Loading...
Lake Park-CS 900924 (2) Coppell, Texas 75019 / ~ FAX 214 - 393-0948 Septe~er 2~ 1990 2 '~ 5. ~j~ll Av~. ~nsfiel~, TX 7606~  Lake Park AddiWion/~oodplain Recitation Study De~. Wise~ Attached please find a copy of a letter I received from Ron Morrison, P.E. of K~ley-Horn & Associates, Inc. dated Septe~er 13, 1990, per his review of your recitation project. As a result of our meeting with you on Septe~er 13, 1990 and the referenced letter, we provide the following co~ents~ - As per the Flood Ordinance #219, Sec. 4.3-1 It~ 92, ...all necessa~ pe~its must be obtained from federal, state or local agencies from which prior approval is required..., such as 404 Pe~it from Corps of Engineers (C.O.E.). - As indicated in ~. Morrison's letter, and per dete~ination made by C.O.E., you must obtain a pe~it under section 404 of the Clean Water Act. The letter you provided from C.O.E. is only a wetland dete~ination and not a 404 Pe~it. Ail co~ents made by Ron Morrison, as per attached letter, must be addressed within thirty (30) days from the date of this letter. - There shall be no reduction of, and no fill in the wetlands in the United States without a C.O.E.'s 404 Pe~it. It is our understanding that there is no fill work to be done in the designated wetland areas. - Provide grading plans with at least four (4) cross sections including the proposed excavation and proposed fill. A blueprint of such grading plan must also be sent to C.O.E. for their review. Please identify and delineate the wetland areas within your proposed subdivision. Letter to Mr. Tom Wise September 24, 1990 Page 2 - We received the revised final construction plan for this project on September 13, 1990 from Dan M. Dowdey & Associates, Inc. We will review these plans and provide you with our comments, as it may impact the amount of proposed fill to be placed in this subdivision, to insure no flooding in streets and generally, in the subdivision. - Lake Park Addition has been reviewed based on the old Floodplain Ordinance %219, dated June 24, 1980, as per the developers' previous agreements with the City of Coppell. This project does not meet the criteria set forth in the revised Floodplain Ordinance %87390 adopted back in 1987. - The owner of the property shall furnish the City of Coppell a letter stating that he will assume all liabilities associated with early excavation, fill, or any construction of this project, in and adjacent to the floodplain of Denton Creek and will indemnify and hold harmless the City of Coppell from any damages resulting from such development activities. This letter must be submitted to the City prior to issuance of early excavation and grading permit. Upon receipt of the above indemnification letter, we conditionally approve your request for early excavation and ask that all the above listed comments be addressed within the next thirty (30) days from the date of this letter. We look forward to working with you on this project and, if you have any questions, please let me know. Sincerely, ! ~- l' \. ~.l'"~ ~ '-",~;' Mr-Shoh~e~---Da~hmand ~-----p ~ ~ Acting City Engineer Enclosures MSD/bd t xc: ~/Steve Goram, Director of Public Works John Karlsruher, Ginn, Inc. Bill Anderson, Dan M. Dowdey & Associates Ron Morrison, Kimley-Horn LAKEPARK. MSD - Kimley. Horn ............ X ¢; J Kimley-Horn and Associates, Inc. ENGINEERS · PLANNERS · SURVEYORS j~.,~.~. 12660 Coit Road, Suite200 Dallas, Texas 75251 214 386-7007 Facsimile 214 239-3820 Jl SEP 141gl September 13, 1990 Ms. Shohre Daneshmand Engineer City of Coppeil Post Office Box 478 Coppell, Texas 75019 Re: Second Review of the Lake Park Addition Floodplain Reclamation Study by Dan Dowdey and Associates Dear Ms. Daneshmand: On August 17, 1990, we provided our first review of the subject study. That review identified two major items that must have been addressed before we could recommend approval of the report. On August 24, 1990, we received a second report that addressed our initial concerns. We have now completed our review of the second report and we have attended a meeting with you, Mr. Tom Wise, and Mr. Bill Anderson to discuss our further concerns. The following items will be needed before we can recommend acceptance of the second report: 1. Corps of Engineers 404 Permit: This item is a two step process. First, a wetlands determination must be made by the Corps of Engineers. Second, a 404 Permit must be obtained for any fill completed in this identified area. The first step has been completed. (See attached letter). It is our understanding that no fill work is to be done in the lake. If so, no 404 Permit is required for this area. However, an area within the subdivision was identified as a wetland area. No work may be completed in this area until a 404 Permit is received from the Corps. 2. Hydraulic Model Clarifications: The following additional information is required before we can recommend acceptance of the hydraulic model presented in the subject report. a. Additional cross sections are needed at the upstream and downstream limits of the project. One cross section is not sufficient to describe the flood elevations. Anaheim * Charlotte * Dallas * Fort Lauderdale * Fort Myers * Nashville * Orlando * Phoenix Raleigh ,~ San Diego * Stuart * Tampa * Vero Beach * Virginia Beech * Weal Palm Beach Building client r elallo n a h I p s since 1967 C 9-90~CoplPmt. retm\919 I. 15 Ms. Shohre Daneshmand - 2 - September 13, 1990 b. The effective flow definition (x3 card) should be consistent with the limits of the floodplain. c. The floodway model should match the recently submitted correction sent to FEMA. It was generally agreed at today's meeting that the finished floor elevations would be above the 100-year ultimate condition model, and that the pad elevations would be at least 2 feet above the 100-year ultimate condition flood elevation. Before today's meeting we also discussed the project with John Karlsruher of Ginn Inc., and he indicated that they have no problems with the project at this point. We also discussed the project with Phil Deaton and Steve Yetts of Carter and Burgess and they both agreed that the project is compatible with the MacArthur Boulevard construction that is presently underway at the site. Finally, the Developer may start grading work on the site, with two provisions. First, the requirements specified in this letter should be completed as soon as possible, and second, no structures be started until all of the provisions addressed in this letter are met. If we can provide further information please call me. Sincerely, KIMLEY-HORN AND ASSOCIATES, 1NC. Ronald '~t/. Morrison, P.E. Senior Hydrologist pw Attachment C 9*90~CoplPark. rwm~919 LI$