Lake Park-CS 910830 PUNCH LIST - LAKE PARK ADDITION
(Final Walk Thru - August 30, 1991)
1) paver sliver cracked in two
2) sealant is honeycombed - possibly sealant over-heated
3) curb section from approach not draing to inlet
- curb and inlet apron do not match
4) general - sealant appears low - should be 1/8 to 1/4
general - inlets need cleaned of mud and debris
5) throat opening too large
6) clean up excess sealant at expansion joint
7) chip and saw joint - patch and reseal
8) pavers need sand worked in on north edge
9) seal curb at random crack in approach apron
10) surface edges of concrete do not match at clean-out
11) water standing in south inlet - flush
12) water standing at inlet apron - north inlet
13) water standing in inlets - clean to flow
14) live tree formed into concrete on howl apron
15) expansion joint sealant not adhering - reseal
16) loose concrete chips in curb saw (3) north side - remove and reseal
17) curb holding water - northwest corner beyond radius
18) inlet holding water - clean to drain
19) same as 16
20) same as 16
21) same as 6
28) mud ball hole
23) same as 13
24) same as 13
25) loose concrete chips in saw joint - remove seal
26) corner of panel chip at exp. joint
27) alley section holding water - 1ST past approach
GENERAL - streets & alleys need cleaning
GENERAL - remove all nails, lX2's, etc. from exp. joints and reseal
COPPE?.?. PUBLIC WORKS
~ATE= August 30, 1991
TO= Larry Davis, Construction Inspector~
I ~1~
FROM= Rey Gonzales, Streets Superintenden~/
RE= Walk-Thru/Lake Park
Attached is a copy of the punch list for Lake Park Addition. It is
Public Works opinion that all sealer should be removed and
replaced. It appears that the sealer was burned and is
ineffective.
RG/mp
LKPARK. RG
By: Engineering