Lake Park-CS 910312 Federal Emergency Management
Case ~o.: 91-06-36R
Mr. William A. Anderson, P.E. Commun£ty: C£ty of Cop~ell,
Dan M. Dowdey & Associates Dallas County, Texas
16250 Dallas Parkway, Suite 100 Community No.: 480170
Dallas, Texas 75248
Dear Mr. Anderson:
This is in response to the request for a conditional Letter of Map Revision
(LOMR) for the Lake Park Addition in the City of Coppell, Texas, dated
February 8, 1991.
We have completed an inventory of the items you submitted to support this
request. The results of our inventory are summarized on the enclosed "Data
Request Checklist": all the £tems indicated by an "X" in Column 1 are needed
before we will begin our review; items indicated in Column 2 have already been
received. If only items in Column 2 are noted, no additional items are
required at this time; therefore, we will begin our review. However, addi-
tional items may be requested at a later date.
The Federal Emergency Management Agency (FEMA) has implemented a reimbursement
procedure to recover costs associated with reviewing proposed projects, thus
reducing the expense to taxpayers. The initial fee, if indicated on the
checklist, is the minimum charge associated with our reviewing a project of
this type. However, additional Comtes could be required after review and
before issuing a conditional LOMR depending on the complexity of the review
required. You will be notified of the estimated total processing cost if it
is anticipated that, due to the extent of the review required, the total cost
will exceed $1,500. In that situation, our review would be suspended pending
written authorization from you to proceed.
Any items indicated in Column 1 of the checklist should be submitted within 30
days to the following address:
Federal Emergency Management Agency
Federal Insurance Administration
Office of Risk Assessment
500 C Street, SW, Room 422
Washington, DC 20472
Attn: Mr. Charles A. Lindsey
2
The case number referenced above should be included on any check or money
order for identification purposes and sent by Registered Mail, Return Receipt
Requested.
Please note that any initial fee already submitted will be applied to this
request only if we receive all items indicated on the checklist within 90 days
of the date of this letter. After 90 days, the request will be treated as an
original submittal and will be subject to all submittal/payment procedures,
including the initial fee. However, should you wish to withdraw your request
for a conditional LOMR at this time, you may submit a written request for
return of data and reimbursement of any initial fee already submitted by
writing to the address given above within 90 days.
To provide assistance in preparing the required data, we have enclosed a copy
of Parts 65 and 72 of the National Flood Insurance Program and Related
Regulations. Part 65 describes the FEMA policy concerning revisions to Flood
Insurance Study maps; Part 72 describes the reimbursement procedures.
If you have any questions concerning FEMA policy, or the National Flood
Insurance Program in general, please call Matthew B. Miller of our Head~
quarters staff in Washington, D.C., at (202) 646-3461.
Sincerely,
William R. Locke
Acting Chief, Risk Studies Division
Federal Insurance Administration
Enclosures
cc: The Honorable Mark Wolfe, Mayor of the City of Coppell Ms. M. Shohre Daneshmand, P.E., Acting City Engineer
Mr. Ronald W. Morrison, P.E., Kimley-Horn and Associates, Inc.
Federal Emergency Management Agency
~Vashington, D.C. 20472
case No.: 91-06-36R
DATA REQUEST CHECKLIST
FOR CONDITIONAL LETTER OF MAP REVISION
Requestor: Mr. William A. Anderson Date: N~R ~2 !991
The items checked below in Column 1 are required to process your request for a
conditional Letter of Map Revision. Items checked in Column 2 have been
received and should not be resubmitted unless specifically requested.
(i) (2)
Required Received
X 1. A written description of the scope of the proposed project
and the methodology used to analyze the project's effects.
2. Hydraulic backwater models of the 100-year flood for the
following:
a. Existing conditions (all cross sections should
reflect conditions prior to construction of the
project)
b. Proposed conditions (same cross sections as the
existing conditions model, reflecting the proposed
project)
3. Hydraulic backwater models of the 10-, 50-, 100-, and 500-
year floods for the following:
a. Duplicate of the effective FIS model
X b. Existing conditions (effective FIS model including
cross sections through the project site all cross
sections should reflect conditions prior to construc-
tion of the project)
X c. Proposed conditions (existing conditions model
reflecting the proposed project)
4. Floodway hydraulic backwater models of the following:
a. Duplicate effective
X b. Existing conditions
X c. Proposed conditions
X 5. A copy of the Flood Insurance Rate Map with the project
area indicated.
X 6. Topographic mapping of the entire area covered by the
proposed conditions model, indicating the locations of all
cross sections used in the hydraulic model and delineating
the proposed lO0-year floodplain boundary.
(1) (2)
Required Received
7. Topographic mapping of the entire area covered by the
proposed conditions model, indicating the locations of all
cross sections used in the hydraulic model and delineat-
ing:
X a. The proposed 100- and 500-year floodplain boundaries
X b. The proposed floodway boundary
8. Other:
X 9. Community acknowledgment of the conditional LOF~ request
(a form is enclosed for the community's use, if desired).
10. Initial fee for conditional Letter of Map Revision
a. Review of new hydrology $ 245
b. New bridge or culvert (no channelization) $ 490
X c. Channel modifications only $ 560
d. Channel modification and new bridge or culvert $ 735
e. Levees, berms, or other structural measures $ 945
f. Structural measures on alluvial fans $2800
g. Fee exemption certification in compliance with
~ational Flood Insurance Program regulation
72.5.
The items checked in Column 1 should be sent within 30 days to the following
address:
Federal Emergency Management Agency
Federal Insurance Administration
Office of Risk Assessment
500 C Street, SW, Room 422
Washington, DC 20472
Attn: Mr. Charles A. Lindsey
Any initial fee for the request, in the form of a check or money order made
payable to the National Flood Insurance Program, should be sent by Registered
Mail, Return Receipt Requested. The case number referenced above should be
included on the check or money order for identification purposes.