Loading...
Freeport NIP(2.1)-CS 980818 Coppell, Texas 75019 (~//~ ;he City With A Beautiful Futureo. aox 478 972-462-0022 ~~~ COPPELL, TE XAS75019 August 18, 1998 Richard Crow Myers & Crow COmpany Ltd. 3811 Turtle Creek, Suite 730 Dallas, TX 7~219 RE: Freeport North, Lotll (Royal Business Center) Development Fee ~e~nmt Dear Mr. Crow: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations fOr the referenced development. Please make payment to the City of Coppell in the amount of $21,247.17 and .forward to the. Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to' ouroffice so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLr_; Project: Freeport North, Lot 1 (Royal Business Center) Date: 8/18/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic). $192.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,956.65 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100 % due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $9,322.17 $9,322.17 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development ¢ontra~ts TOTAL $27,820.97 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $21,247.17 DI=~/ELOPMENT FEE WORKSHEr--T PROJECT: Freeport North, Lot I (Royal Business Center) DATE: 8/18/98 Water Impact Fee: Domestic Meter(s): I - 2 inch = 8 ESU's Irrigation Meter(s): 1 -2 inch -- 8 ESU's = ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. $8,325.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 ' Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $192.15 $192.15 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: I Irrigation Meter(s) @ $192.15 $192.15 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $2,882.25 $5,764.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 3 D,--¢ELOPMENT FEE WORKSHP'.,.:T Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 ! Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $9,322.17 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 4 ROA.U 6,'AY IMPACT FEE CALCULA'IiONS PROJECT: Freeport North, Lot 1 (Royal Business Center) DATE: 8/18/98 ROADWAY IMPACT FEE: Service Area * 4 Category ** Industrial Land Use ** General Light Industrial Building Size (Sq. Ft.) 117,260 Development Units ** 117.26 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Develbpment Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $37,288.68 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) 75 % Credit as per approval by City Manager $27,966.51