Forest Cove 1-CS 980625 (2) Coppell. Texas 75019
t.__// //__~/ P.o. Box 478
(////~ COPPELL. TEXAS 75019
June 25, 1998
Mr. Robert Pope
Robert W. Pope and Associate
4011 W. Piano Parkway, Suite 104
Piano, TX 75093
RE: Street Sign Fee Assessment / Forest Cove Phase I
Dear Mr. Pope:
Enclosed with this letter you will find the street sign assessment for Forest Cove, Phase I. ~or
the final acceptance of this project, a check in the amount of $1221.67 should be made payable to the
City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a copy of
attached street sign fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be able to veri~ payme~.t 3~
the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your convenience.
Sincerely
Director of Engineering and Public Works
cc: Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Glenn Hollowell, Asst. Dh' of Public Works
TO: Doug Stevens, Engineering Technician
FRC~: Per Birdsall , Sign/Signal Technician
RE: Street Division Sign Fee For ~d~=~U-~~ ~a~ i
The following fee should be assessed and collected on the above
referenced project. 100% due prior to final acceptance of project.
Street Signs Fee
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY E~'~'~a~ PRICE
No Parking $54.12
- I 3 'K 7_-la.,
Street Names $71.88
Yield w/names $90.41
· :
w/names $I 00.14 ~ ~ 0 ~ '~
Warning Sign $64.68 ~ ' . (~q, b~
Keep Right (median) $58.77
Object Markers (L&R) $34.57
* cost breakdowns may be obtained by written request
signfee Revised 4/10/9~