Loading...
WA9302-CS 960510SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. C. L. SHIMEK, P.E. 1. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. May 10, 1996 Natgun Corporation 01880 05-13-96P03:24 RCVD Re: City of Coppell Village Parkway Ground Storage Tank No. 2 Gentlemen: We have reviewed your request dated April 24, 1996, for a change order to cover the expense of furnishing and installing three-36" flanges adaptors on the inlet and outlet pipes for the Village Parkway Ground Storage Tank project. The construction plans and specifications indicate that the contractor is responsible for verifying the connections to the existing pipes. It is our opinion that with proper advance verification by either you or your subcontractor, the correct fittings and or valves could have been provided prior to actual construction and thus avoiding the need for furnishing and field welding the 36" flange adapters. At the direction of the City of Coppell, your request for the $8,041.00 change order is hereby rejected, If you have any questions or need additional information concerning this determination, please do not hesitate to contact this office. C.' Mr. Ken Griffin, P.E. Mr. Larry Davis Gary C. Hendricks, P.E. April24,1996 PRECAST PRESTRESSED PREFERRED' Natgun Corporation Precast Concrete Tanks Eleven Teal Road Wakefield, MA 01880-1223 Telephone 617-246-1133 Fax 617-245-3279 Mr. Gary Hendricks, P.E. Shimek, Jacobs & Finklea 8333 Douglas Avenue, #820 Dallas, TX 75225 Reference: 6.0 MG Ground Water Storage Tank Coppell, TX (95C11) Proposed Change Order No. 1 (PCO No. 1) Revised 36" Pipe Connections Dear Gary: Please find below our revised cost estimate to perform the following extra work: Furnish and install three(3) ~anged 36-inch diameter pipe connections in lieu of plain end pipe connections. Subcontractor Cost (Re: Barson Utilities, Inc.'s attached breakdown dated April 22, 1996) General Contractor Allowance (10%) $7,309.65 $ 730.97 Total Cost of PCO No. 1 .........$8,041.00 Should you have any questions, kindly call. Very truly yours, Robert V. Barbarisi, Jr. C Project Manager RVB:kld Sour~wEs,r OFnct: Suite 811, 8111 Preston Road, Dallas, TX 75225-6316, Telephone 214-368-3306 MmwEsr OFFXCE: Suite 21 I, 2610 Sheridan Road, Zion, IL 6009%2615, Telephone 708-872-8806 Mm-A'rLAN'nc OFnc~: Suite 100, 3650 Winding Way, Newtown Square, PA 19073, Telephone 610-353-8315 0,4/23/9~6 TUE 14:53 FAX 6172245153 12:16 B-~ BARSON N..XTGUN UTILITIES CO 2177 ~002 P-~2 BARSON UTILITIES, INC. 2018 ~K KIFIT HAWK DR. AI, I, EN, TX 75002 214-390-2177 April 22. 1996 To: Bob Barbarisi From: Ron Barson .Re: Coppell Job - ~llage Parkway Pump 3tation Dear Bob, In reference to the 36" piping on this project, in all three locations. it showed to be a bell with a push in plug. We excavated and verified these fittings. The existingtim'rigs were flange with a flange cap. G{ty'ord Hill Pipe Co. charged us extra on the manufa- cturing of these three piece, the prices are as follows: $2,210. O0 each on all 3 pieces which i3 a total of $6,630.00. The bolts az~ gasketswere S226.55 each on all 3 ,vets for a total of $679.65 This vaas not how I quoted this project and feel that I 'm do ootid~n~ult~n on the cost of these items. There is extra labor in the removal and installation in these flange ~tt- ings. this I 'm writing to absorb. Thartk you for you're concern in this matter. E~do~ed: $ee attached Sincerely, Ron Barson President