Loading...
Freeport NIP(2.5)-CS 971202 G P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 December 2, 1997 Richard L. Crow Myers & Crow Company Ltd. 3811 Turtle Creek Blvd., Suite 730 Dallas, TX 75219 RE: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center) Development Fee Assessment (Revised) Dear Mr. Acker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $43,770.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~. Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TA Project: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center) Date: 12/2/97 (Revised) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $391.96 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) .. , $6,235.58 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100 % due prior to Council Approval) Roadway Impact Fee $24,645.00 $24,645.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $51,062.54 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $43~770.00 DEVELOPMENT FEE WORKSH PROJECT: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center) DATE: 12/2/97 (Revised) Water Impact Fee: Domestic Meter(s): 2 - 2 inch 16 ESU's Irrigation Meter(s): 1 - 2 inch 8 ESU's Fireline Meter(s): I - 8 inch 2.5 ESU's Fireline Meter(s): I - 10 inch 0 ESU's Total 8: 26.5 ESU's @ $450.00 ea. $11,925.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 8: 6 Connections @ $50.00 ea. $300.00 (Single family due prior to issuance of building permit) (All other developments due prier to issuance of meter) Water Meter Fee (Domestic): Total 8: 2 Domestic Meter(s) @ $195.98 $391.96 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (/rrigation/Fireline): Total 8: 1 Irrigation Meter(s) @ $195.98 $195.98 Total 8: I Fireline Meter(s) @ $2,459.10 $2,459.10 Total 8: I Fireline Meter(s) @ $3,580.50 $3,580.50 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total 8: 2 Meter(s) @ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s} @ $35.00 ea. $105.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 16 @ $450.00 ea. $7,200.00 Wastewater Tap Inspection Fee: Total 8: 2 Connections @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 8: 2 Lots @ $50.00 ea. $100.00 {100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $24,645.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this dine (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) {4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center) DATE: 12/2/97 (Revised) ROADWAY IMPACT Service Area * 4 Category ** Industrial Land Use ** General Lighht ~ndnswial Building Size (Sq. Ft.) 310,000 Development Units ** 310 Vehicle Miles Per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due -- (Development Units) x (Vehicle Miles Per Development Uni0 x (Fee per Vehicle Mile) = $98,580.00 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) 75 % Credit as per approval by City Manager = $73,935.00