Loading...
Forest Cove 1-CS 980625 , Coppell. Texas 75019 //'~/~ The City With A Beautiful Future 972-462-0022 k...~J/ //_~.~ PO BOX 478 ~7~~ COPPELL, TEXAS 75019 June 25, 1998 Terry Mitchell Carter and Burgress 7950 Elmbrook Suite 250 Dallas, TX 752474951 RE: Forest Cove, Phase I Final Acceptance Dear Mr. Mitchell: A final inspection of paving and utilities for the referenced project has been conQn:~ed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the ErosioR Control Bond will also be two years from the date of this letter. Sincerely, La~ Davis Construction Inspector cc: Mike Martin, Assistant City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Robert Pope, Robert Pope and Assoc., FAX: 972/596-6547 Mike Boney, Site Concrete, FAX:972/513-0825