Loading...
WA9302-CS 960801G EOTECHNICAL E NGINEERING E NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 August 1, 1996 Mr. Mark R. Torp Surety Claims Counsel Surety Claims 135 CNA Surety Companies CNA Plaza Chicago, IL 60685 Re: Bond No. 137 845 895 Natgun Corporation Continental Casualty Company City Of Coppell (Village Parkway Ground Storage Reservoir No. 2, Project No. WA-9302, Coppell, Texas GEE Consultants, Inc. (214) 352-5433 · Fax (214) 352-6972 Dear Mr. Torp: As per your letter dated July 22, 1996, enclosed is the following information that you requested: 1.) 2.) Subcontract and/or Purchase orders GEE Consultants, Inc. did not execute a written contract agreement. All services were verbally authorized by representatives of Natgun Corporation. However, we are enclosing a copy of a letter dated June 03, 1996 confirming portions of authorized services. Unpaid Invoices Invoice No.'s 5258-1 (September 25, 1995) through 5258-6 (February 29, 1996) are enclosed. 3.) Statement of Account and Proofs of Delivery We do not send out statements of account and Proofs of delivery. The only proof of our delivery is our reports of our service offered on specific date, time, and kind of service, since our services are quality control inspection and testing. 4.) Notice of Nonpay~nent Enclosed is the notice of non-payment sent to Natgun Corporation by certified mail on June 04, 1996 and July 15, 1996. Natgun was also verbally notified numerous ti~nes with regard to their unpaid invoices. Please let us know when we can expect pay~nent for our services provided. Thanking you in advance for your help. Sincerely, GEE Consultants, Inc. Geetha R. Krishnan, M.S.C.E., E.I.T. Project Engineer Construction Materials Engineering Division GRK:RWG/jd Attachment cc: Mr. Ken Griffin - City of Coppell Mr. Gary Hendrix - Shi~nek, Jacobs, & Finklea Richard W. Gee, P.E. President G EOI'ECHNICAL E NGINEERING E NVIRONMEN'IAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, lbxas 75229 · (214) 352-5433 · Fax (214) 352-6972 June 3, 1996 Mr. Bob Barbarisi Natgun Corporation Eleven Teal Road Wakefield, MA 01881-1292 RE: 6.0 MG Groundwater Storage Tank Coppoll, Texas Dear Mr. Barbarisi: CEI,tTIFII~iD MAIL RETURN RECEIPT REOUESTED The i~urpose of this letter is to confirm verbally authorized services by site superinteudent, Mr. Jim l~isher or Nalgun Corporation at ihe aforementioned project. On l)ecember 28, 1995, in a telephone conversatiou with the uudersigned, you requested we cast three additional cylinders ~'om a wall panel and three cylinders from a dome panel on the first day of on.-site panel construclion, in addition to test cylinders that were to be fabricated for the Cily of Coppell. I gave you the cost ~r additioual cylinders without the need for a second technician to cast such on site. On l)ecember 29, 1995, on sile, Mr. l:isher wanled our on-site field technician to check sluml~, air content, temperature and ihbricate one set ol' three cylinders fi'om every Redi-Mix truck used to cast panels. In addition, Mr. Fisher requested we complete Natgun's Concrete Quality Control Data sheets on site. Based on our proposal to the City of Coppell, we were to perform reinlbrcing steel inspections of all panels and were to cast one sel of three cylinders per 100 cubic yards concrele per day. We inlbrmed Mr. Fisher that casting one set of three cylinders, running slump, air, and