Loading...
ST9901-CS 990820August 20, 1999 Scott C. Booker, P.E. Railroad Controls Limited 500 South Freeway Fort Worth, Texas 76104-3504 RE: Railroad Crossing signal ization at Belt Line Road and Thompson/Lattimore Project # ST99-01 Dear Mr. Booker: At the August 10, 1999 City Council meeting, the referenced project was awarded to your firm. Enclosed with this letter is your copy of the contract signed by the Mayor. The construction inspector on this project will be Garreth Campbell. He can be reached at 972/304-3679 to arrange a preconstruction meeting. Enclosed for your submittal is a Contractor' s Right of Entry Agreement for you to complete and submit to DART before construction can begin. If you should have any questions concerning this project please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering and Public Works cc: Garreth Campbell, Construction Inspector