Loading...
Gulf Bearing-LR 950721 (3)TECHNOLOGIES INC Maxim Tech. · Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 CUENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 CLIENT NO.: 3200037 REPORT NO.: 27367 Gulf Bearing DATE OF SERVICE: 7/12/95 Coppell, Texas AUTHORIZATION: Joe REPORT DATE: 7/21/95 Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" Max. AlE: N/A METHOD OF TEST: ASTM C-39 ASTM C- 143 PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENT: 7/12/95 TIME SAMPLED: 04: 36AM BY: Larry Bracken TEMPERATURE ('F) - AIR: 78 CONCRETE: 89 TRUCK NO: 392 TICKET NO: N/A AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Slab-on-grade @ Grid E.21/1.8 CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 1 1 7.50 7/19/95 7 1 2 8/09/95 28 1 3 8/09/95 28 1 4 HOLD HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DIAMETER AREA LOAD STRENGTH (in.) (sq.in,) (lbs. force) (psi) 6.00 28.27 80980 2860 REMARKS ADDITIONAL COMMENTS: Contractor added 35 gallons water prior to test sample. Test sample taken at truck discharge. Batch time: 3:38am Sample time: 4:36am Technician: Larry Bracken Started: 03:30AM Stopped: ll:OOAM Report Of Tests Continued On Page 2 1001 LW Our etters and reports are for the exclusive use of the cent to whom they are addressed and shall not be reproduced except in full without the approval of tl~e testing laboratory, The use of ourname must receve our written approval. Our letters and reports apply only to the sample tested and/or inspectei:l, and are not indicative of the quantities of apparently identical or similar pro~lucts. Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SER~CE: 7/12/95 REPORT NO. PAGE 2 SET NO. 2 27367 CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" Max. AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C-143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CLASS OF CONCRETE: M:[x Number 16 DATE OF PLACEMENT: 7/12/95 TIME SAMPLED: 06: 15AM BY: Larry Bracken TEMPERATURE ('F) - AIR: 79 CONCRETE: 89 TRUCK NO: 6,54 TICKET NO: N/A AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Slab-on-grade @ grid E.6/4.1 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in.) (sq.in.) (lbs. force) 2 1 7.00 7/19/95 7 2 2 8/09/95 28 2 3 8/09/95 28 2 4 HOLD HOLD COMPRESSIVE STRENGTH ~osi) 6.00 28.27 82300 2910 REMARKS ADDITIONAL COMMENTS: Contractor added 20 gallons water prior to test sample. Test sample taken at truck discharge. Batch time: 4:41am Sample time: 6:15am Technician: Larry Bracken Started: 03:30AM Stopped: ll:00AM Report Of Tests Continued On Page 3 1001 LW Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in fu without the approval of the testing laboratory.. The use of~ ,ou~r, na.m,.e ml~s.[_re_c.e.i_v_e.~,o_u_r _wr. ~_e_n_.a~.~p,r..o~v~l.~.O~r I..e. tt~e~r~ a~.nd...r~eap,O,c~ apply only to the sample tested and/or nspectea, aha are not inalcaitve olu]e q~.l~rl[i[l~=* u. el~l.~,~Hu). ~u~H~l~a~ v. a,,,,,,~. F.v..~ · Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 7/12/95 REPORT NO. PAGE 3 SET NO. 3 27367 CONTRACTOR: Rogers O'Brien CCNCRETE SUPPLIER: Latttmore PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" Max. AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENT: 7/12/95 3~ME SAMPLED: 08: 15AM BY: Larry Bracken TEMPERATURE ('F~-AIR: 85 CONCRETE: 86 TRUCK NO: 460 TICKET NO: 7011815 AIR CONTENT(%): N/A LOGA~]ON OF PLACEMENT: Slab-on-grade @ Grid D4/6.1 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in.) (sq.in,) (lbs. force) 3 1 8.75 7/19/95 7 3 2 8/09/95 28 3 3 8/09/95 28 3 4 HOLD HOLD COMPRESSIVE STRENGTH (psq 6.00 28.27 76750 2710 REMARKS ADDmONAL COMMENTS: Contractor added 10 gallons water prior to test sample. Test sample taken at truck discharge. Batch time: 7:25am Sample time: 8:lSam Technician: Larry Bracken Started: 0:330M Stopped: ll:00AM Report Of Tests Continued On Page 4 1001 LW Our letters and reports are for the exclusive use of_the client.to whom they .are addressed a,n~cl__s_ha_ll__n_9~_,be~r.e..~r,o_d.u_c..ed._e.XCre~s fu I without the approval of the test ng laboratory ~ ne use OT ou.r. na.m. e m.us..[ rece,v~...our wt. ~e. ap_pZuyg,..k~_! '=~?,~.=.,~/u _~ ~ apply only to the sample tested and/or nspecteU, and are not ina calve or [ne quan~mes o* apparen[ly oenucal or s~mha pruuu~.~s. Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 7/12/95 REPORT NO. PAGE 4 SET NO. 4 27367 CONTRACTOR: Rogers O' Brien CONCRETE SUPPLIER: Lat:timore PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" [flax. AIR: METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENT: 7/12/95 TIME SAMPLED: 10: 14AM BY: Larry Bracken TEMPERATURE ('F) - AIR: 91 CONCRETE: 85 TRUCK NO: 310 TICKET NO: 7011835 AIR CONTENT(%): N/A LOCAqqON OF PLACEMENT: Slab-on-grade @ Grid E.8/7.5 CYLINDER MARKED SET NO, 4 1 4 2 4 3 4 4 MEASURED SLUMP (inches) 9.25 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DATE AGE DIAMETER AREA LOAD STRENGTH TESTED (days) (in,) (sq.in.) (lbs. force) (Dsi~ 7/19/95 7 6.00 28.27 75500 2670 8/09/95 28 8/09/95 28 HOLD HOLD REMARKS ADDITIONAL COMMENTS: Test sample taken at truck discharge. Sample time: 10:14am Batch time: 9:06am Technician: Larry Bracken Started: 03:30AM Stopped: ll:00AM Report Distribution: MAXIM TECH.,SOUTH N LABS (1) Gutf Bearing, Inc. (1) Gromatzky, Dupree & Associates (1) Brockette, Davis, Drake (2) Rogers O'Brien F. King Cook, P.E. (1) City of CoppeL[ o LwC ty of Our letters and reports are for the exclusive use of the client.to whom they .are a.d, dressed.._a..n_d__sh_a_lL.n_o..t_,be~r.e..or,o_d.u_c..ed__e~c~p~. ful without the approval of the test ng laboratory. I ne use o! .ou[na.m, e m.us.,[ rece~vq..,our wj~[te, ap_pj.u¥9,. apply only to the sample tested and/or nspecte~, and are not indlca~ve o~ ~ne quant~les o[ apperermy