ST8601-CS 890502 Coppell, Texas 7.5019 May Z, 1989 Mr. William Anderson Roberts & Dowdey Engineers 16200 Dallas Parkway Suite $200 Dallas, TX 75248 RE: MACARTHUR BOULEVARD PAVING & DRAINAGE IMPROVEMENTS - COPPELL, TEXAS Dear Mr. Anderson: I am in receipt of your April 4, 1989 request (copy attached~, for geometric con- siderations. You will need to provide more detailed information, and then we will need to meet, together with the design engineer, Phil Deaton, and appropriate members of the City of Coppell Development Rewew Staff to further discuss the compliance with the City Ordinances, codes and requirements, and acceptability of the proposed designs, etc. Please provide me in writing for review prior to the above mentioned meeting, which requests relate to existing access points. Also, on the requests for future access points, provide information such as approved plans and plats, or what your proposal might be. Exhibits can be furnished. If some of these requests relate directly, or indirectly, with the negotiations that are occurring related te this improvement, then we will have to await those decisions before you can get final approval from the City cf Coppell. To avoid a "Catch 2Z" situation, we can pursue this techmcal dialogue in that you can respond to me as I have asked above, then we can have the meeting with the City Development Review Staff, and come to a resolve on your requests from a technical level. Then when the related agreements are concluded, we can issue the approval for these requests to be integrated into the design drawings. To expedite the design of this public improvement we could approve for design those requests that won't be contingent upon approval of other agreements. lVir. William Anderson April 12, 1989 Page 2 Since the review of these drawings were put on hold, pending the final outcome of the related agreements, we can conduct these technical considerations of your requests in the meantime. Please let me know if you have any questions. We appreciate the opportunity to work with you on this improvement, enhancing the potential for development in this part of the City of Coppello Thank you. Sinc ere ly.;~-': ~/City Engineer / R RD/sp xc: Glen Hinckley, Univest Phil Deaton, P.E., Dannenbaum Engineers Tom Tanner, Lomas & Nettleton Kevin Peiffer, P.E., Ginn, Inc. Steve Goram, Director of Public Works Frank Trando, Deputy City Manager/Finance Director ROBERTS a DOWDEY CIVIL 16200 Dallas Parkway, Suite 200 -- Dallas, Texas 75248 -- 1214) 931-0694 Robert E. Acrey P.E. Dan M Dowdey, P.E. David E Pierson, P.E Buddy J. Roberts, P.E. ~ ," ~.. J. G. Threaagillr P.E ~! -, ~ Apr±l 4, 1989 ,..~ City Engineer City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 RE: MacArthur Blvd. Paving & Drainage Improvements Coppell, Texas Dear Russell: As a result of a meeting between Dan Dowdey, P.E. of our firm and Phil Deaton, P.E. of Dannenbaum Engineering Corporation concerning specific geometric considerations between station 208+50± and station 221+00± along the above referenced project, I am submitting various improvements that we would like to have included in the plans. 1. A 28' back-to-back street approach with header at station 209+23.21± (Lt.) (C.L. street approach) 2. A 28' back-to-back street approach with header at station 217+19± (Lt.) (C.L. street approach) 3. A 32.17' face-to-face drive approach with header at station 218+33.50 (Rt.) (C.L. drive approach) 4. Revised median opening, nose station 208+92± for future entrance into street (Item No. 1) 5. A left-turn lane for future entrance into street (Item No. 2). The lane should have a 100 ft. minimum storage capacity. 6. A left-turn lane for future entrance into drive (Item No. 3). The lane should have a 60 ft. minimum storage capacity. I have enclosed four (4) sets of paving and drainage plans for your review and distribution. Also enclosed is a copy of a letter from Phil Deaton, P.E., which briefly explains the purpose for the review. ACRE~', ROBERTS & PIERSON, INC. - THREADGILL-OOWDEY & ASSOCIATES Mr. Russell Doyle, P.E. April 4, 1989 Page 2 If these improvements are acceptable, please send me a letter acknowledging your concurrence so that these modifications can be incorporated into Dannenbaum's plans. Sincerely, William A. Anderson, P.E. WAA/dkb Enclosures cc: Mr. Glen Hinckley Mr. Phil Deaton, P.E. DANNENBAUM ENGINEERING CORPORATION 79,50 ELMBROOK, SUII~ 250 DALLAS, ~ 75247 (214) 638-0145 March 20, 1989 Mr. Dan Dowdey, P.E. ,' Roberts and Dowdey 16200 Dallas Parkway Suite 200 Dallas, Texas 75248 ~' ..................... RE: MacArthur Blvd. Extension City of Coppell Dear Mr. Dowdey: On March 13, 1989 I met with you and Mr. Glen Hinckley to discuss the preliminary construction plans which Dannenbaum Engineering Corporation has prepared for the proposed MacArthur Blvd. extension in northern Coppell. At the meeting we discussed the additional median openings, left turn lanes and street turnouts which you believe are needed to provide access to adjacent properties. You requested that these facilities be included in the current construction plans. We have reviewed your request and believe that certain modifications are needed as shown on the attached drawing. These modifications will not adversely affect the intent of your proposed facilities. If you agree with our modifications we propose to revise the construction plans to include the additional facilities. However, prior to making the revisions, we request that you provide confirmation from the City of Coppell that the additional facilities are acceptable to the City. If we can be of further assistance in this matter, please call. Sincerely, D~~£RING CORPORATION Phil Deaton, P.E. Project Manager PD:ck:O00 2201-01 cc: Mr. Glen Hinckley Mr. Tom Tanner Mr. Jeff Hurt