temperature tests ~'om every truck as well as completiug Natgun's concrete quality control data sheets would require a second lechnician on site, costs for which were not included in our prol~osal to the City of Coppell. We inlbnned Mr. Fisher that the additional requested second technician and casting of cylinders h'om every truck were for the convenience and use of Nalgun Corporation, and the additioual time lbr a second technician as well as extra cylinders would have to be paid lbr by Natgun Corporation. Mr. Fisher told us that he could not get .--, .,. M~'. Bob Barbarisi, Natgun C oration June 3, 1996 in touch with you and confirm this matter, however, he approved a second technician to fabricate additional cylinders for December 29, 1995. The subject of paying for the additional teclmician and cylinders was again put to Mr. Fisher on January 2, 1996, and he again told us he had not talked with you. When we again spoke with Mr. Fisher on January 3, 1996, he informed us that he had spoken with you, and Natgun Corporation agreed to pay for the additional technician and cylinders. Please call if you have any questions. Sincerely, GEE Consultants, htc. Richard W. Gee, P.E. President RWG/Ij Enclosures cc: Mr. Larry Davis - City of Coppell Mr. Gary Hendricks - Shimek, Jacobs & Fi~ea GEE Consultants Page 2 of 2 GEE Consultants, Inc. 2540 Glcnda Lane * Suite 108 Dalhts, Texas 75229 To: Mr. Bob Barbarisi, Jr. Natgun Corporation Eleven Teal Road Wakefield, MA 01881.1-1292 Invoice No.: 5258-1 Invoice Date: September 25, 1995 Project: Field and Laboratory Testing Performed September, 1995 6.0 MG Ground Water Storage Tank Coppeil, Texas Terms: l)tte IJpol| Receipt Date of Saintfling 08-28-95 08-29-95 08-30-95 08-31-95 09-05 -95 09-06-95 09-07-95 09-11-95 09-14-95 09-15-95 09-18-95 Description Pier Inspection, Over time rate (before 7:30 am, after 5:00 pro) Pier lnst>ection Cancellation Pier lnsl~ectmn, over lime (before 7;30 am, aftel' 5:00 pro) Pier Inspection, over time (before 7;30 am, aftel' 5:00 pro) Pier h~spectlon, over tmle (before 7;30 am, after 5:00 pro) Pier ]llspectloll, over Illlie (before 7:30 am, after 5:00 pro) Pier [lls[~eclloll, over llllle (before 7:31.1 am, after 5:(10 Pier Insideorion, Over tram (befbre 7:30 am, after 5:00 pro) Pier Inspection, Over tune (before 7:30 am, after 5:00 pro) I'ier Insi~ection, Over rune (before 7:30 am, after 5:00 pro) l'ier Inslmction, Over t,me (before 7:30 am, after 5:00 pro) Quantity Rate Total 1.5 hrs $40.16 $60.24 2,75 hrs $29.75 $81.81 0.5 hrs $40.16 $20.08 1.0 hrs $40.16 $40.16 0.75 hrs $40.16 $30.12 0.75 hrs 0.5 hrs 1.0 hrs $40.16 $30.12 $40.16 $20.08 $40.16 $40.16 0.25 hrs $40.16 $10.04 0.75 hrs $40.16 $30.12 0.5 hrs $40.16 $20.08 09-19-95 Pier lnst~ection Cancellation, Regular time 4.0 hrs $29.75 $119,00 GEE Consultants, Inc. 2540 Glenda Lane * Suite 108 Dallas, Tcxas 75229 Natgun Corporation 6.0 MG Water Storage Tank September 25, 1995 Page 2 of 2 h~voice 5258-1 Date of Samifiing Descril~lion Quantity Rate Total 09-19-95 Pier Inspection Cancellation, Over time 0.5 hrs $40.16 $20.08 (before 7:30 am, afler 5:00 pro) 09-20-95 Pier Inspection Cancellation, Regular 2.75 hrs $29.75 $81.81 09-20-95 l'ier Inspection Cancellation, Over lime 0.25 hrs $40.16 $10.04 (before 7:30 am, after 5:00 pro) 09-21-95 Pier h~sl~ection, Over lime (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 09-22-95 