Loading...
ST9801-SY 981105l-I* Conceptual Design Report The City With A Beautiful Future Paving Ar,iMgeafld6✓ater 11fle / r o vc °in c °� t r fo r <oppc° / //load October igg8 fabmittedby Freese and Nichols, Inc. A C E N T U R Y O F S E R V I C E November 5, 1998 FREEIE-NICHOLI Kenneth M. Grit'tin, P.E. City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Coppell Road Paving, Drainage, and Water Line Improvements Conceptual Design Report Dear Ken: On October 26, Freese and Nichols submitted a draft of the ret~renced report. At that time many project issues were discussed. Some of the design parameters were agreed to be changed during this discussion. Those changes include changing the pavement width to 38' b-b, adjusting the northem portion of the alignment to utilize the 5'sidewalk and utility easement, and adjusting the so uthern portion of the alignment to accommodate the proposed bike trail. The section with the bike trail will have a 5 'parkway on the east side of the road and a 17' parkway on the west side. These exhibits in the report do not reflect these changes. The exhibits reflect our understanding of the project at the completion of the conceptual design phase. A revised alignment will be presented to the City at a design review meeting on November 5, 1998. Sincerely, FREESE & NICHOLS, INC. Tricia H. Hatley, P.E. Freese and Nichols, Inc. · Engineers · Environmental Scientists · Architects 1341 W. Mockingbird Lane · Suite 230E · Dallas, Texas · 75247 214-920-2500 · Fax 214-920-2565 Conceptual Design Report Paving, Drainage and Water Line Improvements for Coppell Road October 1998 Prepared by Freese and Nichols 1341 W. Mockingbird Lane Suite 230-E Dallas, TX 75247 This report was prepared by Tricia H. Hatley, P.E., Texas Registration No. 83282 and was intended for City review only. This document was not intended for the purposes of bidding, permitting or construction activities. ~ ~4~~~/ Conceptual Design Report Paving, Drainage and Water Line Improvements for Coppell Road October 1998 Prepared by Freese and Nichols 1341 W. Mockingbird Lane Suite 230-E Dallas, TX 75247 t This report was prepared by Tricia H. Hatley, P.] intended for City review only. This document permitting or construction activities. Texas Registration No. 83282 and was intended for the purposes of bidding, r- Table of Contents A - Description of Project 1. Vicinity Map 2. Existing Conditions B - Project Constraints 1. Identification Map C - Pavement Section 1. Typical Section D - Roadway Alignment 1. Horizomal 2. 90 Degree Bend 3. Right-of-Way Maps E - Drainage 1. Drainage Area Map and Calculations 2. Culvert Crossings 3. Proposed Systems F - Utilities 1. Waterline Alignment G - Cost Estimates Attachmems Geotechnical Report Freese and Nichols, Inc. CPL98447 October 1998 r" A- Description of Project Coppell Road runs north-south between Sandy Lake Road and the Mansion by the Lake subdivision and then turns 90-degrees to the west and intersects Highway 121. The road is currently a two-lane asphalt section and is classified as a 2U collector. The project includes paving and drainage improvements for Coppell Road from the intersection at Sandy Lake Road to the intersection at Highway 121. Also included in the project is a 12" waterline that will connect the existing 12" line in the Highway 121 frontage road and the 10" line which terminates at the 90-degree bend in Coppell Road. The north-south section of the roadway is bordered by the Mansion by the Lake, Village at Cottonwood Creek and Asbury Manor housing subdivisions on the east. The west side of the roadway has a few homes on the southern section and the Brazos Electric Power Coop at the intersection at Sandy Lake. The northern portion of the west side of the roadway is undeveloped pasture land (as shown in photo above). The north side of the east-west portion of Coppell Road is currently occupied by a mobile home park (as shown in photo at left). The photo also shows the south side which has a facility for GTE currently under construction. Exhibit A-1 is an aerial photo of the project area. The exhibit does not reflect most of the previously described developments because they are fairly recent. Freese and Nichols, Inc. CPL98447 October 1998 ~ I[ .... ! PROJECT I ( NORTH FI~EESE '"' NK:::HOLS 114.1 W. ~ L.N..SLITE 230 ir ~ IX 7524.7 214e920-25QO CITY OF COPPELL,. TEXAS PAVEMENT, WATER & DRAINAGE IMPROVEMENTS FOR COPPELL ROAD VICINITY MAP F&N JOB NO. CPL98.4.47 FILE VINCINITYMAP.DWG DATE ,0/2,/9, A' 1 0RAWN BY 1'1-1H DF:.SIGNE0 BY CAJ RL"VIL'WE:0 BYTHH FIGURE: FREESE - NICHOLS i j,_,__. . B - Pro)ect Constraints The horizontal and vertical alignment of Coppell Road will be determined by several existing conditions that impose constraints upon the project. These constraints include drainage concerns, physical objects which impede the alignment, awkward intersections and right -of -way limitations. Several of the controlling aspects of the project occur at the point where the roadway makes a 90- degree bend. The current curve will not meet minimum standards for horizontal curves as recommended by AASHTO and the City's own standards. A Brazos transmission tower prevents an alignment that would meet the standards for horizontal curves and require minimal right -of -way take and shown in photo above. The 90- degree bend has two other design challenges. One of those is the drive connection from the housing project on the east side of the roadway (as shown in photo below).The drive has recently been constructed right at the turn and has a fairly steep grade coming off the roadway into the housing addition. Both the grade and location of the drive will be key factors in choosing an alignment for the improved Coppell Road Freese and Nichols, Inc. October 1998 CPL98447 2 . The 90- degree bend and the power pole are noted on Exhibit B -1 To add to the complexity of this area, the 90- degree bend also has a drainage pipe crossing. The existing pipe is a 96" diameter RCP and is undersized for the ultimate developed conditions. The drainage considerations