Loading...
Lakes of C 1stP-CS 850806 CONSULTING ENGINEERS. INC. August 6, 1985 NDM: 85-01-013.R Mr. Wayne Ginn, P.E. Ginn Incorporated 16135 Preston Road Suite 112 Dallas, Texas 75248 Dear Mr. Ginn: We are submitting on behalf of our client, Veenker Investments Inc., three (3) copies of a Floodplain Reclamation report for the Lakes of Coppell development in Coppell, Texas. This report presents the results of a detailed hydraulic a~alysis .~t~exformed to*~_t~rmim~ the~mmoun~ of land that can b~ reclaimed from the floodplain at this site..The report includes plotted water surface profiles for the 10, 50, 100 and 500-year flood discharges and a map delineating the flood insurance study floodplain and floodway as well as the proposed floodway. The proposed floodway as shown on the enclosed map will not have a negative impact on the lO0-year flood elevations in this reach of Denton Creek and the Elm Fork of the Trinity River. Please review this report and provide to us your comments. We respectfully request that the City of Coppell file a Letter of -Map Amendment (LOP~) with the Federal Emergency Management Agency (FEMA) for the revisions documented in the enclosed report. We will be pleased to furnish additional copies of this report and other information that might be required by FEMA in processing this report. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. Dennis L. Johnson, P.E. DLJ/jp cc: Caroline Morris Planning Coordinator City of Coppell Dale Veenker Veekner Investments, Inc. Three NorthPark/8800 N. Central Expwy./Sulte 300/Dallas, Texas 75231/(214) 739-4741