Loading...
Forest Cove 1-CS 970925 (2) DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Forest Cove. Phase 1. ~ Plat. to allow the development of 44 residential lots on a 13.435 acre fmc2 of land located along the south side of ~mdy Lalce Road, approximate~ 2000 feet west of Denton Tap Road, at the request of Carter and Burgess, Inc. DRC DATE: September 25, 1997 and October 2, 1997 CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679) ~'PRELIMINAR Y RE VISED AFTER P&Z Final Plat Comments: 1. Provide a utility easement for a future 24" water line across the north side of the development adjacent to Sandy Lake Road. 2. Provide the City of Coppell floodplain signature block. 3. A variance must be requested for deletion of alley behind Lots 16 & 17, Block D. 4. Show the easement locations in details A, B, C, & D Landscaping Plans Comments: 5. The wrong lot numbers are shown on the plans. 6. No trees or major landscaping will be allowed on top of proposed 24" water line adjacent to Sandy Lake Road. 7. A 5' sidewalk is required along Sandy Lake Road. 8. Show correct visibility easement.