Freeport NIP(2.5)-LR 980218 (2) GEOTECHNICAL AND ~ ~ I~ LJ P
ENVlRON~IENTAi CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppeli, Texas
REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 6
3811 Turtle Creek Boulevard DATE OBSERVED: 02-06-98
Suite 730 REPORT DATE: 02-18-98
Dallas, Texas 75219 REG PROJECT NO. 4115
ATTN: Mr. Richard Crow TECHNICIAN: F. Steadman
PAGE: 1 of 1
CONTRACTOR:. McFadden & Miller
On this date a representative of the Reed Engineering Group, Inc. observed water
injection operations on the referenced project. The injection operations proceeded in
accordance with project specifications unless otherwise noted.
I 8 5 100-200 12-18
Area Injected This Date: 31,000 Sq.ft.
Average Pressure: 100 PSI
Pass No.: 1
Surfactant added at regular intervals: Yes
Distribution: (4) Myers & Crow Company, Ltd./ Submitted by:
Mr. Richard Crow
(1) AECC, Inc./Mr. Andy Brundige REED ENGINEERING GROUP, INC.
(1) Dockery Engineering/
Mr. Bill Wray Original Signed By
(1) McFadden & Miller/
Mr. Jon Jacobson Ronald F. Reed, P.E.
(1) Halff Associates/Mr. Pat Acker
(1) Pritchard Associates/ KEA/rls
Mr. Jim Pritchard
(1) O'Brien & Associates/
Mr. Mick Granlund
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] 350 0019