Loading...
Gulf Bearing-LR 950719TECHNOLOGIES INC Maxim Tech., Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 CLIENT NO.: 3200037 REPORT NO.: 26526 Gulf Bearing DATE OF SERVICE: 6/21/95 Coppell, Texas AUTHORIZATION: Joe REPORT DATE: 7/19/95 Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 4- 6" AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C- 143 PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENI: 6/21/95 TIME SAMPLED: 07: 30AM BY: Dwayne Palmer TEMPERATURE ('F) - AIR: 78 CONCRETE: 75 TRUCK NO: 569 TICKET NO: 3013668 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building Pad - C.3- 3.4. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5 . 00 6/28/95 7 102800 3640 1 2 5.00 7/19/95 28 133260 4710 1 3 5.00 7/19/95 28 132840 4700 1 4 HOLD HOLD REMARKS Technician: Dwayne Palmer Started: 05:30AM Stopped: 04:00PM CME Technician Report Of Tests Continued On Page 2 1001 LW Our tetters and reports are for the exclusive use of the client to whom they are aa0resseO and shall not be reprociucecl except in full without the approval of the testing aboratory. The use of ourname must receve our wrtten approval. Our letters anti reports apply only to the sample tested and/or inspectebl, and are not ndicative of the Quantities of apparently identica or sim lar products. Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 6/21/95 REPORT NO, PAGE 2 SET NO, 2 26526 CONTRACTOR: Rogers O' Brien CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 4 - 6" AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i hued) PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENT: 6/21/95 TIME SAMPLED: 09: OOAM BY: Dwayne Palmer TEMPERATURE ('F) - AIR: 81 CONCRETE: 78 TRUCK NO: 573 TICKET NO: 7011055 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building pad: A,8-6,8. CYLINDER MARKED SET NO. MEASURED SLUMP (inches) REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIM UM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 2 1 5.50 6/28/95 7 84630 2990 2 2 5.50 7/19/95 28 115720 4090 2 3 5.50 7/19/95 28 116970 4140 2 4 HOLD HOLD REMARKS Technician: Dwayne Palmer Started' 05:30AM Stopped: 04:00PM~ CME Technician Report Of Tests Continued On Page 3 1001 LW Our letters ancl reports are for the exc us ve use of the cent to whom they are addressecl and shall not be reproduced except In fu wthout the approva of the testng aboratory The use of ourname must receive our written approval. Our letters and reports apply only to the samDle tested and/or inspecte;:f, and are not ndicative of the cluant t es of al3parently identical or similar products. Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 6/21/95 REPORT NO. PAGE 3 SET NO. 3 26526 CONTRACTOR: Ro§ers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 4- 6" AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i hued) PROJECT DATA CLASS OF CONCRETE: Mi× Number 16 DATE OF PLACEMENT: 6/21/95 TIME SAMPLED: 09: 55AM BY: Dwayne Palmer TEMPERATURE ('F)-AIR: 84 CONCRETE: 82 TRUCK NO: 456 TICKET NO: 7011072 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building Pad: C-8.6 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (ibs. force) (psi) 3 1 6.00 6/28/95 7 80720 2850 3 2 6.00 7/19/95 28 114720 4060 3 3 6.00 7/19/95 28 113250 4000 3 4 HOLD HOLD REMARKS Technician: Dwayne Palmer Started: 05:30AM Stopped: 04:00PM CME Technician Report Of Tests Continued On Page 4 7001 LW Our letter5 aha reports are for the exc u5 ve use of the cent to whom they are addressed and shall not be reproduced except in tul without the approva of the test 3g at3oratory The use of ourname must receive our written approval. Our letters and reports apply only to the sample tested and/or inspecte;:l, and are not ind cat ye of the quantities of apparently identical or similar products. Gulf Bearing, Inc. CLIENT NO, 3200037 DATE OF SERVICE: 6/21/95 REPORT NO. PAGE 4 SET NO. 4 26526 CONTRACTOR: Rogers' O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 4- 6" AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont inu~) PROJECT DATA CLASS OF CONCRETE: .Iv[ix Number 16 DATE OF PLACEMENT: 6/21/95 TIME SAMPLED: 12:40PM BY: Dwayne Palmer TEMPERATURE ('F) - AIR: 86 CONCRETE: 84 TRUCK NO: 390 TICKET NO: 7011098 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building Pad: C,1-9,8, CYLINDER MARKED SET NO. MEASURED SLUMP (inches) REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 4 1 6.00 6/28/95 7 86610 3060 4 2 6.00 7/19/95 28 117570 4160 4 3 6.00 7/19/95 28 115990 4100 4 4 HOLD HOLD REMARKS Technician: Dwayne Palmer Started: 05.:30AM Stopped: 04:00PM CME Technician Report Of Tests Continued On Page 5 1001 LW Our etters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in fu wthout the approva of the testng aboratory The use of ourname must receive our written approval. Our letters and reports apply only to the sample tested and/or inspecteU, and are not indicative of the quantit es of a[~oarently dent cai or s m lar products. Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 6/21/95 REPORT NO. PAGE 5 SET NO. 5 26526 CONTRACTOR: Rogers O' Brien CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 4-6" AIR: N/A METHOO OF TEST: ASTM C-39 ASTM C- 143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i hued) PROJECT DATA CLASS OF CONCRETE: Mix Number 16 DATE OF PLACEMENT: 6/21/95 TIME SAMPLED: 02:45PM BY: Dwayne Palmer TEMPERATURE ('F) - AIR: 89 CONCRETE: 85 TRUCK NO: 282 TICKET NO: 701114 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building pad: C.5-9.8 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 5 1 6.00 6/28/95 7 84820 3000 5 2 6,00 7/19/95 28 119050 4210 5 3 6.00 7/19/95 28 116120 4110 5 4 HOLD HOLD REMARKS Technician: Dwayne Palmer Started: 05:30AM Stopped: 04:00PM CME-Technician Report Distribution: MAXIM TECH..SOUTHWES,T, ERN LABS (1) Gulf Bearing, Inc. (1) Gromatzky, Dupree & Associates (1) Brockette0 Davis, Drake (2) Rogers O'BrJen F King Cook, P E. (1) city of Coppe[[ ' ' 10~)L.wCity of Coppe[t Our letter5 and report5 are for the exclusive use of the client to whom they are adclressecl anti shall not be reproduced except in full without the approval of the testing laboratory. The use of ourname must receive our written approval. Our letters and reports al~ply only to the sample tested and/or insbected, and are not indicative of the quantities of apparently identical or similar products.