Lakes of C 1stP-LR 910807 I reed engineering
Rv_' 'l:nninnnHn.
GEOTECHNICAL CONSULTANTS
August 7, 1991
Project No. 756.1
Report No. 4
Don A. Tipton, Inc.
6330 Beltline Road, Suite C
Garland, Texas 75043
ATTN: Mr. Pat Atkins, P.E.
Re: Construction Materials Testing
Phase IV, Lakes of Coppell
Cheshire Drive
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses activities for the period of July 12 through 18, 1991.
During the period of July 12 through 18, 1991, a total of 18 field
density tests were taken on the subgrade and natural fill. Test
results are shown on Plate 1. Materials were found to be in
compliance with project specifications.
Additional reports will be submitted as the work progresses.
If any questions arise, do not hesitate to call.
Very truly yours,
THE REED ENGINEERING GROUP
Ronald F. Reed, P.E~
RFR/aap
copies submitted: (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E.
(3) Grand Homes/Mr. Ed Toole
(1) city of Coppell/Engineering Department/
Mr. Larry Davis
2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019