will be addressed in detail in a later section, but the pipe will require modifications and extension based on the chosen alignment. There are several other potential design constraints including an inconsistent right - of -way dedication along the north -south portion of the roadway. The intersection of Sandy Lake Road at the southern end of the project and the intersection of Highway 121 at the north end of the project will require careful consideration and coordination. The final project constraint identified on Exhibit B -1 is the drainage crossing at the Village at Cottonwood Creek addition (as shown in photo at right). This is currently a 36" RCP, but as will be discussed in a later section, needs to be up -sized to a 3 -8x6 box culvert. This will be a consideration in the layout of the vertical alignment for the roadway. Freese and Nichols, Inc. October 1998 CPL98447 3 ~ FREiESE - NIC~HC)LS ! The existing pavement section consists of a 1" crashed stone base with 2.5" of asphalt pavement as shown in detail in the boring logs included in the geotechnical report prepared by Rone Engineers. The report is included in the attachments to this documem. The existing pavement ranges from approximately 21 to 25 feet wide with a variable width fight-of-way. The classification as a 2U Collector requires that the section be improved to a miniram width of 33 feet with a 55-foot wide fight-of-way. At the City's direction, we have prepared the conceptual plans to reflect a 41-foot wide paving section as shown in Exhibit C-1. This section allows for two lanes of travel and a parking lane on each side. The fight-of-way width will vary but will not be less than 60 feet in accordance with the Subdivision Ordinance. The section will be constructed on a 6" lime stabilized subgrade prepared per the City standard requirements. The paving will be 7" thick 3000 psi concrete reinforced with ~3 on 24" centers per the City standards. Freese and Nichols, Inc. CPL98447 4 October 1998 TYPICAL WID ~7~ I0' MIN. ~'0' 10' MIN. FREESE '* NICHOLS 7524.7 CITY OF COPPELL, TEXAS PAVEMENT, WATER &: DRAINAGE IMPRO~MENTS FOR COPPELL ROAD ~PICAL PAVEMENT SECTION D - Roadway AID nment With the exception of the 90- degree bend, the horizontal alignment follows the existing roadway very closely. The proposed horizontal alignment is shown in detail on Exhibit D -1. According to our survey information it appears that the Village at Cottonwood Creek Section V subdivision built their exterior brick wall out into the right -of -way. Since there is not sufficient right -of -way adjacent to the Village at Cottonwood Creek Section V subdivision, we have proposed an alignment that would keep the roadway straight almost in its current configuration. This alignment will work with the Asbury Manor and Mansions by the Lake property lines and - _ - will not require demolition of s the brick wall surrounding the - _ - Village at Cottonwood Creek. If the alignment was adjusted to #� provide just a 10 parkway _ - s adjacent to the Village at -- - Cottonwood Creek Sections IV and VI, it may also constrict the channel coming from the 3- 8x6 box culverts. The current alignment is closer to providing 1 the channel required as r described b the "Ci Y -Wide Y 11- � Storm Water Management Study." This report presents three options for the 90- degree bend shown in detail as Exhibits D -2. We have looked at numerous other options, but the existing constraints have limited the project to the three presented here. Exhibit D -2a is our recommended option. This option is designed for 25 mph with a superelevation rate of 0.04. This is a cross slope of 4 %. The road will clear the power pole by 10 feet and will require minimal additional right -of -way take on the north side of the roadway. The driveway into the Mansions by the Lake and the storm drain pipe will need to be extended as shown in the exhibit. Option 2 for the 90- degree bend is still at 25 mph but does not have superelevation. This requires a 200 -foot radius to be used as shown on Exhibit D -2b. The larger radius will require more right -of -way take on the north side as the curve swings out to clear the power pole. Freese and Nichols, Inc. October 1998 CPL98447 5 The final option presented is for a T-intersection. This option is shown on Exhibit D-2c and would require major work to the driveway into the Mansion by the Lake subdivision. The drive would be offset from the main road it serves. This option requires no storm drain extension. The options we considered included using a 35 mph design speed and pulling the curve inside of the power pole. The 35 mph design speed caused the roadway to swing out to the north considerably farther than the other options presented here. Pulling the curve inside of the power pole will not work with the GTE development plans. While superelevation may not be ideal, we are recommending it because of all constraints that exist on this project. The right-of-way required for the project, including the recommended option for the 90- degree bend, is shown on Exhibit D-3. Freese and Nichols, Inc. CPL98447 6 October 1998 "'l iNNINgill r' , 1 .... / / TRUS o ' ' 1"=1 O' ' 1835 ~. ~ ~ -~ ~---.~ . / ~ . ....... ., / ~ ~, , ...... '-., / ~ .... / . ~ Z ~ ~ '~ ~ Z 0 ~ ~ 0 0 D-lB FI6URE 4 '" 200' . 0 J J W a_ O U O H Z W W z W Lv 3 I-- O J Q J CL Q W :2 r- Q. O O 0 ►v w U Q r LL- Z O V) O < _ I_- Ln Q U z O Q a Q a w w .._. _........ IW • W iR L�i i , D -1C FIGURE 1 7) MATCH SHEET D- 1 C G') r' L, I" I i ,.j ............ ,,, ; / ,,, / / F .... / / / i / ............., [ I / ........ / OPTION 1 DESIGN VELOCITY' (MPH) = 25 RADIUS (F'L ) = 155 e VALUE = +.04 1045 DRIVE PAVEMENT AREA (SF..) = EXTENSION OF EX. 96"~ SD PIPE (LF.) = 25 PROP. 66"~ SD PIPE (LF.) = 220 i 0 50' 100' 200' 1"=100' FREESE '* NICI-KLS II CITY OF COPPELL, TEXAS PAVEMENT, WATER & DRAINAGE IMPROVEMENTS FOR COPPELL ROAD 90° BEND ALIGNMENT F&:N JOB NO. CPL98447 FILE OP'I1ON1.DWG DATE DRAWN BY ,o/./. D-2o DESIGNED BY CAJ RE'EWE0 BY THH FIGURE · ' l' T II r ~ i i ,/ .....7 ,,,' / i I OPTION 2 DESIGN VELOCITY (MPH) = 25 RADIUS (FT.)