Loading...
Lakes of C 1stP-LR 910807 (2) eed engineering GEOTECHNICAL CONSULTANTS August 7, 1991 Project No. 756.2 Report No. 2 Murray Construction Company 515 N. Kealy Lewisville, Texas 75067 ATTN: Mr. Bub Murray Re: Construction Materials Testing Phase IV, Lakes of Coppell Cheshire Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses activities on the date of July 10, 1991. On July 10, 1991, a total of three field density tests were taken on the imported fill material. Test results are shown on Plate 1. Materials were found to be in compliance with project specifications. If any questions arise, do not hesitate to call. Very truly yours, THE REED ENGINEERING GROUP Ronald F. Reed, P.E. ... RFR/aap copies submitted: (1) Murray Construction Company/Mr. Bub Murray (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand Homes/Mr. Ed Toole (3) City of Coppell/Engineering Department/ Mr. Larry Davis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 engineering PHASE IV, LAKES OF COPPELL CHESHIRE DRIVE COPPELL, TEX~S REPORT NO. 2 Field Density Tests Depth Com- Below Unit pac- Final Dry Moisture tion- Test Line No./ S.G. Weight Content Curve Level Date No. Station (feet) {DCf) (%) No. [%) 07-10-91 17 Allen Street 10" Water Line/5+00 0.0 113.1 15.3 5 95.0 18 Allen Street 10" Water Line/3+00 0.0 115.0 15.3 5 96.6 19 Allen Street 8" Water Line/0+50 0.8 116.6 13.0 5 98.0 GEOTECHNICAL CONSULTANTS P] ate 1