Loading...
First United-CS000106January 6, 2000 H. James McCullough MC2 6824 Inwood Dr. Fort Worth, TX 76180 RE: First United Methodist Church Final Walk-thru Dear James: Please be advised that a walk-through has been scheduled for Monday, January 10, 2000 at 2:00 p.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-3684 at your earliest convenience. Sincerely, Larry Davis Construction Inspector cc: Mike Martin, Assistant City Engineer Debi Ingram, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Bill Anderson, Dowdey-Anderson (fax: 972-931-9538) Lynn Johnson, Ia United Meth. Ch. (fax: 972-393-1260)