Loading...
Freeport NIP(2.5)-LR 980312 (2) GEOTECHNICAL AND G F~J D U J~ ENVIRONPIENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 11 3811 Turtle Creek Boulevard, Suite 730 REPORT DATE: 03-12-98 Dallas, Texas 75219 REG PROJECT NO. 4115 ATTN: Mr. Richard Crow TECHNICIAN: F. Steadman PAGE: 1 of 1 CONTRACTOR:. McFadden & Miller On the referenced dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. 8 5 100-200 12-18 3 4 10 5 1 02-19-98 22,500 1 O0 1 2 02-20-98 16,000 1 O0 1 3 02-20-98 8,800 1 O0 4 4 02-21-98 18,000 1 O0 1-2 5 02-21-98 9,600 100 4 Surfactant added at regular intervals: Yes Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Andy Brundige REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson (1) Halff Associates/Mr. Pat Acker Ronald F. Reed, P.E. (1) Pritchard Associates/ KEA/rls Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019