= 2O0 e VALUE = -.02 DRIVE PAVEMENT AREA (SF.) - 955 EXTENSION OF EX. 96"~ SO ~PE (LI-.) = 15 PROP. 66"rb PIPE (LF.) = 230 . 50' 100' 200' CITY OF COPPELL, TEXAS PAVEMENT, WATER & DRAINAGE IMPROVEMENTS FOR COPPELL ROAD FREESE "' NICHOLS 90' BEND ALIGNMENT F&N JOEl NO. CPL98447 FILE OPTION 2.DWG DATE 10/26/98 DRAWN BY DESIGNED BY CAJ THH D-2b RGURE j DES/~'N VELOCITY (MPH) = NA (T-INTERSECTION) RADIUS (FT.) = NA e VALUE = NA DRIVE PAVEMENT AREA (SF.) 955 EXTENSION OF EX. 96"~ SD t;IPE (LF.) = NA PROP. 66'?~ SD PIPE (LF.) = 210 0 50' 100' 200' 1 "= 100' FREI=~ e NICHOI,S I I CITY OF COPPELL, TEXAS PAVEMENT, WATER & DRAINAGE IMPROVEMENTS FOR COPPELL ROAD 90° BEND ALIGNMENT I F&:N JOB NO. CPL9844-7 RLE OPllON3.DWG DATE lo/2,/.. D - 2c DRAWN BY DESIGNED BY CAJ REVIEWED BY THH FIGURE ~,~ 00 4 �7- AGMMW � lmmmmm�- 0 50' 100' 200' 1 " =100' C" FF 0 In W 0 ry 0 LL Z < X Lu > 0 ry In CJL 0 0 < LL- z °< Q Z < S W Z n lo�. 0 * 2f Zs- Lulfi D-3A FIGURE 4 4 WILLIAM VOL. TO F. GALLEJO 8 0004 PC. TRUSTEE 1835 0 50' 100' 200' 1 " =100' I < - 'x o -7 < "'k � 0 0 J W n In O U ry O W I Z Q W X iE W W > ~ O ry J a- I W a - W w O , W U Q z 0 < 0 U_ 0 Q U z Q of W I- a f=1 z' W W Q I om 3 0 Lm rm � 8 A A b ?ag U) y Q M E r W a n i FIGURE 1 4 4 4 C) 0 0 MATCH SHEET D--SC 0 50' 100' 200' 1 "=100' Z X ''~ -- > 0 I::L ' 0 C.,.,9 C.) 4: I _ t-,, .~...~,:' 0 Z .. . z r , . I:L o' i. D-SD FIGURE II E - Drainage Drainage design for the project will be completed in accordance with the City of Dallas Drainage Design manual and the City of Coppell "City -Wide Storm Water Management Study." As discussed in the storm water study, the existing 96" diameter and 36" diameter storm drain pipes which cross under Coppell Road are undersized for fully developed conditions. The drainage area map shown on Exhibit E -1 reflects the basins for these two pipes. The 96" RCP can be paralleled with a 66" RCP to bring it up to the fully developed capacity. The storm water study indicates that the 36" RCP needs to be replaced with a 3 -8x6 culvert structure. At this time we are unable to confirm that the 3- 8x6 structure will carry the intended flow for our project. We have requested additional survey information to show the topography of the upstream and downstream channel. With this information and our proposed vertical alignment we will be able to determine the required size of the culvert. Also, as we progress into the preliminary design phase, we will present more information regarding the storm drain features at the intersection at Sandy Lake Road. Freese and Nichols, Inc. October 1998 CPL98447 7 (- e D~.,N POINT (~ DRNNAG( AREA NUMmm · --.--.P,-- DIRECT)ON OF RUNOFF · ---._~i~lS""~ EXISTING CONTOURS ~ PROPOSED CONTOURS 35 . 4 ocret from HWY 121 / // // \ I I DRAINAGE CALCULATIONS Design AREA AREA RUNOFF CA STORM Tc INTENSITY LO REMARKS Point (acre) COEF. ' FREQUENCY (rain) (in/hr) c s - FREESE .,, NICHOLS FA, N JOB NO. CITY OF COPPELL, TEXAS ~,~ PAVEMENT, WATER & DRAINAGE ,o/~,/,,.E- 1 IMPROVEMENTS FOR COPPELL ROAD OESIGNED BY C~ D RAI NAG EAR EA MAP F ) IR / FRESH - NICHOLS CITY OF COPPELL, TEXAS PAVEMENT, WATER & DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PROPOSED 96" RCP REHABILITATION FiN JOB NO, CPL98447 FILE CULVERT96.DWG DATE 10/26/98 ORAWN BY DESIGNED BY CAJ REVIEWED BY THH FIGURE j R / / / / I .~ / / / /, /,/ 'i - ·./ - / 15ox ~~e'KT FlOPP FREESE ° NICHOLS CITY OF COPPELL, TEXAS PAVEMENT, WATER & DRAINAGE IMPROVEMENTS FOR COPPELL ROAD PROPOSED 36" RCP REHABILITATION F&N JOB NO. CPL98447 FILE CULV[RT36.DWG 10/26/98 0RAWN BY 0E$1GNED BY CAJ REVIEWF'D BY THH E-2-,b FIGURI~ ~ m. ' I 'r II 'I I / ,,-J i I I '~ I I I "'1 0 50' 100' 200' Ob.,I ~"Z E-3a ~CU~ ,/ f I I I / V RcP R F MA' LIN Another part of the project is the connection of the existing 10" water line in the north-south portion of Coppell Road with the existing 12" waterline in the fight-of-way of Highway 121. The 12" waterline currently stops approximately 228 feet south of the intersection of Coppell Road and Highway 121. The proposed alignment is to bring the new 12" line on the south side of the widened Coppea Road as shown on Exhibit F-I. The work within the fight-of-way of Highway 121 will need to be constructed per TxDOT standards. Due to the tight schedule of the project, we have not been in contact with TxDOT as of the date of this report. Upon approval by the City of the proposed alignment, we will begin coordination with them. Franchise utility companies which may have lines in the project area have been contacted. These include GTE, Paragon Cable, Lone Star Gas, TU Electric, and Lone Star Pipeline Company. The Lone Star Pipeline Company has a 24" natural gas transmission pipeline which crosses Coppea Road approximately 750 feet to the north of the intersection of Sandy Lake Road. The pipeline is 4 to 6 feet below the existing roadway, but we will need to submit plans to Lone Star for approval of any grade changes over the pipeline. Freese and Nichols, Inc. CPL98447 8 October 1998 -- ~ " : . :-, FIGURE GTE SERVICES ENTER I I Freese and Nichols, Inc. CPL98447 9 October 1998 CITY OF COPPFI i COPPELL ROAD PAVING, WATER & DRAINAGE IMPROVEMENTS OPINION OF PROBABLE COST OF CONSTRUCTION Conceptual r)e~ig/t K~tirnate - Q~tion I DATE: 10/25/1998 PROJECT: Paving and Waterline Improvements for Coppell Rd. PREPARED: Chris Jones, E.I.T. REVIEWED: Tricia Hatley, P.E. Waterline Improvements 1 12' Water Main, including fittings and embedment 1,450 2 12' Gate Valve 5 3 12' To 10' Connection, includ. ing reducer and plug re 1 4 Remove 12' Plug and Connect 1 5 Trench Safety Program 1,450 6 Fire Hydrant Assembly 5 t:~=ostest,xls LF $50.00 $72,500 EA $1,500.00 $7,500 EA $3,000.00 $3,000 EA $2,000.00 $2,000 LF $1.00 $1,450 EA $2,000.00 $10.000 $96,450 I Paving Improvements 1 41' Wide 7' Concrete Paving 25,000 2 Concrete Curb 11,000 3 Lime Stabilized Subgrade 26,200 4 Intersection Reconstruction 2 5 Driveway Reconstruction 15 6 Earthwork- Cut 23,500 7 Earthwork- Borrow 2,000 8 Hydromulch Seeding 13,000 9 18' RCP Storm Drain 490 9 21' RCP