Loading...
Freeport NIP(6)-CS 980825To.' From: RE: Date: MI~MORANDUM Mike Martin, Asst. City Engineer Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Larry D~~ction Inspector WALK-THRU for MEPC Phase 4 (Royal Lane at Northpoint Drive) August 25, 1998 A walk-thru for streets, utilities and drainage on the referenced project scheduled for Friday, August 28, 1998 at 9:30 a.m. If I can be of further assistance please let me know. bL~n file/ldavis/Owalkthru~ mm