Loading...
First United-CS 990211 ~ 9?2 304 ~547 TO: Larry Davis, Construction Inspector FROM: Brent Adams, Streets Division Walk-thru First Methodist Church W.Parking Lot 2/10/99 Listed below are Street Division comments relative to walk-thru. 1. Vard~ebber Driveway: Seal curb returns both east & west side. -~ ADA ramp west side driveway toe ~tub at ~idewalk. Apron need control joint at center and to the east side of :t~. driveway '~.~..: Redwood header needs sealed. '~ ADA on east side of driveway saw cut and re-form entire ADA ?~" ramp. _ Deficiencies marked in white paint. 2. VanBebber/Heartz: ADA ram~s are poured on top of paver lug. Thi~ is wrong. Pavers need cut to match. ,, Seal re~wood a~ the top of ADA ramps. '.~ "".:~-. Deficiencies marked in white paint ,';.-.. 3. Neartz: sidewalk ramp curb needs to be sealed. ~4.. Seal all sidewalk redwood headers. .~.~.. 4. Heartz/Bethel School: ADA ramp wrong also. 02×11×99 10:28 CITY OF COPPELL a CITY OF COPPELL N0.052 Q02 5. Bethel School driveway: rout & seal random cracks across %-. ,.~.~ , Driveway. ~" Seal curb re=urns. Seal along existing concrete on Bethel School.