Loading...
Freeport NIP(2.5)-LR 980218 (2) GEOTECHNICAL AND ~ ~ I~ LJ P ENVlRON~IENTAi CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppeli, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 6 3811 Turtle Creek Boulevard DATE OBSERVED: 02-06-98 Suite 730 REPORT DATE: 02-18-98 Dallas, Texas 75219 REG PROJECT NO. 4115 ATTN: Mr. Richard Crow TECHNICIAN: F. Steadman PAGE: 1 of 1 CONTRACTOR:. McFadden & Miller On this date a representative of the Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. I 8 5 100-200 12-18 Area Injected This Date: 31,000 Sq.ft. Average Pressure: 100 PSI Pass No.: 1 Surfactant added at regular intervals: Yes Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Andy Brundige REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson Ronald F. Reed, P.E. (1) Halff Associates/Mr. Pat Acker (1) Pritchard Associates/ KEA/rls Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] 350 0019