Loading...
First United-CS 990910 The City With A Beautiful Future 972-462-0022 //~'~/ ~O0~EO~¢7T~XAS 75019 September 10, 1999 FILE Lynn Johnson, Project Mgr. First United Methodist Church Heartz Road Coppell, Texas 75019 RE: First United Methodist Church Parking Lot Final Acceptance Dear Ms. Johnson: A final inspection of the parking area and sidewalk for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Larry Cons~u~atv- ll;S~nspectO r cc: Kelly Jordan, Excel Group (fax 214-351-2828) Bill Anderson, Dowdey Anderson (fax 972-931-9538) Mike Martin, Assistant City Engineer Doug Stevens, Engineering Technician Greg Jones, Chief Building Official Lee Stone, Commercial Inspector Davis/metlr~fa