi Ingram, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Bill Anderson, Dowdey-Anderson (fax: 972-931-9538)
Lynn Johnson, Ia United Meth. Ch. (fax: 972-393-1260)