Storm Drain 2,180 10 24" RCP Storm Drain 350 11 66' RCP Storm Drain 220 12 96' RCP Storm Drain 25 13 Connect SD to existing 6 13 Remove Existing Inlet 1 13 Grade Channel to Drain to Creek 600 14 Storm Drain Headwall or Outfall Structure 3 15 6' Curb Inlet 22 16 Trench Safety Program 3,020 17 Erosion and Traffic Control 1 18 3-8'x6' Box Culvert 90 19 TxDOT Headwalls for Culverts 2 20 Erosion Protection Upstream and Downstream Culve 2 21 Storm Drain Manholes 11 SY $26.50 LF $3.00 SY $3.00 EA $15,000.00 EA $`5,000.00 CY $3.00 CY $7.00 SY $1.00 LF $45.00 LF $`52.00 LF $60.00 LF $165.00 LF $240.00 EA $1,000.00. EA $2,000.00 LF $60.00 EA $2,500.00 EA $2,500.00 LF $1.00 LS $15,000.00 LF $600.00 EA $4,500.00 EA $4,500.00 EA $2,500.00 $662,500 $33,000 $78,600 $30,000 $75,000 $70,500 $14,000 $13,000 $22,050 $113,360 $21,000 $36 300 $6 000 $6 000 $2 000 $36 000 $7 500 $,55 000 $3 O20 $15 000 $54 ooo $9,000 $9,000 $1,299,830 Sub-Total Construction 20% Contingency Total Construction $1,396,280 $279,256 $1,675,536 Freese and Nichols, Inc. CITY OF COPPF! I COPPELL ROAD PAVING, WATER & DRAINAGE IMPROVEMENTS OPINION OF PROBABLE COST OF CONSTRUCTION Conce, ptnal Design F,~timate - Option 2 DATE: 10/25/1998 PROJECT: Paving and Waterline Improvements for Coppell Rd. PREPARED: Chris Jones, E.I.T. REVIEWED: Tricia Hatley, P.E. Waterline Improvements 1 12' water Main, including fittings and embedment 1,450 LF 2 12' Gate Valve 5 EA 3 12' To 10' Connection, including reducer and plug re 1 EA 4 Remove 12' Plug and Connect 1 EA 5 Trench Safety Program 1,450 LF 6 Fire Hydrant Assembly 5 EA $50.00 $1,500.00 $3,000.00 $2,000.00 $1.00 $2,000.00 Paving Improvements 1 41' Wide 7' Concrete Paving 25,000 SY 2 Concrete Curb 11,000 LF 3 Lime Stabilized Subgrade 26,200 SY 4 Intersection Reconstruction 2 EA 5 Driveway Reconstruction 15 EA 6 Earthwork - Cut 23,500 CY 7 Earthwork- Borrow 2,000 CY 8 Hydromulch Seeding 13,000 SY 9 18' RCP Storm Drain 490 LF 9 21 ' RCP Storm Drain 2,180 LF 10 24' RCP Storm Drain 350 LF 11 66' RCP Storm Drain 230 LF 12 96' RCP Storm Drain 15 LF 13 Connect SD to existing 6 EA 13 Remove Existing Inlet 1 EA 13 Grade Channel to Drain to Creek 600 LF 14 Storm Drain Headwall or Outfall Structure 3 EA 15 6' Curb Inlet 22 EA 16 Trench Safety Program 3,020 LF 17 Erosion and Traffic Control 1 LS 18 3-8'x6' Box Culvert 90 LF 19 TxDOT Headwalls for Culverts 2 EA 20 Erosion Protection Upstream and Downstream Culve 2 EA 21 Storm Drain Manholes 11 EA $26.50 $3.00 $3.00 $15,000.00 ,$5,000.00 $3.00 $7.00 $1 .oo $45.00 $52.00 $60.00 $165.o0 $240.00 $1 ,ooo.oo $2,000.00 $6o.oo $2,500.00 $2,500.00 $1 .oo $15,ooo.oo $600.00 $4,500.00 $4,500.00 $2,5oo.oo $72,500 $7,500 $3,000 $2,000 $1,45o $1 o.ooo $96,450 $662,500 $33,000 $78,600 $30,000 $75,000 . $70,500 $14,ooo $13,ooo $22,050 $113,36o $21,ooo $37,950 $3,600 $6,000 $2,000 $36,000 $7,500 $55,000 $3,020 $15,ooo $54,000 $9,000 $9,000 $1,299,o8o Sub-Total Construction 20% Contingency Total Construction $1,395,530 $279,106 $1,674,636 Freese and Nichols, Inc. CITY OF COPPFI I COPPELL ROAD PAVING, WATER & DRAINAGE IMPROVEMENTS OPINION OF PROBABLE COST OF CONSTRUCTION Conceptual F}e~igp K~timate - Option 3 DATE: 10/25/1998 PROJECT: Paving and Waterline Improvements for Coppell Rd. PREPARED: Chris Jones, E.I.T. REVIEWED: Tricia Hatley, P.E. Waterline Improvements I 12' Water Main, including fittings and embedment 1,450 LF 2 12' Gate Valve 5 EA 3 12' To 10' Connection, including reducer and plug re 1 EA 4 Remove 12' Plug and Connect 1 EA 5 Trench Safety Program 1,450 LF 6 Fire Hydrant Assembly 5 EA $50.00 $1,500.00 $3,000.00 $2,000.00 $1.00 $2.000.00 $72 500 $7 500 $3 000 $2 000 $1 450 $10 000 $96 450 Paving Improvements 1 41' Wide 7' Concrete Paving 25,000 SY 2 Concrete Curb 11,000 LF 3 Lime Stabilized Subgrade 26,200 SY 4 Intersection Reconstruction 2 EA 5 Driveway Reconstruction 15 EA 6 Earthwork- Cut 23,500 CY 7 Earthwork- Borrow 2,000 CY 8 Hydrornulch Seeding 13,000 SY 9 18" RCP Storm Drain 490 LF 9 21 · RCP Storm Drain 2,180 LF 10 24' RCP Storm Drain 350 LF 11 66" RCP Storm Drain 210 LF 12 96' RCP Storm Drain 0 LF 13 Connect SD to existing 6 EA 13 Remove Existing Inlet 1 EA 13 Grade Channel to Drain to Creek 600 LF 14 Storm Drain Headwall or Outfall Structure 3 EA 15 6' Curb Inlet 22 EA 16 Trench Safety Program 3,020 LF 17 Erosion and Traffic Control 1 LS 18 3-8'x6' Box Culvert 90 LF 19 TxDOT Headwalls for Culverts 2 EA 20 Erosion Protection Upstream and Downstream Culve 2 EA 21 Storm Drain Manholes 11 EA $26.50 $3.00 $3.00 $15,ooo.oo $5,000.00 $5.00 $7.00 $1 .oo $4,5.00 $52.00 $60.00 $165.00 $240.00 $1,000.00 $2,000.00 $60.00 $2,500.00 $2,500.00 $1 .oo $15,000.00 $600.00 $4,500.00 $4,500.00 $2,500.00 $662 500 $33 000 $78 600 $30 000 $75 000 $70 500 $14 000 $1S ooo $2~ 050 $113,360 $21,000 $34,650 $0 $6,000 $2,000 $36,000 $7,500 $55,000 $3,020 $15,000 $54,000 $9,000 $9,000 $1,292,180 Sub-Total Construction 20% Contingency Total Construction $1,388,630 $277,726 $1,666,356 Freese and Nichols, Inc. Attachment - Geotechn~cai Report Freese and Nichols, Inc. CPL98447 10 October 1998 ra FREESE • NICHOLS TO: City of Coppell P.O. Box 478 Coppell, TX 75019 -4409 ATTENTION: Kent Collins Simon W. Freese, P.E. 1900 -1990 Marvin C. Nichols, P.E. 1896 -1969 LETTER OF TRANSMITTAL DATE: November 11, 1999 PROJECT: CPL98447 3.1 We are sending you X Attached ❑ Under Separate Cover VIA the following items: ❑ Plans ❑ Specifications ❑ Shop Dwg. X Reports ❑ Diskette(s) ❑ Other COPIES I DESCRIPTION 1 1 Geotechnical Investi These are transmitted for your: X Use ❑ Review & Comment ❑ Response • Approval ❑ Distribution to Parties • Record ❑ Other Remarks: Im By: for: Kevin Yo g, E.I.T. FREESE AND NICHOLS • 1701 N. MARKET STREET, SUITE 500 LB 51 • DALLAS, TEXAS 75202 -2001 TELEPHONE: 214- 920 -2500 • FAX: 214 - 920 -2565 PROJECT NO. G8-4066-01 GEOTECHNICAL INVESTIGATION COPPELL ROAD IMPROVEMENTS COPPELL, TEXAS Presented To: FREESE AND NICHOLS c/o MR. CHRIS JONES 1341 WEST MOCKINGBIRD LANE SUITE 230-E DALLAS, TEXAS 75247-4922 OCTOBER 1998 TABLE OF CONTENTS Page 1.0 INTRODUCTION ........................................... 