Loading...
Freeport NIP(6)-CS 980210/ Halff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS ° SURVEYORS 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214) 739-0094 FAX (214) 739-0095 February 10, 1998 Michael A. Martin, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 RE: Freeport North, Block 1, Lotl (MEPC #4) Dear Mr. Martin: HalffAssociates has received and reviewed the attached comments from the City of Coppell for the referenced project and has the following responses to offer: 1. Halff concurs on review comments #1-#6, #8, and #9 2. Review comment #7: The percent slope for the storm drainage line E is shown on sheet STM-1. Thank you for your prompt attention to this project. It has been a pleasure working with you on this project. If you have any questions concerning these responses, please give me a call at (214) 739-0094. Sincerely, Todd Jackson DALLAS · FORT WORTH · HOUSTON · McALLEN TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL ° ENVIRONMENTAL ° STRUCTURAL MECHANICAL ° ELECTRICAL · SURVEYING · GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING  COPPELL, TEXAS 75019 February 6, 1998 P.O. Box 478 Coppell, Texas 75019 972-462-OO22 Pat Acker, P.E. Albert H. HalffAssoc., Inc. 8616 Northwest Plaza Drive Dallas, Texas 75225 RE: Freeport North, Block 1, Lot 1 (MEPC tt 4~ Dear Mr. Acker. The City of COppetl has received and reviewed the referenced plans and has the following comments to offer: o 7. 8. 9. On the cover sheet provide the legal description of the property' being developed. On the grading plan show the median on Northpoint Drive to be removed at the northwest com~ of the development. Provide a ,minimum slope of 4 percent where the water line is being located between MEPC III and MEPC YV. On the grading plan show the location of the proposed storm drainage inlets. Ixx:ate the proposed waterline on the west side of the development outside the limits of the future paving. Show the location of the stabilized construction exit on the erosion control plan. Show the pement slope for the storm drainage line E on the profile ,,dew. On the drainage mea map show the location of the existing and proposed storm sewer systems. The Traffic Control Detail for the intersection of Northpoint Drive and Royal Lane needs to be clahfied. Are you proposing to close Northpoint Drive? There are various other minor comments throughout the plans. Once these comments have boe. n addressed, the revised set of plar[q should be resubmitted to the City for review. If you should have any questions concerning these comments, please ct,nmct me at (972)304-3681. Michael A. Martin, P.E. Assistant City Engineer