Loading...
WA9302-CS 96080708/07/96 619 245 5299 NATGUN CORP- 001 gNPRECAST PRES FRESSED PREFERRED 'lZsral,lisht~J Iq?9 " Natgun Corporation Precast Concrete Tanks Eleven Teal Road Wakefield, MA 01880-1223 Telephone 617-246-1133 Fax 617-245-3279 ***FAX TRANSMITTAL*** DATE; TO: August 07, 1996 (Re-faxed) City of Coppell 255 Parkway Blvd. Box 478 Coppell, TX 75019-4409 A~wI~M: Mr. Larry Davis, Construction Supervisor 6.0 MG Water Storage Tank Coppell, Texas FAX: 214-304-3673 TELE.: 214-304-3684 FACSIMILE DESCRIPTION 1 Periodic Estimate for Partial Payment Number 11 Please contact me, or Bob Barbarisi, at your earliest convenience with your approval. Marie Greelish, Project Coordinator NO. OF PAGES: q COPY TO: Gary Mendticks FAX: 214-361-0204 SOUTaw~.sv O~mcn: Suite 811, 8111 Preston Road, Dallas, TX 752Z5-6316, Telephone 214-368-3306 MxDWI~S-r OlqqCE: Suite 211, 2610 Sheridan Road. Zion, IL 60099-26 l 5, ]'el~phone 708-872-8806 MIu-ATL.~Nvm O~nct: Suite 100, 3650 Winding Way, NewtDwn Square, PA 19073, Talephone 610-3534315 CONTRACTOR'S PERIODIC ESTIMATE FOR PARTIAL PAYMENT ESTIMATE NUMBER 11 ENGINEER: Shimek Jacobs s Flnklea PROJECT: 833 0ouglas Avenue, #82e Eellee, TX ?5225 ESTIMATE CON~CTOR: Natgun Corporation PERIOD: PosZ Office Box 4771 Boston, NA 02212-4771 6.0 Me Water Storage Tank Coppoll, Texas FROM: June 1, 1996 TO: June 30, 1996 COWERACT TEaM'S: ANO;: $ 2,809,305.00 ITEM UNIT SCHEDULED FROM PREV. COMPLETED % BALANCE TO NO. DESCRIPTION OF ~ORK QTY PRICE VALUE APPLICATION THIS PERIOD TO DATE TO DATE FI~ISH la. Erosion ~ Sedimentation Control LS 5,175.00 5,175.00 O.00 5,1~5.00 1G0% 0.00 ~b. Temporary Access Road LS 19,200.00 19,200.00 0.00 19,200.00 Z00% 0.~0 lc. S~te Work (Earth~ork) LS 56,600.00 56,600.00 0.00 56,600.00 i00i 0.0O ld. DrilLed Piers LS 40~,080.0~ 400,000.0~ 0.90 400,800.00 1~0% ~.~ le. Electric & Telemeter~ng LS 47,300.00 23,650.00 23~65~.00 47,300.00 100% If. Sidewalk, Splash ~ad, S Flume LS 16,~D0.00 4,025.~0 O.00 4,025.00 2S% 12,~75.0n lg. e~ping (Overflow Line & Drain L~ne} LS 29,800.00 29,800-00 0.OO 29,800.00 100% 0. lh. Gravel Underlain LS 3,400.00 1,400.0~ 0.00 1,400.00 ~0% 0.0~ li. Perimeter Underdrain LS 9,200.00 9,200.00 0.00 9,200.00 100% lj. Engineering Design CaJculat~ons & Job Se~ Up LS 125,000.00 125,00~.00 O.00 ]25~00~.00 100% 0.Q0 lk. Footin9 S Floor CompZete with Piping LS 313,0~0.00 313,000.00 0.00 313,000.0~ i00% 0.00 I1. Cast Wall Panels LS 262,0~0.00 262,0~0.00 0.0~ 262,000.00 100% 0.00 Zm. Cast Dome Panels LS 225,000.00 225,000.00 ~.00 225,000.~0 1Q9% 0.