1 2.0 PURPOSES AND SCOPE OF STUDY ............................. 1 3.0 FIELD AND LABORATORY INVESTIGATIONS ..................... 1 k 4.0 GENERAL SITE CONDITIONS 4.1 Site Description ........................................ 2 4.2 Subsurface Soil Conditions ................................. 2 4.3 Subsurface Water Conditions ............................... 2 5.0 ANALYSIS AND RECOMMENDATIONS 6.0 7.0 8.0 5.1 5.2 5.2.1 5.2.2 5.3 Lateral Earth Movements .................................. 3 Pavement ............................................ 3 Soil Stabilization ....................................... 4 Subbase Preparation ..................................... 4 General .......................................... : .. 4 RECOMMENDATIONS FOR THE PLACEMENT OF CONTROLLED EARTHFILL 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 Site Grading .......................................... 5 Fill Materials .......................................... 5 Depth of Mixing of Fill Layers .............................. 5 Rock ............................................... 5 Moisture Content ...................................... 5 Amount of Compaction ................................... 6 Compaction of Fill Layers ................................. 6 Density Tests .......................................... 6 Trenching ............................................ 6 Excavation ........................................... 6 CONSTRUCTION OBSERVATIONS .............................. 7 REPORT CLOSURE ......................................... 8 F' ILLUSTRATIONS Plate PLAN OF BORING .............................................. 1 LOGS OF BORING ............................................ 2-3 UNIFIED SOIL CLASSIFICATION SYSTEM ............................ 4 KEY TO CLASSIFICATIONS AND SYMBOLS ........................... 5 Page FIELD OPERATIONS .......................................... A-1 LABORATORY TESTING ....................................... A-2 SUMMARY OF FREE SWELL TESTS .............................. A-3 I e i'" 1.0 INTRODUCTION The proposed project will consist of improving a portion of the existing Coppell Road in Coppell, Texas. These improvements will include re~paving the existing section of road and installing a new waterline and storm water conveyance system. The general location and orientation of the site are shown on the Plan of Borings, Plate 1, in the Illustrations section of this report. The data contained herein will be used to evaluate the economic and engineering feasibility of the proposed improvements. 2.0 PURPOSES AND SCOPE OF STUDY The principal purposes of this investigation were to evaluate the general soil conditions at the proposed site and to develop recommendations for the design and construction of the proposed improvements. To accomplish its intended purposes, the study was conducted in the following phases: (1) (2) (3) drill sample borings to evaluate the soil conditions at the boring locations and to obtain soil samples; conduct laboratory tests on selected samples recovered from the boring to establish the pertinent engineering characteristics of the soils; and perform engineering analyses, using all field and laboratory data, to develop design criteria. 3.0 FIELD AND LABORATORY INVESTIGATIONS Soil conditions were determined by 4 sample borings drilled to a depths ranging from 7 to 15 feet below existing grades in September 1998. The locations of the borings are shown on Plate 1. Sample depth, description of soils, and classification (based on the Unified Soil Classification System) are presented on the Logs of Boring, Plates 2 through 5 Keys to terms and symbols used on the logs are shown on Plates 6 and 7. Laboratory soil tests were performed on selected samples recovered from the borings to verify visual classification and determine the pertinent engineering properties of the soils encountered. II Classifications test results are presented on the logs of borings. Descriptions of the procedures used in the field and laboratory phases of this study are presented in the Appendix of this report. 4.1 4.0 GENERAL SITE CONDITIONS Site Description The site of the proposed roadway improvements are shown on Plate 1. investigation, the surface of the roadway was asphattie concrete. At the time of this 4.2 Subsurface Soil Conditions Geologically the site is located within the Terrace Deposits underlain by the Woodbine Formation. Soil conditions were determined by 4 sample borings drilled to depths ranging from 7 to 15 feet below existing grades. The materials encountered at the test boring locations consisted of sand, clayey sand and sandy clay. Their colors were brown and tan. 4.3 These soils are non plastic (NP) to low plastic with Plasticity Indices (PI) ranging from non plastic (NP) to 26. At the time of this investigation, the soils were found to be in a medium dense condition and hard in consistency. Subsurface Water Conditions All the borings were advanced using auger drilling and intermittent sampling methods in order to observe groundwater seepage. At the time of this investigation, groundwater seepage was not encountered in any of the borings. Future construction activities may alter the surface and subsurface drainage characteristics of this site. It is not possible to accurately predict the magnitude of subsurface water fluctuations that might occur based upon short-term observations. If there is any change from the conditions reported herein, Rone Engineers, Inc. should be notified immediately to review the effect it may have on design recommendations. 