Loading...
FS9903-CS 941027Morrison Hydrology/Engineering, Inc. 520 Avenue H East * Suite 102 * Arlington, Texas 76011 · Metro (817) 640-4554 October 27, 1994 Mr. Ken Griffin city Engineer City Of Coppell 255 Parkway Boulevard P. O. Box 478 Coppell, Texas 75019 Re: Storage Loss Calculations for the 10 Acre Site Owned by Sandy/Mac Partners, Inc. South of Sandy Lake Road Adjacent to MacArthur Blvd. in Coppell, Texas Dear Mr. Griffin: As we discussed at our meeting on Tuesday October 25, 1994 the only missing information for this project submittal was the storage loss amount. This amount is to be off set by the pond excavation we discussed. The total storage on the 10 acre site is 12.802 acre feet. At a flood elevation of 446 feet. Pilling the site will eliminate all but 2.492 acre feet which is contained in the 75 feet wide channel. This means that the pond excavation must accommodate an extra 10.31 acre feet of storage to offset the losses. Let me know if you need additional information. Sincerely, MORRISON BYDROLOQ'Y/ENGINEERING, INC. Ronald W. Morrison, P. E. Senior Hydrologist