Pier Inspection, Over lime (before 7:30 1.5 hrs $40.16 $60.24 am, af'ter 5:00 pro) 09-25-95 Pier Inspection, Over time (bel'ore 7:30 1.0 hrs $40.16 $40.16 am, after 5:00 pro) !'lease i'ay $734.42 GEE Consultants, Inc. 2540 Glenda Lane * Suite 108 Dallas. Texas 75229 To: Mr. Bob Barb.fist, Jr. Natgun Corporal,on Eleven Teal Road Wakefield, MA 01880-1292 Invoice No.: Invoice Dale: 5258-2 October 26, 1995 Project: Fieh. l and Laboratory Testing Performedd October, 1995 6.0 MG Ground Water Storage Tank Coppell, Texas Tenus: Due Upon Receipt Date of Sampling 09-26-95 09-27-95 09-28-95 {)9-29-95 10-02-95 10-03-95 10-04-95 I 0-05-95 I 0-06-95 10-09-95 10-10-95 10-11-95 Description l'ier Inspection, Over time rate (before 7:30 am. after 5:00 pro) Pier Insl>ection, Over lime rate (bclin-c 7:30 ant, after 5:00 pro) l'ier Inspeel,on, Over lime rate (before 7:30 aln. aflcr 5:00 pill) Pier hmpcclion, Over lime .'ate (bcfin'c 7:30 am, after 5:00 pro) Pier Inspection, Over lime rate (l~cfore 7:30 am. after 5:00 pro) l'ier lnsl>ection, Over time rate (beli..'e 7:30 am, after 5:00 pro) l'icr Inspection, Over lime rate (before 7:30 am, after 5:00 I'ier Insliner,on, Over linxc ,'ale (before 7:30 am, afer 5:00 pro) Pier insl~ection, Over lime ,'ate (before 7:30 am, afcr 5:00 pro) Pier lnsl>eclion, Over lime rate (belbre 7:30 ant, aflcr 5:00 pn0 Pier Inspeel,on. Over time rate (l~cliu'c 7:30 am, after 5:00 pro) Pier Insideeaton, Over lime rate (before 7:30 am, after 5:00 pro) Quantity Rate l'otal 0.5 hrs $40.16 $20.08 0.75 lars $40.16 $30.12 1.75 In-s $40.16 $70.28 1.0 hrs $40.16 $40.16 0.5 hrs $40.16 $20.08 1.25 hrs $40.16 $50.20 0.5 hrs $40.16 $20.08 i.25 hrs $40.16 $50.20 0.5 hrs $40.16 $20.08 0.5 hrs $40.16 $20.08 1.0 hrs $40.16 $40.16 1.5 hrs $40.16 $60.24 GEE Consultants, Inc. :2540 Glenda Lane * Suite 108 Dallas, Texas 75229 Nalgun Corporalion 6.0 MG Water Slorage Tank October 26, 1995 Page 2 of 2 Invoice 5258-2 Date of Sampling I)escri!~ti°n Quantity Rate Total 10-12-95 Pier Inspection, Over lime rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 10-13-95 Pier Inspection, Over time rate (bcfore 7:30 1.0 hrs $40.16 $40.16 am, after 5:00 pro) 10-16-95 Pier lnsl~eclion, Over time rate (bet'ore 7:30 0.5 hrs $40.16 $20.08 am, aftcr 5:00 pro) 10-17-95 l'icr h~speclion, Over lime rate (bcl'ore 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) I{}-18-95 I'icr Inspcclion, Over lime talc (bcli~re 7:30 1.0 hrs $40.16 $40.16 am, al'tcr 5:00 pro) 10-19-95 I'icr h~spcction, Over lime tale (beli~re 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 10-20-95 l'ier !nspeclion, Over time rate (bcl'ore 7:30 0.25 hrs $40.16 $10.04 am, after 5:00 pro) 10-23-95 i'icr Inspection, Over lime rate (be[ore 7:30 1.0 hrs $40.16 $40.16 am, after 5:00 pro) 10-24-95 Pier h~speclion, Over lime rate (before 7:30 0.5 hrs $40.16 $20.08 am, al'ler 5:00 pro) 10-25-95 Pier lnspcclion, Over time rate (bcli~re 7:30 0.5 hrs $40.16 $20.08 am, al'lcr 5:00 pro) 10--26-95 Pier lnspcclion, Over lime tale (bcliu'e 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) Please Pay $712.84 G !