Loading...
Freeport NIP(6)-CS 980223 COPPELL, TEXAS 75019 Robert Ahmuty MEPC American Properties 15301 Dallas Parkway, Suite 700 LB 10 Dallas, TX 75248 Freeport North, Block 1, Lot 1 (MEPC # 4) Development Fee Assessment, P.O. Box 478 Coppell, Texas 75019 972-462-0022 February 23, 1998 Dear Mr Ahmuty: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $27,369.05 and forward to thc Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~ ,P.E. Director of Enginccrin§ & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Date: Freeport North, Block 1, Lot 1 (MEPC # 4) 2/23/98 TOTAL AMOUNT~DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,655.08 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Park Fee $0.00 N/A (100 % due prior to Council Approval) Roadway Impact Fee $15,444.05 $15,444.05 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $30,565.11 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $27,369.05 DEVELOPMENT FEE WORKSHEET PROJECT: Freeport North, Block 1, lot 1 (MEPC # 4) DATE: 2/23/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's I - 2 inch = 8 ESU's = ESU's I - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 es. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: I Fireline Meter(s) @ (100% due prior to issuance of water meters) $195.98 $2,459.10 Water Meter Deposit Fee (Domestic): Total #: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Water Meter Deposit Fee (Irrigation/Fireline): Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @ $450.00 ea. $8,325.00 50.00 $195.98 $195.98 $0.00 $2,459.10 $35.00 $60.00 $3,600.00 Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $50.00 $50.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit {50% paid prior to Council apprOval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A . $15,444.05 Information not available at this time Street Sign Fees: Assessed for slgnage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts. · See Attached Roadway Impact Fee Calculation Sheets ROADWAY IMPACT FEE CALCULA] iONS PROJECT: DATE: Freeport North, Block 1, Lot 1 (MEPC # 4) 2/23/98 ROADWAY IMPACT FEE: The total square footage for this building is125,103. Since the proposed use of this building is not known at this time, the following assumption were made: 20% office (25,021 s.f.), 80% warehouse (100,082 s.f.) If the office use increases then a reassessment will be performed to determine the additional Roadway Impact Fee that must be paid prior to a Certificate of Occupancy. Service Area * 4 Category ** Office Land Use ** Bnildi-~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** :ee per Vehicle Mile *** ~oadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee Per Vehicle Mile) = General Office Buildin~ 25,021 25.021 3.99 $300 $29,950.14 Service Area * 4 Category ** Industrial Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles Per Development Unit ** Fee Per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee Per Vehicle Mile) = General Li~tt Industrial 100,082 100.082 1.06 $3OO $31,826.08 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Total before credit = $61,776.22 75 % Credit as per approval by City Manager = $46,332.17