Forest Cove 1-CS 980625 , Coppell. Texas 75019
//'~/~ The City With A Beautiful Future 972-462-0022
k...~J/ //_~.~ PO BOX 478
~7~~ COPPELL, TEXAS 75019
June 25, 1998
Terry Mitchell
Carter and Burgress
7950 Elmbrook
Suite 250
Dallas, TX 752474951
RE: Forest Cove, Phase I
Final Acceptance
Dear Mr. Mitchell:
A final inspection of paving and utilities for the referenced project has been conQn:~ed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the ErosioR
Control Bond will also be two years from the date of this letter.
Sincerely,
La~ Davis
Construction Inspector
cc: Mike Martin, Assistant City Engineer
Doug Stevens, Engineering Technician
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Robert Pope, Robert Pope and Assoc., FAX: 972/596-6547
Mike Boney, Site Concrete, FAX:972/513-0825