£1~] Consultants, Inc. 2540 Glcnda I Jane · Suite 108 Dallas, Tcxas 75229 To: Mr. Bob Barbarisi, Jr. Invoice No.: 5258-3 Natgun Corporation Invoice Dale: November 27, 1995 FAeven Teal Road Wakefield, MA 01880-1292 Project: Field and Laboratory Testing Performed November, 1995 6.0 MG Ground Water Storage Tank Coppell, Texas Terms: I)ue IJpon Ikceipt Date of Sam!fling Description Quantity Rate Total 10-30-95 Pier h~spection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 " am, after 5:00 pro) 10-31-95 Pier h~spcction, Over lime rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:(.)0 pro) 11-01-95 Pier htsl~ection cancellalion, Over lime (.}.5 hrs $40.16 $20.08 (before 7:30 am, after 5:00 pro) 11-01-95 l'icr Inspection cancellation, Regular time 2.25 hrs $29.75 $66.94 11-01-95 Trip Charge 1 ea $12.50 $12.50 I 1-02-95 l'ier htspcction, Over ttme rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 11-03-95 l'ier h~spcclion, Over tune rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 11-06-95 l'icr h~sl~cclion, Over ipuc rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 11-07-95 Pier Inspection, Over tune rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 11-08-95 l'icr hmpection, Over rune rate (l~cforc 7:30 1.0 h,'s $40.16 $40.16 am, after 5:00 p,n) 11-09-95 I'icr Inspection, Over lime talc (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 GEE Consultanls, Inc. 25,10 Glenda l,ane · Suile 108 Dallas, Texas 75229 Natgun Corporation 6.0 MG Water Storage Tank November 27, 1995 Page 2 of 2 Inwfice 5258-3 I)ate of Sampling 11-10-95 Descriplion Pier Inspection, Over time rate (before 7:30 am, after 5:00 pro) Qtmntily 0.5 hrs Rate $40.16 Total $20.08 l'lease l'ay $300.32 EOI ECIINICAL G iE GEE Consultants, Inc. E~NVIRoNMENIAL 2540 Glenda Lane · Suite #108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 I INVOICE] To: Mr. Bob Barbarisi, Jr. Invoice No.: 5258-4 Natgun Corporation Invoice Date: December 26, 1995 Eleven Teal Road Wakefield, MA 01880-1292 Pro. jeer: Field and Labora|ory Testing l~erformed December, 1995 6.0 MG Ground Water Storage Tank -' Copl~ell, Texas Terms: l)ue Upon Receipt Date of Sampling Descriptiou Quantity Rate Total 12-09-95 Concrete Mix Inspection, Over lime rate 9.5 hrs $10.41 $98.90 (Saturday) 12-09-95 Concrete Mix Inspection, Over time tale 6.0 hrs $40.16 $240.96 (before 7:30 am, after 5:00 !'lease Pay $339.86 G[o I EC[ INICAI_ .. E GEE Consultants, Inc. ! E i NVIRONMENIA[ ', 2540 Glenda Lane * Suite ~ 108 · Dallas, Texas 75229 · (214) 620-9791 * Fax (214) 620-9794 J lNVOICEI To: Mr. Bob Barbarisi, Jr. Invoice No.: 5258-5 Natgun Corporation Invoice Date: January, 26, 1996 Eleven Teal Road Wakefield, MA 01880-1292 Prqject: Field and Laboralory Testing i'erformed January, 1996 6.0 MG Ground Water Storage Tank -' Col~pell, Texas Terms: l)ue Upon !~eceipt Date of Sampling Descri!~ti°u Quantity Rate Total 12-29-95 Concrete Mix Inspection 7.0 hrs $29.75 $208.25 12-29-95 Concrete Mix Inspection, Over lime rate 1.0 lu's $40.16 $40.16 (after 5:00 pro) 12-29-95 Concrete Cylinders 10 ea $13.00 $130.00 12-29-95 Cylindcr Molds Ibr Field llold Cylinders 12 ca $1.00 $12.00 12-29-95 Trip Charge I ca $25.00 $25.00 (}1-02-96 Ct}llcrclc Mix lnspcclion, Rcgul:u-lime talc 6.5 lus $29.75 $193.38 01-02-96 Concrete Cylinders 9 ca $13.00 $117.00 (11-02-96 Cylinder Mvlds for Field llold Cylinders 7 ca $1.00 $7.00 01-02-96 Trip Charge 1 ea $25.00 $25.00 01-03-96 Concrele Mix Inspection, Regular lime rate 7.5 hrs $29.75 $223.13 01-03-96 Concrete Cylinders 8 ca $13.00 $104.00 01-03-96 Cylinder Molds for Field llold Cylinders 8 ea $1.00 $8.00 01-03-96 Trip Charge I ca $25.00 $25.00 Date of ~ Sam p[ing l)f" i priori Quaut ity te Total 