Loading...
Lake Park-CS 900419 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT LAKE PARK ADDITION - FINAL PLAT P & Z HEARING DATE: April 19, 1990 C. C. HEARING DATE: May 8, 1990 LOCATION: Along the west side of MacArthur Boulevard, northwest of DeForest Road, and south of Denton Creek. SIZE OF AREA: 26.195 acres, containing 91 lots. REQUEST: Approval of a final plat with the following variances: 1) minimum street centerline radius to be less than 425 feet, 2) allow Circle Cove Drive intersection with MacArthur Boulevard ali~mment, 3) exemption to the Floodplain Management Ordinance, 4) allow curved sanitary sewers. APPLICANT: Mr. Bill Anderson Univest Properties Dan Dowdey and Associates 12201 Merit Drive, #170 16250 Dallas Parkway, Suite 100 Dallas, Texas 75251 Dallas, Texas 75248 (214) 991-4600 (214) 931-0694 HISTORY: This property was originally platted in 1987 and contained 92 lots. Because the market for single-family units has changed dramatically since that time, the applicant is requesting to amend the plat to be more responsive to the local housing demand. The City Attorney has ruled that this revised final plat can be considered by the Planning Conumission without requiring a new preliminary plat. ANALYSIS: This property was originally platted in 1987 and contained 92 lots on 22.2 acres. The revision before you contains 91 lots on 26.2 acres. Although staff is generally supportive of the deviations to the ordinance as requested, an elaboration of each is in order. REQUEST: Minimum street centerline radius less than standard 425 feet. ITEM 10 STAFF RESPONSE: The applicant has pointed out that at least 14 existing subdivisions have been built in Coppell, which do not meet this minimum guide. The standard itself addresses street design which accommodates more than just local, residential traffic. Our consulting engineer is correct in pointing out that since we have no written guidelines which address local, neighborhood streets, the only standard he can apply is the written 425 foot requirement. Common sense, on the other hand, would suggest that on a case-by-case basis, the Planning Commission and City Council have the flexibility of determining ~easonable guidelines to follow, and have, in fact, in at least fourteen (14) residential neighborhoods, done so with no negative repercussions. Planning staff supports this variation in the standard subdivision requirement. REQUEST: Allow Circle Cove Drive intersection with HacArthur Boulevard. STAFF RESPONSE: If the Commission and Council allows this design (Planning staff does not have strong opposition), we would recommend that it be approved as a temporary access only until the extension of MacArthur Boulevard (to the north) allows construction of Lake Park Drive. At that time Circle Cove at MacArthur should be closed, gated, and indicated as a fire lane easement and emergency access easement only. REQUEST: Allow exemption to the Floodplain Management Ordinance. STAFF RESPONSE: Staff is bothered by this request. The applicant's claim of exemption based on a 1982 agreement with the City of Coppoll can not be verified. We are very much opposed to allowing any exemption. If, however, Commission or Council is inclined to grant this request, we would strongly urge referral to the City Attorney for his opinion before taking affirmative action. REQUEST: Curved sanitary sewers. STAFF RESPONSE: We can find no documentation which would allow this alteration. ALTERNATIVES: 1) Approve the final plat with conditions. 2) Approve the final plat without conditions. 3) Deny the final plat. ATTACHMENTS: 1) Final Plat 2) Consultant's review recommendation LPRKSTF