Loading...
WA9302-CS 960805 2143610204 ~8/0~/1996 13:34 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 DOUGLAS AVENUE, #820 DALLAS, TEXAS 75225 Fax Number: (214) 361-0204 Date: August 5, 1996 Time: 1:22 PM Phone Number: (214) 361-7900 Receiving Fax Number: ( ) 304-3570 Number of Pages Transmitted (including this one) 2 Mr. Larry Davis C,,D Re: Village Parkway Entry Gate Modifications Message: T) Following is a preliminary layout of the revisei:l entry gate modifications. Please review and comment. If this is what you were looking for, we will for~Tard a copy to NTMC fc/r their 'consideration. From: Gary C. Hendricks If the number of pages called for are not received or are not clear please call (214) 361-7900. 88/~/i99g o~to5198 13:34 214361~28~ SHIMEK JA~C,O, BS&FINKLE NATGUN PAGE B3/B3 ~oox Natgun Corporation Eleven Teal Rosa W0kefield, MA 01880-1292 FAX Date: August 5, 1996 Nttml:er of pages inchdrag cover sheet: To: Gary Hendricks SHIMEK, JACOBS & FINKLEA 6.0 MG WATER STORAGE TANK COPPELL, TEXAS From: Robert V. Barbarisi, Jr. Proje~ M~nager Phone: Ftx pho~: CC: 214-361-7~00 214-361-020a Phone: (6 17) 224-5 Fax plion_~: (617) 224-5153 REMARKS: [~ Urgent ~ For your review [] Reply ASAP [] Please comment De~r Oaz'y, This letter confirms our telephone conversation today regarding application of Thorocoat at temperatures in excess of the specification, namely 90 degrees Fahrenheit. As indicated i, Harris Specialty Chemical, Inc. 's letter of July lg, 199~;, we have successfully applied the product on past projects at temperatures above 90 degrees. Our personnel have extensiv~ expermnce {n applyfag Thoroseal and Thorocoat and rely on that experience as well as sound judgment in determ ining the suitability of conditions necessary to properly apply the product. Aside from temperature, various other factors such as relative humidity, wind speed and ~unlight, alSO impact the application process. Ultimately, our supe~,isor will evaluate the combination of these factors prior to proceeding with the work. Furthermore, during the application process, should conditions change in a manner that would be derrimentaJ to the finished product, the operation will be suspended, As requested, we will awaiy your pproval prior to proceeding with this phase of the work. Kindly call me should /