WA9302-CS 960625 (2)SHIMEK, JACObS FINKLEA
CONSTRUCTION REPORT
Prepared ~_
By: Matt Hickey Cy~
Project No. 94156
Date: 6/25/96
Is This A
Working Day? [] Yes
Owner: City of Coppell
Project Name:
Contractor: North Texas Municipal Construction Co., Inc
Village Parkway Pump Station Addition
Construction
Time Allotted: 300 Used:
Number
Superintendent: Bill Bigham. Men Working:
Weather Conditions: Cloudy and Hot
Site Conditions: The site was reasonably clean and maintained
[] No
131
7 Hours: 9:00 am to 9:30 am
WORK DESCRIPTION
1. Preparations were being made for the foundation to be poured.
2. The City selected the color of shingle to be used on the pump station and the color of paint for the outer fence.
3. The brick masons were working on the outside fence extension.
4. Bill Bigham was given a copy of the City of Coppell Standard Details for the screening wall specified in the
plans. He indicated that the screening wall would be constructed according to the plans.
5. Larry Davis showed concerns on the conditions of the interior of existing pump station. He indicated that the
interior must be cleaned to the conditions it was in before construction began and that all tools a materials will
need to be stored outside the pump station in a trailer supplied by North Texas Municipal Construction Company.
cc: North Texas Municipal Construction Co.