01-04-96 Concrete Mix Inspection, Regular lime rate 7.5 hrs $29.75 $223.13 01-04-96 Concrete Mix Inspection, Over lime rate i.0 hrs $40.16 $40.16 (before 7:3{) am, after 5:00 pro) 01-04-96 Cylinder Molds for Field llold Cylinders 12 ca $1.00 $12.00 014)4-96 Concrete Cylinders 10 ca $13.00 $130.00 01-04-96 Trip Charge I ca $25.00 $25.00 (11-05-96 Concrete Mix Inspcclion, Regular lime n'ate 7.5 hrs $29.75 $223.13 01-05-96 Concrete Mix hnspcclion, Over lime talc 1.0 hrs $40.16 $40.16 (before 7:30 am, aflcr 5:00 pro) 01-05-96 Concrete Cylinders 9 ca $13.00 $117.00 01-05-96 Cylinder Molds for Field llold Cylinders 10 ca $1.00 $10.00 (tl-05-96 Trip Charge I ca $25.00 $25.00 01-08-96 Concrete Mix and Rcbar h~spcclion, Regular 7.75 hrs $230.56 tittle rate $29.75 01-08-96 Concrete Mix Inspection, Over lime rate 1.0 hrs $40.16 (before 7:30 am, afler 5:00 I>nl) $40.16 (11-08-96 Concrete Cylinders 7 ea $13.00 $91.00 01-0g-96 Cylinder M{~lcls for Field Ilold (~ylinclcrs 6 ea $1.O0 $6.00 01-08-96 Trip Clmrgc I ca $25.00 $25.00 01-09-96 Concrete Mix Inspection, Regular timc rate 7.75 hrs $29.75 $230.56 01-09-96 Concrete Mix Inspection, Over linK: ralc 1.0 hrs $40.16 (before 7:30 am, after 5:00 pro) $40.16 01-09-96 Concrete Cylinders 9 ca $13.00 $[ 17.00 01-09-96 Cylinder Molds li>r Field llold Cylindcrs 10 ca $1.00 $10.00 01-09-96 Trip Charge Iea $25.00 $25.00 01-10-96 Concrete Mix Inspection, P-egular lime rate 7.75 Ins $29.75 $230.56 01-10-96 Concrete Mix Insl~cclion,Oven' time rate 1.0 hrs $40.16 (before 7:30 am, af|er 5:00 pro) $40.16 01-10-96 Concrete Cylinders 9 ca $13.00 $117.00 01-10-96 Cylinder Molds liu' Field ltold Cylinders l0 ca $1.00 $10.00 01-10-96 Trip Charge I ca $25.00 $25.00 01-11-96 Concrele Mix h~spcction, Regular lime tale 7.75 hrs $29.75 $230.56 01-11-96 Concrete Mix Inspection, Over time rate 1.5 hrs $60.24 (before 7:30 am, after 5:00 Ira0 $40.16 GEE Consultants, Inc. Invoice No. 05258-5 Natgun Corporation Page 2 of 3 Date.of '~ 4~ Sampling D, :il~tion Quantity '.Ate Total 01-11-96 Concrete Cylinders 9 ca $13.00 $117.00 01-11-96 Cylinder Molds for Field llold Cylinders 10 ca $1.00 $10.00 Ol-11-96 Trip Charge I ca $25.00 $25.00 (11-12-96 Concrete Mix Insltcction, P, cgular time rate 7.75 hrs $29.75 $230.56 01-12-96 Concrete Mix Inspection, Over lime rate 0.5 hrs $40.16 $20.08 (before 7:30 am, after 5:00 pro) 01-12-96 Concrete Cylinders 9 ea $13.00 $117.00 111-12-96 Cylinder Molds for Field liold Cylinders 10 ea $1.00 $10.00 01-12-96 Trip Charge ! ca $25.00 $25.00 01-15-96 Concrete Mix Inspection, Regular time I'ale 7.75 hrs $29.75 $230.56 (}1-15-96 Concrclc Mix Inspection, Over lime ralc 1.0 hrs $40.16 $40.16 (before 7:30 am, aftcr 5:00 pro) 111-15-96 Concrele Cylinders 9 ca $13.00 $117.00 111-15-96 Cylinder 1Vh~lds for Field llold Cylinders 10 ca $1.00 $10.00 1}1-15-96 'l'l'il~ Charge I ca $25.00 $25.00 111-16-96 Concrete Mix Inspection, Regular time tale 8.25 hrs $29.75 $245.44 (}1-16-96 Concrete Cylinders 8 ea $13.00 $104.00 01-16-96 Cylinder Molds for Field Ilold Cylinders 8 ea $1.00 $8.00 01-16-96 Trip Charge Iea $25.00 $25.00 lqease l'ay $4,852.26 (;EE Consullanls, Inc. Inw~ice No. 05258-5 Natgun Corporation Page 3 of 3 G EO'IECtlNICAL E GEE Consultants, Inc. ENVIRONMI2NI'AL 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 * Fax (214) 352-6972 IIIVVOICE l To: Mr. Bob Barbarisi, Jr. Invoice No.: 5258-6 Natgun Corporation litvoice