Loading...
WA9302-CS 960604SHIMEK, JACOb3 FINKLEA CONSTRUCTION REPORT Prepared By: Matt Hickey Project No. 94155 Date: 6/04/96 Is This A Working Day? [] Yes [] No Owner: City of Coppell Contractor: NATGUN Superintendent: Brian Phelp Weather Conditions: Clear and Hot Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Time Allotted: 300 Used: 321 Number Men Working: 1 Hours: 9:30am to 10:00am Site Conditions: The site was well maintained. WORK DESCRIPTION 1. Brian Phelps indicated that new paint samples were being delivered to the site. He said that he would paint a test panel and place it near the existing ground storage tank. 2. The City directed Brian to take samples of the water inside to the tank to check the chlorine residuals. 3. Work had began to remove the Natgun's storage trailer from the jobsite. cc: Mr. Bob Barbarisi, Jr.