Loading...
Freeport NIP(2.5)-CS000307 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Project File From: Lar~, Construction Inspector Date: March 7, 2000 RE: Freeport North, Lots 1 and 2, Block 2 Northpoint Business Center On September 1, 1998, a Final Walk-thru was initiated on this project. There were items that needed to be addressed before a Final Acceptance Letter could be processed. Public Works was not contacted for a follow-up walk-thru before the Certificate of Occupancy was issued by Building Inspections. The required Maintenance Bond(s) and Record Drawings (As-builts) have been received and approved, but no Final Walk-thru ever completed for Final Acceptance. The property is now occupied. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"