First United-CS 990211 ~ 9?2 304 ~547
TO: Larry Davis, Construction Inspector
FROM: Brent Adams, Streets Division
Walk-thru First Methodist Church W.Parking Lot
2/10/99
Listed below are Street Division comments relative to walk-thru.
1. Vard~ebber Driveway: Seal curb returns both east & west side.
-~ ADA ramp west side driveway toe ~tub at ~idewalk.
Apron need control joint at center and to the east side of
:t~. driveway
'~.~..: Redwood header needs sealed.
'~ ADA on east side of driveway saw cut and re-form entire ADA
?~" ramp. _
Deficiencies marked in white paint.
2. VanBebber/Heartz: ADA ram~s are poured on top of paver lug.
Thi~ is wrong.
Pavers need cut to match.
,, Seal re~wood a~ the top of ADA ramps.
'.~
"".:~-. Deficiencies marked in white paint
,';.-.. 3. Neartz: sidewalk ramp curb needs to be sealed.
~4.. Seal all sidewalk redwood headers.
.~.~.. 4. Heartz/Bethel School: ADA ramp wrong also.
02×11×99 10:28 CITY OF COPPELL a CITY OF COPPELL N0.052 Q02
5. Bethel School driveway: rout & seal random cracks across
%-.
,.~.~ , Driveway.
~" Seal curb re=urns.
Seal along existing concrete on Bethel School.