Loading...
Forest Cove 1-CS 980223 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Greg Jones, Chief Building Official From: Ken Griffin, P.E., Dir. of Engineering and Public Works RE: Forest Cove Date: February 23, 1998 The City of Coppell Engineering Department is currently finalizing construction plans on a 24" transmission water line along Sandy Lake Road from Denton Tap westward to the new proposed elevated storage tank. Part of the 24" water line will be constructed in an easement dedicated on the Forest Cove Plat 5 feet away from the proposed screening wall. The City is trying to expedite the bidding of the project, but it is anticipated that the earliest construction could begin on the 24" water line is in the May/June time frame. I am unsure when Forest Cove will be requesting approvals to construct their screening wall. Therefore, I would request that the Engineering Department be notified prior to the issuance of a permit for the screening wall on Forest Cove. That notification will be an opportunity for us to meet with the developer to see if other options are available to the City to have the water line installed prior to the construction of the wall. It would not be in the best interest of the City to attempt to construct a 24" water line at the depths proposed adjacent to the screening wall afler it has been constructed. If you should have any questions please feel free to contact me at your convenience.