Freeport NIP(7.2)-LR001020 GEOTECJ-NICAL AND E~J ~ I"'1 I I p
--'",1¥ I R O 1',, M E N - ~ L CONSU_TA'NT~,
October 20, 2000
Project No. 6591
Report No. 92
Duke-Weeks Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Paul Brown
Re: Structural Steel Inspection
Freeport V
Royal Lane and Creekview
Coppell, Texas
Gentlemen:
Transmitted here are the results of the structural steel inspection performed at the referenced
site for Reed Engineering Group, Inc. on October 4, 2000, by Contract Inspection Service.
Should you have any questions, please do not hesitate to call.
Sincerely,
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
JFP/cg
copies submitted: (1) Duke-Weeks Realty Corporation/Mr. Paul Brown
(1) Hardy McCullah/MLM Architects/Mr. Norman Coates
(1) TMBP - Consulting Engineers/Mr. Frank Men'itt
(1) Pacheco Koch/Mr. Jim Koch
(1) Hill & Wilkinson, Inc./Mr. Steve Camp
(1) City of Coppell/Mr. Lee Stone or Mr. Larry Davis
2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · -EL [214] 350 5600 · FAX [214] 350 0019
CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
STRUCTURAL ERECTION INSPECTION
Project: Freeport V Report No: 19149-0
Coppell, Texas Attention: Keith Atkins
Client: Reed Engineering Group Date of Service: 10-4-00
2424 Stutz, Suite 400
Dallas, TX 75235 Page 1 of 1
REPORT OF INSPECTION
Drawings utilized: Contract Documents
Locations/item inspected: As noted below
Discrepancies/comments:
A visual inspection was scheduled to be performed on the aboved referenced project.
Upon arrival to job site it was found that erector had not completed area to be inspected.
Inspection will be rescheduled.
Tim Glazier, CWI #98020281
Technician ontract Inspection Service
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client