Loading...
Lake Park-CS 900329· - ?ILE COPY CITY OF COPPELL PUBLIC WORKS ENGINEERING DIVISION Shore Daneshma_nd, Phone # 462-8495 FINAL PLAT AND PLANS: A. Please make the following additions and/or corrections on final plat as marked: i) - Name of the proposed subdivision must be consistent on the plat and all pages of the construction plans, etc. 2) - Location . . width . . . and the name of all existing ,..or recorde~ streets intersecting the boundary of the / tract. 3) /- Delineate the existing and proposed zoning of the site and 'the surrounding properties. 4) / The accurate outline of all property which is offered for dedication for public use with the purpose indicated there on. Fire lanes must be shown on final plats. 5) -~/ Certification by a registered Public Surveyor to 'the effect that the plat represents a survey made by him. 6) /- /Delineate utility signature block on the final plat. 7) ~/ Per Floodplain Management'Ordinance #87390 (Art. 5, Sec. C, Item 4, Page 34), all subdivision proposals must have the following note placed on the preliminary and final plats~ "Floodplain Development Permit Application No. ham been filed with the City of Coppe].l Floodplain Administrator, on , , 19 ." (Floodplain Administrator) (Date) 8) - No Comment. Page 1/3 B. The following information, as marked, is required to be contained in the final con:~ truc tion plans of 'the above pro~ect: 1) j Provide final construction plans, simultaneous].y 'with Final plans-.-must.--have-.-.a, cove~ final plat submittal. 'hd standard detail sheets-.." sheet, detailed design plans~' 2) - A cover sheet, for final construction pi'abe"shall include the following ~ * Name of the project * Owner's name and address * Engineer's name and address * Architect's name and address *'~-'~ Vicinity map ×-~Index list, covering all pages included in the set ~/,~.Plan Approval Paragraph", see attached 3') - ~-/Detailed final construction plans shall contain the following ~ * All required street paving plans and profile sheets. * Ail required storm drainage plans and profile sheets. * Ali. required alley paving plans and profile sheets. * A complete and accurate drai. nage area map and detail grading plan. * All required letters of permision from adjacent property o~ners. * All required water and sewer engineering plans. 4) - ~/~rovide barricading plans. / 5) ~/ Provide trench safety, sealed by a registered engineer in the State of Texas. 6) - Delineate proposed and existing water distribution system and pipe sizes. 7) - De].ineate proposed and existing sewage collecti, on system and pipe sizes 8) - Provide a Drainage Area Map covering two parts: a) show On-site Drainage Map, on a scale of 40'. 50' etc. . . ' with ali. details as required in the Subdivision Ordinance; b) show 'the Off-site Drainage Map, on a scale 1" = 100', 200', etc . Delineate the projeet'.~ boundary on it, plus thc': less detail, et! c.!rainage sys~em, to c:].early demonstrate the af.'fec~: of such activi-ties, drainage outfalls, on the adjacent properties and the Drainage Master Plan. 9) ~ all storm sewer systems must be designed for 100-year design frequency. Technical Paper 40 should be used to compute rainfall intensities, as per the Subdivision Ordinance, (Appendix "A" Page 30) , · 10) - Show the hydraulic calculations for each portion of the · .'storm system on the profile, such as pipe size, Q100 ./ ...... ~ /'~ (cfs), Qc (cfs), S, V (FPS) etc. . . /' 11) - Ail lots w£th±n or adjacent to the lO0-year Floodplain  shall have the lowest floor elevation for each building ~ /' site shown on the site grading plans. · ., - A permanent bench mark must be established with in a subdivision development, see attached Floodplain Development checklist. 1.3) - Each sheet of the plans shall contain a title block and /...' consistent page numbers. 14) ~/ All appropriate fees as per subdivision ordinance must be paid. 15) ~/" Delineate a Revision block on each sheet. Revision dates must be shown on each sheet with Engineer's initials next to them. - All above comments must be addressed, prior to Staff's recommendation for approval of the final plat and plans. 17) - Provide a written response on all comments with explanations provided on items not addressed as requested above. DRC/COMMENTS/ENG/FINAL SD/bb Page 3/3 CITY OF COPPELL PUBLIC WORKS WATER UTILITIES DIVISION FINAL PLAN REQUIREMENTS Howard Pafford, Water Utilities Superintendent Phone 462-8495 Water/Sanitary Sewer Plans: Please make the following additions and/or corrections as marked: 1) - Show existing water/sanitary sewer lines as located in the area where they exist. 2 ) - Show proposed water/sanitary sewer lines. (minimum sizes are 8") 3) -/" --~proposed placement of valves, manholes, fire hydrants, clean out, water services, and sewer services. 