Lakes of C 1stP-CS 851009 CONSULTING ENGINEERS. INC. October 9, 1985 NDM: 84-3-O03.P Lakes of Coppell Mr. Tom Henkel Jensen Construction Company 4949 Westgrove, Suite 130 Dallas, Texas 75248 Dear Tom: On this date, Mr. Tom Dixon and I conducted a complete inspection of all roadways under Part A of your contract regarding the above referenced project. The items listed below are the findings of our inspection. These items must be satisfactorily completed prior to Nathan D. Maier Cunsulting Engineers, Inc., as engineer of record, requesting a final inspection and acceptance from the City of Coppell. MACARTHUR BOULEVARD - NORTHBOUND LANES 1. Complete general clean-up from Sandy Lake Road north to Village Parkway South. 2. Install barrier free ramps with brick pavers at all required locations (although barrier-free ramps have been made a part of Part B of the Contract for payment purposes, as you know, Mr. Randy Fleming of Ginn, Inc. has stated as late as this week that said ramps with brick pavers must be completed before the City of Coppell will accept the roadways under Part A of the contract). 3. Complete repair and reinstallation of the fire hydrant opposite the Parkway Boulevard intersection. 4. General clean-up around barrier-free ramps. 5. Sweep off all pavement. MACARTHUR BOULEVARD - SOUTHBOUND LANES 1. General clean-up at DeForest Road intersection, including backfill behind curb. 2. 'General backfill behind all curbs. 3. Remove earthen berm near tree line at Samuel Boulevard intersection. Three NorthPark/8800 N. Centr&l Expwy./Suite 300/D&llas, Texao 75231/(214) 739-4741 Mr. Tom Henkel October 9, 1985 84-3-003.P Page 2 of 3 4. Install barrier-free ramps with brick pavers at all required locations. 5. Complete rip-rap at Sapdy Lake Road. 6. Sweep off all pavement. PARKWAY BOULEVARD 1. General backfill behind all curbs. 2. Install barrier-free ramps with brick pavers at all required locations. 3. Remove metal guard rail frown site. WARREN DRIVE 1. General backfill behind all curbs and inlets. 2. Sweep off all pavement. VILLAGE PARKWAY 1. General backfill behind all curbs. 2. Install barrier-free ramps with brick pavers at all required locations. 3. Sweep off all pavement. SAMUEL BOULEVARD 1. Sweep off all pavement. Mr. Tom Henkel October 9, 1985 84-3-003.P Page 3 of 3 SANITARY SEWER 1. Clean out dirt or other debris from all manholes and all lines by whatever means necessary to secure timely acceptance of said lines and manholes by the .City of Coppell. As you know, you assured me in your office last Thursday, October 2, 1985, that if I issued a Notice to Proceed for Part B of the Contract dated October 7, 1985, you would do whatever was necessary to satisfactorily clean all sanitary sewer mains and manholes, even if it meant bringing in a jet cleaning vehicle. According to representatives of the City of Coppell, final acceptance of the utility contract (Mario Sinacola and Sons, Inc.) cannot occur until final acceptance of the roadways under Part A of you contract has occurred. Time is and has been a critical issue to the Owner, as your are aware, since the inception of your contract. Therefore, I must inform you that if all items listed above are not completed by close of business on Monday, October 14, 1985, or if a concentrated effort, in our opinion, on the part of Jensen Construction Company to complete these items in the most expedicious manner possible is not made, all work under Part B of your contract will be suspended in accordance with Item 1.44 of the Standard Specifications For Public Works Construction as published by the North Central Texas Council of Governments. No time extension for Part B will be granted should work on Part B be suspended and liquidated damages in the amount of $750.00 will be assessed by the Owner for each day of delay beyond November 20, 1985 that all items contracted for are not completed. Should you have any questions, please call. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. Clifton N. Taylor Vice President ~ ~ CNT cc: Doug Spiker Gary Burcham .~dy Fleming