Lake Park-CS 910107· ::~!' ~:...:l^~C~ll~l' 'ill :'i l.¥ .... l' l:l l
'llleT: :}' ~l.l:ll.: l.l:: I I --
: ~ ' Lak~ark ~it~~
Dear Ms. Da~h~a~d:
The 'City o'f Coppell Public Works Development Review Co~ittee,
including the Street, Water, Parks, Engineering and Inspection
departments have reviewed the above referenced plans for
confo~ance to City ordinance and standards. The following sets
forth our co~ents.
-1. Include City of Coppell standard details, as applicable.
· '.:~.'2." On the drainage area map, please identify the 100 year
.floodplain.
3. Please provide a pe~anent B.M. within the subdivision tied
to USGS datum (m.s.1.).
4. Please include pond/l'ake plans and how drainage from
subdivision impacts this pond/lake. Also include
irrigation/landscape plans for the area as well as grading
and drainage plans.
5. Need to include in final plat conditions the
development/dedication of park property- to City.
6. Provide verification that 404 Corps permit has been received.
7. Provide documentation that a Letter of hap Revision has been
received prior to start of construction.
8. Provide documentation that all fees have been paid.
9. Address comments on water and sanitary sewer plan and
profiles.
10. On drainage area map, indicate offsite drainage.
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
Please have the engineer address and/or correct the above
comments, return the marked up plans along with the corrected
sets of final plans to the city of Coppell for stamping by the
City Engineer. They need to submit as many sets of plans as they
need stamped plus four (4) sets which will be retained by the
City of Ceppell.
Should you have any questions, please contact our office.
Sincerely,
Gabe Favre
GF/dsp
cc: Dan M. Dowdey & Assoc.
H. Wayne Ginn, P.E.
Sanford Case, P.E.
John C. Karlsruher, P.E.
File ~0441