Kimbel Addition-CS000517 ,MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Lanny Allison, Construction Inspector
Garreth Campbell, Construction Inspector
Larry Davis, Construction Inspector
.-_
From: Debi Ingram, Engineering Secretary ~
Date: May 17, 2000
RE: Expiring Maintenance Bond(s)
The following Maintenance Bond(s) svill expire as follows.
Diamond Shamrock 7/15/00 (Larry. Davis)
Please re-inspect the above mentioned project(s) to see that the public improvements
for this project are in satisfactory condition.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"