Loading...
First United-CS 980827 . ~ ~,~ P.Q. Box 478 75019 /~~~~ C o ope il. Texas The City With A Beautiful Future 972-462-0022 ~PO BOX 478 COPPELL. TEXAS 75019 August 27, 1998 Mr. William Anderson i ,.¢. \ Dowdey, Anderson & Associates, Inc. 5225 Village Creek Dr., Suite 200 Piano, TX 75093 RE: First United Methodist Church Dear Mr. Anderson: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: 1. Indicate on the paving plan the location/dimensions of the fire lane. 2. Use the City of Coppell standard construction detail for the proposed concrete flume at the northeast comer of the parking lot. 3. As per The City of Coppell Subdivision Ordinance, the required concrete paving thickness is 5" for private paving, 6" for fire lanes, with 6" lime stabilized subgrade. Any variance request to the lime stabilization requirements should be sent via letter to the City Engineer. Increased thickness to all paving or increased strength for all paving, in lieu of lime stabilization, has been approved in the past. 4. Any utility clearance less than 24" will require concrete encasement. The City Engineer must approve any lowering of public utilities. 5. Locations of all fire hydrants shall be approved by the City Fire Marshall, Travis Crump, at (972)304-3503. 6. On the drainage plan, drainage area 4 is shown to drain through drainage area 1 and then to an adjacent invert alley. This drainage pattern does not match what is shown for this area as per as- built plans for adjacent developments/facilities. The City needs supporting calculations showing that the proposed drainage plan will work. 7. Please include a plat with your set of drawings. There are various other comments throughout the plans. Once these comments have been addressed, these marked plans and two sets of revised plans should be submitted to the City for review'. If you have any questions concerning these comments, contact me at (972) 304-7019. Sincerely, Kent M. Collins, E.I.T. Graduate Engineer