5.0 ANALYSIS AND RECOMMENDATIONS 5.1 LATERAL EARTH PRESSURES If components are installed which require consideration of lateral earth pressures, the following table is provided for the design parameters. Equivalent Fluid Pressure psf/ft of Backf ,all Depth Above Water Table * Condition Coefficient Drained Saturated Below Water Table Active KA = 0.49 59 63 96 At Rest Ko = 0.66 79 85 106 Passive Kp = 2.04 816'* 832** 767** [* Includes cohesion Ko = 0.45 for flee draining sand or gravel Ko = 0.55 for select fill (PI > 2, < 12) 5.2 Pavement The existing pavement along the section of the proposed improvements consisted of approximately 2.5 inches of asphaltie concrete over about an inch of crushed rock. For the proposed new section we can recommend seven inches Portland Cement Concrete (PCC). The subgrade should be prepared, as explained in Section, 5.2.2 and 6.0 Recommendations for the Placement of Controlled Earthfill. Also, the final grades must be such that drainage is facilitated, and access of surface water to the subgrade materials is prevented. Water can be introduced beneath the road through utility line embedment and can cause differential movement in the roadway. All utilities should have clay plugs substituted for embedmerit at the edges of the pavement ends to prevent moisture access and possible swelling. 5.2.1 5.2.2 Soil Stabilization The subgrade soils are non-plastic (N'P) to low plastic; therefore, lime stabilization will not be required. However, the subgrade modulus can be improved by the addition of cement. sXmay be accomplished by usin~ cement by dry weight of soil should b SubbEe Preparation All existing pavement should be removed. elevations. Grade the areas to be paved to the required Following the undercutting, the subbase should be scari~ed to assure uniform pavement subgrade. If stabilization is desired a six percent by dry weight application of cement should be used. 5.3 General Every attempt should be made to limit the extreme wetting or drying of the subsurface soils since swelling and shrinkage will result. Standard construction practices of providing good surface water drainage should be used· A positive slope of the ground away from the foundation and ditches or swales provided to carry off the run-off water both during and after construction are necessary. ; .., 6.0 RECOMMENDATIONS FOR THE PLACEMENT OF CONTROLLED EARTHFILL 6.1 Site Gradint' Site grading operations, where required, should be performed in accordance with the recommendations provided in this report. The site grading plans and consauction should strive to achieve positive drainage around all sides of the proposed structure. Inadequate drainage around structures built on grade will cause excessive vertical differential movements to occur. 6.2 6.3 Fill Materials On-site material can be used to backfill trenches. Any other materials to be used for ~l should be approved by the Soils Engineer. There should be no roots, vegetation or any other undesirable matter in the soil, and no rocks larger than 6 inches in diameter. Depth of Mixhat, of m Layers The fill material should be placed in level, uniform layers, which, when compacted, should have a moisture content and density conforming to the stipulations called for' herein. Each layer should be thoroughly mixed during the spreading to insure the uniformity of the layer. The fill thickness should not exceed 6-inch loose lifts. 6.4 Rock There should be no rock incorporated within the fill which exceeds 6 inches in its greatest dimension. 6.5 Moisture Content Prior to and in conjunction with the compacting operation, each layer should be brought to the proper moisture content as determined by ASTM D 698, within 3 percentage points of 5 RoneEngineers Illlllllll !' optimum for fill containing limestone and between optimum and five percentage points above the optimum for clayey soils. 6.6 Amount of Compaction After each layer has been properly placed, mixed and spread, it should be thoroughly com- pacted to between 95 and 100 percent. of Standard Proctor Density as determined by ASTM D 698. 6.7 Compaction of Fill Layers Compaction equipment should be of such design that it will be able to compact the fill to the specified density. Compaction of each layer shall be continuous over its entire area. 6.8 Density Tests Field Density tests should be made by the Soils Engineer or his representative. Density tests should be taken in the compacted material below the disturbed surface. After each layer of fill, compaction tests, as necessary, should be made by the Engineer. If the materials fail to meet the density specified, the course should be reworked as necessary to obtain the speci- fied compaction. 6.9 Trenching The contractor is responsible for preparing a trench safety plan in those instances where the trenches are deeper than five feet. Because of the location of the proposed line in the streets or rights-of-way, and the limited mount of coustmction space available, it is anticipated that vertical walls will be necessary. This will require the use of shoring or trench shields whenever the trenches are in fill, clay or weathered limestone. 6.10 Excavations No heavy excavation equipment will be required for utility excavations. 6 F1oneEngineers Immlmll 7.0 CONSTRUCTION OBSERVATIONS In any geotechnical investigation, the design recommendations are based on a limited amount of information about the subsurface conditions. In the analysis, the geotechnical engineer must assume the subsurface conditions are similar to the conditions encountered in the borings. However, during construction quite often anomalies in the subsurface conditions are revealed. Therefore, it is recommended that Rone Engineers, Inc. be retained to observe the construction and perform materials evaluation and testing during the construction phase of the project. This enables the geotechnical engineer to stay abreast of the project and to be readily available to evaluate unanticipated conditions, to conduct additional tests if required and, when necessary, to recommend alternative solutions to unanticipated conditions. 