Freeport NIP(2.5)-CS000307 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Project File
From: Lar~, Construction Inspector
Date: March 7, 2000
RE: Freeport North, Lots 1 and 2, Block 2
Northpoint Business Center
On September 1, 1998, a Final Walk-thru was initiated on this project. There were
items that needed to be addressed before a Final Acceptance Letter could be
processed. Public Works was not contacted for a follow-up walk-thru before the
Certificate of Occupancy was issued by Building Inspections.
The required Maintenance Bond(s) and Record Drawings (As-builts) have been
received and approved, but no Final Walk-thru ever completed for Final Acceptance.
The property is now occupied.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"