Loading...
WA9302-CS 960625 (2)SHIMEK, JACObS FINKLEA CONSTRUCTION REPORT Prepared ~_ By: Matt Hickey Cy~ Project No. 94156 Date: 6/25/96 Is This A Working Day? [] Yes Owner: City of Coppell Project Name: Contractor: North Texas Municipal Construction Co., Inc Village Parkway Pump Station Addition Construction Time Allotted: 300 Used: Number Superintendent: Bill Bigham. Men Working: Weather Conditions: Cloudy and Hot Site Conditions: The site was reasonably clean and maintained [] No 131 7 Hours: 9:00 am to 9:30 am WORK DESCRIPTION 1. Preparations were being made for the foundation to be poured. 2. The City selected the color of shingle to be used on the pump station and the color of paint for the outer fence. 3. The brick masons were working on the outside fence extension. 4. Bill Bigham was given a copy of the City of Coppell Standard Details for the screening wall specified in the plans. He indicated that the screening wall would be constructed according to the plans. 5. Larry Davis showed concerns on the conditions of the interior of existing pump station. He indicated that the interior must be cleaned to the conditions it was in before construction began and that all tools a materials will need to be stored outside the pump station in a trailer supplied by North Texas Municipal Construction Company. cc: North Texas Municipal Construction Co.