8.0 REPORT CLOSURE The locations and elevations of the borings should be considered accurate only to the degree implied by the methods used in their determination. The boring logs shown in this report contain information related to the types of soil encountered at specific locations and times and show lines delineating the interface between these materials. The logs also contain our field representative's interpretation of conditions that are believed to exist in those depth intervals between the actual sample taken. Therefore, these boring logs contain both factual and interpretive information. Laboratory soil classification tests also were performed on samples from selected depths in the borings. The results of these tests, along with visual-manual procedures, were used to generally classify each stratum. Therefore, it would be understood that the classification data on the logs of borings represents visual estimates of classifications for those portions of each stratum on which the full range of laboratory soil classification tests were not performed. It is not implied that these logs are representative of subsurface conditions at other locations and times. With regard to ground- water conditions, this report presents data on ground-water levels as they were observed during the course of the field work. In particular, water level readings have been made in the borings at the times and under conditions stated in the text of the report and on the boring logs. It should be noted that fluctuations in the level of the ground-water table can occur with passage of time due to variations in rainfall, temperature and other factors. Also, this report does not include quantitative information on rates of flow of ground water into excavations, on pumping capacities necessary to dewater the excavations, or on methods of dewatering excavations. Unanticipated soil conditions at a construction site are commonly encountered and cannot be fully predicted by mere soil samples, test borings or test pits. Such unexpected conditions frequently require that additional expenditures be made by the owner to attain a properly designed and constructed project. Therefore, provision for some contingency fund is recommended to accommodate such potential extra cost. The analyses, conclusions and recommendations contained in this report are based on site conditions as they existed at the time of the field investigation and further on the assumption that the exploratory borings are representative of the subsurface conditions throughout the site; that is, the subsurface conditions everywhere are not significantly different from those disclosed by the borings at the time they were completed. If during construction, different subsurface conditions from those encountered in our borings are observed, or appear to be present in excavations, we must be advised promptly so that we can review these conditions and reconsider our recommendations where necessary. If there is a substantial lapse of time between submission of this report and the start of the work at the site, if conditions have changed due either to natural causes or to construction operations at or adjacent to the site, or if structure locations, structural loads or finish grades are changed, we urge that we be promptly informed and retained to review our report to determine the applicability of the conclusions and recommendations, considering the changed conditions and/or time lapse. [- Further, it is urged that Rone Engineers, Inc. be retained to review those portions of the plans and specifications for this particular project that pertain to earthwork and foundations as a means to determine whether the plans and specifications are consistent with the recommendations contained in this report. In addition, we are available to observe construction, particularly the compaction of structural fill, or backfill and the construction of foundations as recommended in the report, and such other field observations as might be necessary. The scope of our services did not include any environmental assessment or investigation for the presence or absence of wetlands or hazardous or toxic materials in the soil, surface water, ground water or air, on or below or around the site. This report has been prepared for use in developing an overall design concept. Paragraphs, statements, test results, boring logs, diagrams, etc. should not be taken out of context and. should not be utilized without a knowledge and awareness of their intent within the overall concept of this report. The reproduction of this report, or any part thereof, supplied to persons other than the owner, should indicate that this study was made for design purposes only and that verification of the subsurface conditions for purposes of determining difficulty of excavation, trafficability, etc. are responsibilities of the contractor. This report has been prepared for the exclusive use .of Freese and Nichols and their designated agents for specific application to design of this project. The only warranty made by us in connection with the services provided is that we have used that degree of care and skill ordinarily exercised under similar conditions by reputable members of our profession practicing in the same or similar locality. No other warranty, expressed or implied, is made or intended. 10 PoneEngineers L_, FIELD OPERATIONS Subsurface conditions were defined by 4 sample borings located as shown on the Plan of Borings, Plate 1. The borings were advanced between sample intervals using auger drilling procedures. The results of each boring are shown graphically on the Logs of Borings, Plates 2 through 5. Sample depth, description, and soil classification based on the Unified Soil Classification System are shown on the logs of borings. Keys to the symbols and terms used on the logs of borings are presented on Plates 6 and 7. Relatively undisturbed samples of cohesive soils were obtained with Shelby robe samplers at the locations shown on the logs of boring. The Shelby robe sampler consists of a thin-walled steel robe with a sharp cutting edge connected to a head equipped with a ball valve threaded for rod connection. The robe is pushed into the undisturbed soils. The soil specimens were exmaded from the robe in the laboratory, logged, tested for consistency with a hand penetrometer, sealed, and packaged to maintain "in sire" moisture content. The consistency of cohesive soil samples was evaluated in the field using a calibrated hand penetrometer. In this test a 