Loading...
Lakes of C 1stP-LR 910807 I reed engineering Rv_' 'l:nninnnHn. GEOTECHNICAL CONSULTANTS August 7, 1991 Project No. 756.1 Report No. 4 Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: Construction Materials Testing Phase IV, Lakes of Coppell Cheshire Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses activities for the period of July 12 through 18, 1991. During the period of July 12 through 18, 1991, a total of 18 field density tests were taken on the subgrade and natural fill. Test results are shown on Plate 1. Materials were found to be in compliance with project specifications. Additional reports will be submitted as the work progresses. If any questions arise, do not hesitate to call. Very truly yours, THE REED ENGINEERING GROUP Ronald F. Reed, P.E~ RFR/aap copies submitted: (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand Homes/Mr. Ed Toole (1) city of Coppell/Engineering Department/ Mr. Larry Davis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019