Loading...
WA9302-CS 960604 (2)SHIMEK, JACOb3 a. rINKLEA CONSTRUCTION REPORT Project No. 94156 Date: 6/04/96 Prepared Is This A By: Matt Hiekey Working Day? [] Yes [] No Owner: City of Coppell Project Name: Contractor: North Texas Municipal Construction Co., Inc Village Parkway Pump Station Addition Construction Time Allotted: 300 Used: 110 Number Superintendent: Bill Bigham. Men Working: 2 Hours: 9:00 am to 9:30 am Weather Conditions: Clear and Hot Site Conditions: The site was reasonably clean and maintained WORK DESCRIPTION 1. Two of the screening wall piers were in place. 2. Nine of the pump station piers were in place 3. The silt fences around the debris piles in the location of the proposed screening walls were not standing. 4. In preparation of painting the north side fence, the steel on the fence extension was being grinded. 5. Larry Davis showed concerns on the conditions of the interior of existing pump station. He indicated that the interior must be cleaned to the conditions it was in before construction began. cc: Noah Texas Municipal Construction Co.