Re: Construction Materials Testing
Phase IV, Lakes of Coppell
Cheshire Drive
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses activities on the date of July 10, 1991.
On July 10, 1991, a total of three field density tests were taken
on the imported fill material. Test results are shown on Plate 1.
Materials were found to be in compliance with project
specifications.
If any questions arise, do not hesitate to call.
Very truly yours,
THE REED ENGINEERING GROUP
Ronald F. Reed, P.E. ...
RFR/aap
copies submitted: (1) Murray Construction Company/Mr. Bub Murray
(1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E.
(3) Grand Homes/Mr. Ed Toole
(3) City of Coppell/Engineering Department/
Mr. Larry Davis
2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019
engineering
PHASE IV, LAKES OF COPPELL
CHESHIRE DRIVE
COPPELL, TEX~S
REPORT NO. 2
Field Density Tests
Depth Com-
Below Unit pac-
Final Dry Moisture tion-
Test Line No./ S.G. Weight Content Curve Level
Date No. Station (feet) {DCf) (%) No. [%)
07-10-91 17 Allen Street
10" Water
Line/5+00 0.0 113.1 15.3 5 95.0
18 Allen Street
10" Water
Line/3+00 0.0 115.0 15.3 5 96.6
19 Allen Street
8" Water
Line/0+50 0.8 116.6 13.0 5 98.0