Freeport NIP(2.5)-CS 971202 G P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
December 2, 1997
Richard L. Crow
Myers & Crow Company Ltd.
3811 Turtle Creek Blvd., Suite 730
Dallas, TX 75219
RE: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center)
Development Fee Assessment (Revised)
Dear Mr. Acker:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $43,770.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ~.
Director of Engineering & Public Works
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TA
Project: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center)
Date: 12/2/97 (Revised)
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $11,925.00 $11,925.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $391.96
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) .. , $6,235.58
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $60.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $105.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $7,200.00 $7,200.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100 % due prior to Council Approval)
Roadway Impact Fee $24,645.00 $24,645.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $51,062.54
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $43~770.00
DEVELOPMENT FEE WORKSH
PROJECT: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center)
DATE: 12/2/97 (Revised)
Water Impact Fee:
Domestic Meter(s): 2 - 2 inch 16 ESU's
Irrigation Meter(s): 1 - 2 inch 8 ESU's
Fireline Meter(s): I - 8 inch 2.5 ESU's
Fireline Meter(s): I - 10 inch 0 ESU's
Total 8: 26.5 ESU's @ $450.00 ea. $11,925.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 8: 6 Connections @ $50.00 ea. $300.00
(Single family due prior to issuance of building permit)
(All other developments due prier to issuance of meter)
Water Meter Fee (Domestic):
Total 8: 2 Domestic Meter(s) @ $195.98 $391.96
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (/rrigation/Fireline):
Total 8: 1 Irrigation Meter(s) @ $195.98 $195.98
Total 8: I Fireline Meter(s) @ $2,459.10 $2,459.10
Total 8: I Fireline Meter(s) @ $3,580.50 $3,580.50
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total 8: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s} @ $35.00 ea. $105.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 16 @ $450.00 ea. $7,200.00
Wastewater Tap Inspection Fee:
Total 8: 2 Connections @ $50.00 ea. $100.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 8: 2 Lots @ $50.00 ea. $100.00
{100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $24,645.00
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this dine
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
{4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center)
DATE: 12/2/97 (Revised)
ROADWAY IMPACT
Service Area * 4
Category ** Industrial
Land Use ** General Lighht ~ndnswial
Building Size (Sq. Ft.) 310,000
Development Units **
310
Vehicle Miles Per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due -- (Development Units) x
(Vehicle Miles Per Development Uni0 x (Fee per Vehicle Mile) = $98,580.00
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
75 % Credit as per approval by City Manager = $73,935.00