~0 ln. Erect Dc~e Shoring ~ Forms LS ~50,000.00 150,000o00 ~.00 150,000.00 100% 0.00 lo. Erect Wall P~neZs LS 227,000.00 227,00~.00 0.00 227,000.Q~ 1~0% SCHEDULE OF COMPLETED WORK WORK COMPLETED TOTAL ITEM UNIT SCHEDULED FROM PREV. COMPLETED % ~ALANCE TO ~. D~SCRIPTION OF WORK QTY PRICE VAL~E APPLICATION ~IS PERIOD ~ DATE TO DATE FINISH TANK lp. Erect Dome Panels LS 148,~00.00' 148,000.00 0.00 148,030.00 100% O. lq. Form and Pour Wall Slots LS 60,000,00 60,000,00 0.00 60,000.00 100% 0.00 lr. Form, Reinforce and Pour Dome 0.00 Ring and Dome Slots LS 50,000.00 50,O0O.00 0.00 50,000.00 100% 0.00 ls. Core Wall Shotcrete LS 60,000.00 60,000.00 0.00 60,000-00 100% 0.00 It. Wirewinding LS 110,000.00 lID,Q00.00 0.00 ll0,0OO.00 10O% 0.00 lu. Covercoat LS 70,000.00 70,000.00 0.00 70,000.00 100% O,00 lv. Strip & Remove Shoring & Forms LB 60,000.00 ~O,000.0O 0.00 60,000.00 100% 0.00 lw. Hatch, Vent & Overflow LS 15,875.00 15,875,00 0.00 15,875.00 100% 0.00 Ix. Wall Manhole LS 7,000,00 7,000.00 0.00 ?,O00.00 100% O.O0 ly. Ladders ~ Handrails LS 20,188.00 19,178.60 505.64 19,784.24 98% 403.76 lz. Pilasters LB 38,000.00 38,000.00 Sub TOtal 2,525,838.002,489,1~3.50 2 3 4 5 6 7 8 9 10 11 12. 13, 14. 36" RCCP Pipe 590 236-00 LF 139,240,00 139,240.00 36" Butterfly Valves 3 12,880.00 EA 38,640.00 38,640.00 36" Connections 3 5,175.00 EA 15,525.00 15,525.00 Tank Architectural Finish 1 60,81~.00 LS 60,815.00 40,137.90 Modify Existing Ladder 1 2,5t0.00 LS 2,520.00 2,520.80 Trench Safety 590 4.60 LF 2,714.00 2,714.00 Bite Irrigation I 10,665.00 LS 10,665.00 533.25 Oak Trees 17 219.00 EA 3,723.00 0.00 Coral Moneysuckle 50 14.40 EA 720.00 O.00 Bermuda Grass 45,000 0.05 SF 2,250.00 0.00 Bermuda Grass Sod 2,210 2,70 fly 5,967.00 O,0O Remove Trees 4 57.00 ~A 228,00 0.00 Relocate Cedar Elm Trees 4 115.00 EA 460,00 0.00 Sub TOtal 283,467.00 239,310.15 0.00 38,O00.00 100% D.00 24,255.64 2,513,359.24 12,478.76 0.00 139,240.00 590 LF 0.0O O.0O 38,640.00 3 EA 0.O0 D-00 15,525.00 3 EA 0.0" 0.00 40,137.90 56% 20,677,: 0.00 2,520.00 100% O.OV 0.00 2,714.00 590 LF 0.C 0.00 533.25 5% 10,]31.7_ 0.00 0.00 0 EA 3,723.00 0.00 0.00 0 EA 720.00 0.00 0.00 0 SF 2,250.00 0.00 0.00 0 BY 5,967.00 0.00 0.~0 0 EA 22B.00 0.00 0.00 0 EA 460.00 0.00 239,310.15 44,156.85 TOTAL ORIGINAL CONTACT 2,809,305.002,728,413.75 24,255.64 2,752,669.39 56,635.61 CH,,M',TGE ORDERS TOTAL CONTRACT 2,809,305.002,72B,4~3.75 24,255.64 2,752,669.39 56,535.r' We Certify That This Estimate Is Correct NATG"JN CORPO ON We Have Checked This Estimate & Approve Payment BY: ORIGINAL CONTRACT SUM: Net Change by Cha~ge Orders: CONTRACT SUM TO DATE: TOTAL COMPTaETED TOOATE: 3% RETAINAGE: TOTAL EARNED LESS RETAISAGE: LESS PREVIOUS BILLINGS: CU~REFr PAYMENT BALANCE TO FINISH INCLLIDII~G RBTAINAGE: 2,B09,305.00 O.O0 2,B09,305.00 2,752,659.39 82,580.08 2,570,089.31 2,646,561.34 23,527.97 139,215.69