0.25-inch diameter piston is pushed into the undisturbed sample at a constant rate to a depth of 0.25-inch. The results of these tests are tabulated at respective sample depths on the logs. When the capacity of the penetrometer is exceeded, the value is tabulated as 4.5 +. Disturbed samples of the noncohesive granular or stiff to hard cohesive materials were obtained utilizing a two (2) inch O.D. split-spoon sampler in conjunction with the Standard Penetration Test (ASTM D 1586). This test employs a 140 pound hammer that drops a free fall vertical distance of 30 inches, driving the split-spoon sampler into the material. A 1 RormEngineers The number of blows required for 18 inches of penetration is recorded and value for the last 12 inches, or the penetration obtained from 100 blows, is reported as the Standard Penetration Value (N) at the appropriate depth on the attached "Log of Borings". Ground-water obsetwations during and after completion of the boring are shown on the upper right of the boring log. Upon completion of the boring, the bore holes were backfilled from the top and plugged at the surface. LABORATORY TESTING General Laboratory tests were performed to define pertinent engineering characteristics of the soils encountered. The laboratory tests included moisture content, Atterberg limits determination, unconfined compressive strength, unit weight determinations, free swell tests, and visual classification. Classification Tests Classification of soils was verified by natural moisture content determinations, and Alterberg limits determinations. These tests were performed in accordance with the American Society for Testing and Materials (ASTM) Procedures. The Atterberg limits and natural moisture content determinations are presented at the respective sample depths on the logs of boring. A3 RoneEnglneers /lllllll F' ROUND GROVE RD FM3040 rn z CORPORATE ~' '~M B4 ' ~ ~' · I PARKYVAY RD ANDERSON-GIBSON z - ~ RUBY ; FOR THE PURPOSE OF CLARITY, NOT ALL STREETS IN THIS GRID ARE SHOWN Rone Engineers, Inc. ~....~ COPPELL ROAD IMPROVEMENTS RONE ENGINEERS, INC. D... F..w~ COPPELL. TEXAS ~.-. sy C. Ray I D.. ~. 10120/98 ~ none I ~""~' G84066-01 PLAN OF BORINGS PLATE 1 Location kePt·t· 1 Comptetion I Cmptetion Depth 15.0' DaTe 9/29/96 · Surface Erevat·on Type Auger Strata Description . "thick, ,/1" of roadlase lillt,_tannleh bf,Nn, ~ s~mme ·itt, Iravet and traces, fine grained, media dense I, - N k. 3 X :Zla. 4-'0 X X X-- l* 3. hi gl O O L, 4- f,:2 \ \l · C · '0 .... :It QU · · Zb. -- · --4- 4-4- +- X 4- · \ ) I) :~-- II-- II 14- 4-. C OCf~ II g'i Ii ·~ --I: --I --I . · C O0 C~3 0 0.7 22/12" UP r: ,vFY ®,~ ~, ,~-rk reddish broun, w/trace of grey·t, media des· 17/12" SMm,_broin, w/art round graveL, fine grained UP 2.0 - same, coarse, dark reddish kH'Oun, W/mrbte sized graver LOG OF BORING NO. B1 PLATE 2 Project Ito. M-4~66-01 Locatlan I I or|rig Be. 12 See PLate 1 CcepLetjon Depth 7.0' ~ · l ICompLetion Date 9129196 Surface ELevation Project CoppaLL Rcld Improveants CappeLt, Texas Mater Observations Boring cavedat 7 feet beLoigroundsurfece. Boring k~S dry upon completion. Type Stratus Description __~eDb~T, 2" thick, ~/1" thick emd and grav~_ u~clerneath ~ r~ ~ ~, ~ greet tr~e, elm C 0 31 X ILl I O O L4- \l · £ - ~ o -- - -- :3C QU 3 e) ~1-- I-- el I,I- 4- · OC(~ le rl II e~ --C --I · · I: oo cn 10/12" NP 3.0 reddish brown r'J AyEy e,Jl,_r. eddt sh br~n \ e C 3 O O. [: i LOG OF BORING Ii0, PLATE F' project IIo. I Boring I1o. G8-/>066-01 83 Lotion SEE PLate 1 Campration I CcxmpLetion Depth 7.0; DIre 9/Z9/98 Surface ELevltion ~ · b.o · o. fA FI · Project Col·it Road !lkrov!vl~ts CoppeLt. Texas Mater Observations Boring caved at 7 fat baLm·ground surface. Boring ,as drTulxm completion. Type Stratum Description _~,e,... T. 1.5" thick. ,/1" sublase underneath/- SXLX)Llli~_tight reddish broun. ,/gravel C O 21 X 4. b.e · 0 0 L4- \l · C - 13 .... :2C eo(l:. -- I --4. 4-4- 4- x 4- · \ 2 I) :1-- I-- II 14- 4- · OCl/; el Irl II I~ --C --I · I-- Coo ~eil/FI LY e&.ig~br. Dkrl, id/Iole ctey ~ Limestone frets, le/trace of asphalt, Bedim dense (POSSIBLE FILL) r~$,s~-~ es~ , kfoun, el timtone fragments And gravel traces. some car·anted portions 15/12" 6.0 23.0 10.0 13.0 Ro~eEnafreerm \ e C :2 o i. LOG OF BORING NO. PLATE Project No. I Ior|ng No. M-/d)t6-01 14 Location See PLate 1 Cmptetion I Cmltetion D~th 7.0; Date 9/29/98 Suffice Et~vatron _ -1 -2 -3 -& . Project Cq~ett RoBd Improvements Copper t, Texas gBter Obe4rvattona Boring caed st 7 feet beto~ ground turface. Boring k~S dry upon colptetion. Type $trattal Description aWe:T, V/road sublace of reddish Etaan --~ clayey sand and gravel r~ aVEr e,.ll4_~rk broun, ,/gravel lILT/ea~' y fi &y, heOtll /-- f, - N C 0 \l · C - 12 aiM. -- I --4- .I...1- 4- x 3 I) :3-- I-- le --a · e-- Ill, l- 8,14 dd 37.0 11.0 26.0 Cl4t,_ sandy, d~rk Etotm and reddish Etoan, Bottled, hard &.r~. \ e 'o C o O. LOG OF BORING NO. PLATE M A T CH L INE S 5� -0 Z -T 0 > , t ED Q { Fri t 0 - - z • 0 co C, ry A IN /I I- f A i 0 LL- M A T CH L INE S 5� -0 Z -T 0 > � { Fri cu F F 00 0 iJ m 5 0 11 Cf') T V'll z NEW 12" PC = 52+89.27 5' SIDEWALK UTILITY ESN' cx� m""ATCH. LINE STA. 45+50 mm 0 50 100 2•(l - — > DO F- I < "A 0 0 ell ■ ROW ROW 484 77' 480 - --------- 4A2.1 -60 -40 0 0 20 40 60 STA. 10+00 ROW r� ROW ROW 0 �i? � { ' 0 - - z • 0 co C, ry 0 Z • 0 LL- • (n 0 , 0 M 5 o: � 0 a. L, Q- : lz ell ■ ROW ROW 484 77' 480 - --------- 4A2.1 -60 -40 0 0 20 40 60 STA. 10+00 ROW r� ROW -6u -bu -4U - zu 0 20 40 60 STA. 20*00 MO MIMI ROW ROW 1 � { ' 4 -6u -bu -4U - zu 0 20 40 60 STA. 20*00 MO MIMI ROW ROW 0 ' LLJ Q- Q- 0 C) w m 0 f `� LL- U) � I i x ; I j � F- LLJ z 484 Cf) x u > 1 = 20' HOR 0 w V) 1 =2" I LLJ .BERT n LLj : n 0 10 0 34 CD < Elf z < 00 T --------------- Lli Of 50 0 Lf) 1 484 6 > ------ 480 Q- 00 0) co C; 0 i x 3: �80 Z r m 0 LLJ Lu fl Z Liles Li F Z LJ Z w \e LCL 10 w Q --oo -6u -bu -4U - zu 0 20 40 60 STA. 20*00 MO MIMI ROW ROW ' o f `� � I i � { j r ; I j � � t> 484 0 00 T --------------- 0 Lf) 1 484 6 > ------ 480 -bu -4U - zu u 20 40 60 S TA. 48+ 00 I I I I I N Z o SHEET SEQ.