Loading...
Forest Cove 1-CS 980701The City W~ ^ Beautiftd Fut.. 255 PARKWAY BLVD. COPPELL, TX 75019 FAX NO. (972) 304-3570 ENGINEERING DEPARTMENT FAX COVER SHEET NUMBER OF PAGES (INCLUDING COVERSHEET): ~-~ IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304-3679. Engineering- Excellence By Design err W. Pope To: Larry Oa~s Da{e: 71~/Oe Time: 'I&25:02 AM_ Page 2 of 2 ROBERT W. POPE & ASSOCIATES 4011 '~'. PLANO PARK~'AY SLTTE 104 PLANO, TEXAS 7S093 (972)964-$80t - FAX (972)$96-6S47 VIA FACSIMILE July 1, 1998 Mr. Kenneth M. Griffin, P.E. City Engineer City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Forest Cove Estates, Phase I Dear Mr. G-d~m: / We have been attempting for several weeks to complete the subject project in order to allow TU Electric. Lone Star Gas to begin their installations, install our construction traile_~r and begin model ~ It seems that we have finally satisfied all of the requirements on-site; however, we were informed yesterday that Site Concrete had not resolved the issue of silt in the Coppell Road ditch and in the City owned lake west of Coppell Road. We have told Site on several occasions that they must resolve the lake issue with you. We are currontly holding approximately $56,000 in retainage from Site for this project. We propose to contine to hold those funds until Site has satisfied your requiremems for the silt removal or otherwise resolved the issue with you. These funds are well in excess of the cost to complcte the work should Site fail to do so. In returm we ask that you release the project so the franchise utilities can begin their work and New, hark Homes can begin construction in the subdivision. Nex~xnark has contracted for several homes in the project and must begin work imrnedaitely in order to meet their contractural obligations. We, therefore, request Sincerely, Terry Nfitehell, P.E., Carter & Burgess Nlike Boney, Site Concrete, Inc.