Dale: February 29, 1996 Eleven Teal Road Wakefield, MA 01880-1292 Prqiect: Field and Laboratory Testing l~erformed February, 1996 6.0 MG Ground Water SIorage Tank -' Coppell, Texas Terms: Due Upon Receipt Date of Sampling Descriplim~ Quartlily Rate Total 01-04-96 Rcbar hmpcclion. Overlime talc (bcli>rc 7:30 0.5 hrs $40.16 $20.08 am, al'lcr 5:00 01-11-96 Rebar hispcclion, Over lime rate (alier 5:00 0.25 hrs $40.16 $10.04 pro) (}2-14-96 Pick Up Shotcrete Test Panel, Regular time 2.0 hrs $29.75 $59.50 rate 02-14-96 Tril~ Charge Iea $12.50 $12.50 (}2-21-96 Concrete Mix lnsl~cclion Canccllalion, 1.5 hrs $29.75 $44.63 Rcguhir lime talc 02-21-96 Concrelc Cylinders 9 ea $13.00 $117.00 02-21-96 Trip Charge I ca $12.50 $12.50 l'iease l'ay $276.25 G EOTECHN ICAL E NGINEERING E NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 · Fax (214) 352-6972 TO: Contincntal Casualty Company, Inc. % Douglas G. Hotchkiss Insurance Agency One Bent Tree Tower 16475 Dallas North Parkway #220 Dallas, Texas 75248 CERTIFIED MAIL RETURN RECEIPT REQUESTED AND Natgun Corporation Eleven Teal Road _Wakefield. Massachusetts 01880 CERTIFIED MAIL REFURN RECEIPT REQUESTED RE: 6.0 MG Water Storage Tank, Coppell, Texas We notify both of you that GEE Consultants, Inc. has a claim in the sum of Seven Thousand Two Hundred Fifteen and 95/100 Dollars ($7,215.95) for labor performed and/or materials delivered during the n~onth(s) of September, October, November, December, 1995, January and February, 1996 on the referenced project. The labor performed and/or materials furnished by t|s are generally described as follows: Field and Laboratory Testing and Inspection of Construction Materials. Such labor performed and/or materials were furnished to Natgun Corporation pursuant to the terms of an oral agreement with Natgun Corporation. Attached hereto is our Sworn Statement of Account. This notice is sent in compliance with the McGregor Act, Article 51.60 of the Revised Civil Statutes of Texas. Dated tiffs 4 day of June, 1996. GEE Consultants, Inc. By: Richard W. Gee, P.E., President G EOTECI INICAL E NGINEERING E NVIRONMENi^L 10046 Monroe Drive Dallas, Texas 75229 GEE Consultants, Inc. · (214) 352-5433 * Fax (214) 352-6972 TO: NOTICE OF UNPAID BILLS CNA Bond Department 600 N. Pearl SU'cct Dallas, TX 75201 CERTIFIED MAlL I~,ETURN I~.ECEIFq' REQUESTED AND Natgun Corporation Eleven Teal Road Wakcficld, Massachusetts () 1880 CERTIFIED MAIL I([LTU!~.N RECEII'T REQUESTED RE: 6.0 MG Water Storage Tank, Coppcll, Texas We notify bolh of you that GEE Consullanls, Inc. has a claim in the sum of Seven Thousand Two thmdred Fifteen aml 95/100 I)ollars ($7,215.95) l~r labor performed and/or materials delivered during Ihc mimlh(s) of September, October, November, December, 1995, January and February, 1996 on ihc referenced projoel. The lal~or performed and/or materials furnished by us are generally described as liftlows: Field and Laboratory Testing and Inspection of Construction Materials. Such labor performed and/or materials were furnishcd to Natgun C{n potation pursuant to Ihe letins of an oral agreement with Natgun Corporation. Allached hereto is our Sworn Slalement of Account. This nolicc is sent in coml~liancc with the McGregor Act, Article 5160 of the Reviscd Civil Stalules of Texas. Dated this 15 day of ~July, 1996. GEE Consultants, Inc. ~, (,- l~,y: t',,Y',:~' "b : ~ Richard W. Gee, P.E., President