4) -~/'" ~w sanitary sewer line profiles as related to existing and finished grade. 5) / how all necessary easements as 20 ft. unless the proposed easement is located between two lots, then 15 ft. is allowed. If any off site easements are necessary, all documents concerning that easement shall be finalized prior to Council approval of the final plat. 6) - If the development is anything other than residential, the building area shall be noted on the plans. 7) ~' Per Subdivision Ordinance Section XVI, Item "B", Page 20, the following listed fees must be paid nine (9) working days prior to CC meeting: water and sewer availability. .' · water tap fee. . . and sewer tap fee. Page 1/2 8) - General Notes: A. All Construction material will conform to the City of Coppell Standard Construction Detail and Subdivision Ordinance. B. All construction will conform to the City of Coppell Standard Construction Detail and the North Central Council of Government Standard Specifications for Public Works Construction. 9) - Additional Notes: A. All residential service lines shall be 1" type "k" copper. B. All materials shall be furnished by the Contractor. 10) - See attached requirements on water services. 11) - See attached requirements for "Meter ~.Application Standards". 12) -//Ail above comments must be addressed, prior to staff's recommendation for approval of the final plat and plans. 13) - Provide a written response on all comments, with explanations provided on items not addressed as requested above. 14 ) - No comment. DRC/COMMENTS/WAT/FINAL SD/HP/pd Page 2/2 PLAT/PLAN REVIEW MEMORANDUM DRC DATE: 3/2g/90 SUBDIVISION/PROJECT: LAKE PARK ADDITION - Final Plat and Plans BY: ENGINEERING/PUBLIC WORKS DEPARTMENT & PARKS DEPARTMENT ADDITIONAL REVIEW COMMENTS (Supplemental to preprinted comments): FINAL PLAT: 1. Circle Cove Dr. connection to MacArthur Blvd. is unacceptable. 2. Minimum allowable radius of street centerltne curves is 425 feet. Curves 1,2,3,4,5,7,12,14,15, and 19 are not in compliance with minimum radius requirement as shown on the marked up copy of the Final Plat transmitted herewith. 3. Show adjacent Floodplains and indicate floodplain development information and indicate current status. 4. Sanitary Sewer Easement required on lots 7 & 8, Block A. 5. Show all street corner visibility easements to be dedicated. 6. Show all drainage, floodplain/floodway, utllity, and access easements which are required to be dedicated by the Subdivision and Floodplain Management Ordinances. 7. Indicate status of R.O.W. dedication for MacArthur Blvd. 8. Identify the purposes of the small tracts abutting the M.U.D. Lift Station site. EN6INEERING PLANS: Paving Plans 1. Engineer's seal on original plans shall be original with engineer's origtnal signature and date in close proximity to seal as required by State Law. Blue line prints indicate non-compliance with State Law. 2. Show Drainage direction arrows on plans. 3. Minimum street centerline, curve radius is 425 feet. Revise sheets 2, 3, 4, and 5 of ? accordingly. 4. Minimum street grade is 0.50%. Revise sheets 2,3, and 5 accordingly. 5. Coordinate medlar openlngs on MacArthur Blvd. with property owner on opposite side of MacArthur Blvd. Water and Sewer: 1. No curves allowed in sanitary sewers. 2. Provtde written documentation substantiating owner's non- participation in the cost of the 12" water line to be constructed in MacArthur Blvd. 3. Sanitary Sewer Easement required on lots ? & 8, Block A. 4. Show all required drainage, ut111ty and access easements required. Drainage Plans: 1. Use TP-40 with a minimum Tc of 10 Minutes for computation of stormwater runoff as required by the Subdivision Ordinance. Dedicate all easemen~ss shown on marked p'lans and otherwise required. 3.Indicate flow directions to all inlets. 4. Establish, indicate and maintain minimum vertical clearance of sanitary crossing on line "C" 5.Furnish documentation indicating current status of Denton Creek floodplain on or adjacent to property. Comply with floodplain management ordinance. Lake: 1. Furnish documentation indicating final agreement between City of Coppell and owner regarding lake and park dedication. 2. Verify agreed size of lake and park. 3. Furnish engineering data for lake including, but not limited to details and calculations of stormwater inflow, detention, storage, maximum water surface elevations and outflow to Denton Creek. 4. Furnish documentation of permission granted for the creation of this impoundment by the applicable federal, staCe, and local authorities. 5. Show the proximity of the lake and park to Denton Creek, MacArthur Blvd., and the proposed MacArthur Blvd. bridge.